Construction Report
Select Location
  
Updated: 5/5/15 2:20 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at CR-S (-0.2 miles) 182.9 Medium Various lanes closed 5/5/15 7:00 AM to 6:00 PM daily until 5/29/15 WisDOT Construction - Illinois State Line - Madison | Cth S, Shopiere Rd Interchange | I 39 | ROCK
at Mt Zion Ave (+0.5 miles) 172.6 Minor Right lane closed, one lane open 5/5/15 9:00 PM to 5/6/15 5:00 AM WisDOT Maintenance - Hazmat Removal
Lake Drive Rd (-0.1 miles) to WI-106 161.7 to 159.2 Medium Left lane closed, one lane open 5/5/15 8:00 PM to 5/6/15 5:00 AM daily until 5/8/15 WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
at Patton Rd (-0.1 miles) 122.8 Medium Right lane closed, two lanes open 5/6/15 7:30 AM to 3:30 PM WisDOT Maintenance - Beam Guard Repair
CR-J (-0.1 miles) to Kent Rd 115.7 to 114.3 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Entrance ramp from SB US-151 136.2 Major Various lanes closed 5/5/15 7:00 PM to 5/6/15 6:00 AM daily until 5/22/15 WisDOT Construction - Detour: USH 151S, Exit 97B N/W IH39/90/94, Exit 132 USH 51S, On Ramp S/E IH 39/90/94
WI-106 to Lake Drive Rd (+0.1 miles) 159.2 to 161.7 Medium Left lane closed, one lane open 5/5/15 8:00 PM to 5/6/15 5:00 AM daily until 5/8/15 WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Plank Rd to Plank Rd 29.1 to 29.1 Medium Right lane closed, one lane open 4/27/15 5:00 AM to 5/29/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
County Road D (+0.2 miles) to Bowers Rd (+0.3 miles) 33.0 to 33.6 Medium Right lane closed, one or two lanes open 5/4/15 5:00 AM to 5/8/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Miramar Rd to Miramar Rd (+0.5 miles) 40.7 to 41.3 Medium Right lane closed, one lane open 5/6/15 5:00 AM to 5/8/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Stone School Rd to WI-83 (+0.9 miles) 42.1 to 44.0 Medium Left lane closed, one lane open 5/4/15 5:00 AM to 5/6/15 5:00 AM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
116th St to US-45 (+0.1 miles) 58.9 to 4.7 Medium Left lane closed, up to one lanes open 5/5/15 9:30 PM to 5/6/15 5:30 AM WisDOT Construction - ROCK FREEWAY | HALE INTERCHANGE B-40-300-305,322 | I 43 | MILWAUKEE
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
WI-83 (-1.0 miles) to Stone School Rd 44.1 to 42.1 Medium Left lane closed, one lane open 5/4/15 5:00 AM to 5/6/15 5:00 AM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
WI-83 to Miramar Rd 43.2 to 40.8 Medium Right lane closed, one lane open 5/6/15 5:00 AM to 5/8/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Townline Rd to Bowers Rd 35.1 to 33.3 Medium Right lane closed, one or two lanes open 5/4/15 5:00 AM to 5/8/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Entrance ramp from SB US-151 136.2 Major Various lanes closed 5/5/15 7:00 PM to 5/6/15 6:00 AM daily until 5/22/15 WisDOT Construction - Detour: USH 151S, Exit 97B N/W IH39/90/94, Exit 132 USH 51S, On Ramp S/E IH 39/90/94
WI-106 to Lake Drive Rd (+0.1 miles) 159.2 to 161.7 Medium Left lane closed, one lane open 5/5/15 8:00 PM to 5/6/15 5:00 AM daily until 5/8/15 WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at CR-S (-0.2 miles) 182.9 Medium Various lanes closed 5/5/15 7:00 AM to 6:00 PM daily until 5/29/15 WisDOT Construction - Illinois State Line - Madison | Cth S, Shopiere Rd Interchange | I 39 | ROCK
at Mt Zion Ave (+0.5 miles) 172.6 Minor Right lane closed, one lane open 5/5/15 9:00 PM to 5/6/15 5:00 AM WisDOT Maintenance - Hazmat Removal
Lake Drive Rd (-0.1 miles) to WI-106 161.7 to 159.2 Medium Left lane closed, one lane open 5/5/15 8:00 PM to 5/6/15 5:00 AM daily until 5/8/15 WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
at Patton Rd (-0.1 miles) 122.8 Medium Right lane closed, two lanes open 5/6/15 7:30 AM to 3:30 PM WisDOT Maintenance - Beam Guard Repair
CR-J (-0.1 miles) to Kent Rd 115.7 to 114.3 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Entrance ramp from SB US-151 136.2 Major Various lanes closed 5/5/15 7:00 PM to 5/6/15 6:00 AM daily until 5/22/15 WisDOT Construction - Detour: USH 151S, Exit 97B N/W IH39/90/94, Exit 132 USH 51S, On Ramp S/E IH 39/90/94
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/9/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
122nd St (+0.5 miles) to IL-21 349.0 to 7.6 Medium Various lanes closed 5/3/15 7:00 AM to 10/31/15 3:00 PM Lake County Resurfacing

