Construction Report
Select Location
  
Updated: 10/30/14 11:30 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
at 12th St (-0.3 miles) 339.2 Medium Right lane closed, two lanes open 10/30/14 7:00 AM to 5:00 PM daily until 10/31/14 WisDOT Construction - ATC Overhead Transmission Line Crossing Just south of CTH E. DOT Permit # 30U-27-14
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 11/21/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 11/21/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
91st St to 107th St Major Left lane closed, two lanes open 10/29/14 1:00 PM to 11/11/14 12:00 AM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
Cedar Creek Rd to CR-K (-0.4 miles) Medium Right lane closed, one lane open 10/30/14 6:30 AM to 3:00 PM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
Cedar Creek Rd to CR-K (-0.4 miles) Medium Right lane closed, one lane open 10/31/14 6:30 AM to 11:00 AM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
Exit ramp to NEB WI-144 Major All lanes and shoulders closed 7/21/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 North to WIS 60 West to WIS 144 N
Entrance ramp from SWB WI-144 Major All lanes and shoulders closed 4/25/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 east to US 41

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-K (+0.2 miles) to Cedar Creek Rd Medium Right lane closed, one lane open 10/30/14 9:00 AM to 4:00 PM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
CR-K (+0.2 miles) to Cedar Creek Rd Medium Right lane closed, one lane open 10/31/14 9:00 AM to 4:00 PM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
Exit ramp to SWB WI-144 Major All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 South to WIS 60 West to WIS 144 north
Entrance ramp from WI-144 Medium All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 East to US 41 south
91st St to Congress St Major Right two lanes closed, one lane open 8/26/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
Wisconsin Ave to Greenfield Ave 72.1 to 311.9 Medium Left lane closed, one or two lanes open 10/30/14 9:00 AM to 2:00 PM WisDOT Maintenance - Deck Drain Repairs
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 12/6/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 10/30/14 9:00 AM to 2:00 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 10/31/14 9:00 AM to 2:00 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at 12th St (-0.1 miles) 338.9 Medium Left lane closed, two lanes open 10/30/14 7:00 AM to 5:00 PM daily until 10/31/14 WisDOT Construction - ATC Overhead Transmission Line Crossing Just south of CTH E. DOT Permit # 30U-27-14
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Oct 30 11:38:13 CDT 2014