Construction Report
Select Location
  
Updated: 10/25/14 8:00 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
91st St to 107th St Major All lanes and shoulders closed 8/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Stage 3 - Traffic Pattern. NB traffic will use crossover, north of 91st, and utilize lane 1 of the SB side. NB traffic is then put back into the NB side north of 107th through another crossover.
Exit ramp to NEB WI-144 Major All lanes and shoulders closed 7/21/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 North to WIS 60 West to WIS 144 N
Entrance ramp from SWB WI-144 Major All lanes and shoulders closed 4/25/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 east to US 41

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SWB WI-144 Major All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 South to WIS 60 West to WIS 144 north
Entrance ramp from WI-144 Medium All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 East to US 41 south
91st St to Congress St Major Right two lanes closed, one lane open 8/26/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 12/6/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Sat Oct 25 20:01:20 CDT 2014