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-21 to 122nd St (-0.5 miles) 7.6 to 349.0 Medium Various lanes closed 5/3/15 7:00 AM to 10/31/15 3:00 PM Lake County Resurfacing
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
50th Rd to 7 Mile Rd (+1.0 miles) 331.9 to 324.9 Medium Left lane closed, two lanes open 5/5/15 7:30 AM to 3:00 PM daily until 5/8/15 WisDOT Maintenance - pavement sweeping
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 6/15/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Exit ramp to NB US-45 304.6 Major All lanes and shoulders closed 5/5/15 11:00 PM to 5/6/15 4:30 AM WisDOT Construction - Detour: Take 68th st to 76th st to Bluemound to Glenview to Watertown Plank Rd to the US45 North Ramp. OR Take the HWY 100 exit to HWY100 to North Ave to the US45 North ramp
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Willow Glen Rd to Willow Glen Rd 277.3 to 277.2 Medium Right lane closed, one lane open 5/5/15 12:00 PM to 4:00 PM WisDOT Maintenance - Beam Guard Repair
at Patton Rd (-0.1 miles) 122.8 Medium Right lane closed, two lanes open 5/6/15 7:30 AM to 3:30 PM WisDOT Maintenance - Beam Guard Repair
CR-J (-0.1 miles) to Kent Rd 115.7 to 114.3 Major Left two lanes closed, one lane open 4/28/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
4th St to Lincoln Memorial Dr 0.4 to 3.1 Medium Right lane closed, two lanes open 12/11/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to SB Jackson St 0.8 Medium All lanes and shoulders closed 12/5/14 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Traffic uses Plankinton or St. Paul James Lovell
Exit ramp to NEB Lincoln Memorial Dr 1.0 Medium All lanes and shoulders closed 5/5/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Detour EB Michigan St. to LMD

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Carferry Dr to Harbor Dr 11.1 to 13.2 Major All lanes and shoulders closed 5/5/15 10:00 PM to 5/6/15 5:00 AM daily until 5/9/15 WisDOT Construction - Detour: Detour Becher St. to I-43 NB to 794
Entrance ramp from NWB Carferry Dr 11.3 Unknown All lanes and shoulders closed 5/5/15 10:00 PM to 5/6/15 5:00 AM daily until 5/9/15 WisDOT Construction - Detour: Detour Becher St. to I-43 NB to 794
Polk St (-0.4 miles) to Polk St (-0.2 miles) 12.5 to 12.8 Medium Right lane closed, two lanes open 5/6/15 10:00 AM to 2:00 PM daily until 5/8/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Polk St (-0.4 miles) to Polk St (-0.2 miles) 12.5 to 12.8 Medium Right lane closed, two lanes open 5/5/15 7:30 PM to 5/6/15 6:00 AM daily until 5/9/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive

I-894 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Schlinger Ave (-0.1 miles) to WI-59 0.5 to 1.0 Medium Left lane closed, one or two lanes open 5/6/15 9:00 AM to 2:00 PM WisDOT Maintenance - Asphalt repair

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Oklahoma Ave to National Ave 3.0 to 2.3 Medium Left lane closed, two lanes open 5/6/15 9:00 AM to 2:00 PM WisDOT Maintenance - Asphalt repair
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from SEB Schroeder Rd Minor Right lane closed, two lanes open 3/16/15 12:00 AM to 11/20/15 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Raymond Rd to Seminole Hwy (-0.3 miles) Medium Left lane closed, up to two lanes open 3/30/15 12:00 AM to 5/29/15 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Fish Hatchery Rd to Agriculture Dr (+0.3 miles) Medium Right lane closed, two lanes open 5/5/15 7:00 PM to 5/6/15 6:00 AM daily until 5/31/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Fish Hatchery Rd to Agriculture Dr (+0.3 miles) Major Right two lanes closed, one lane open 5/5/15 8:00 PM to 5/6/15 5:00 AM daily until 5/31/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-39 (+0.3 miles) to Monona Dr (+0.7 miles) Medium Right two lanes closed, one or two lanes open 5/5/15 9:30 PM to 5/6/15 5:00 AM daily until 5/31/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
I-39 (+0.3 miles) to Fish Hatchery Rd Medium Right lane closed, two or three lanes open 5/5/15 7:00 PM to 5/6/15 6:00 AM daily until 5/31/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Monona Dr (+0.7 miles) to Fish Hatchery Rd Major Right two lanes closed, one lane open 5/5/15 8:00 PM to 5/6/15 5:00 AM daily until 5/31/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-21 to 122nd St (-0.5 miles) 7.6 to 349.0 Medium Various lanes closed 5/3/15 7:00 AM to 10/31/15 3:00 PM Lake County Resurfacing
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
50th Rd to 7 Mile Rd (+1.0 miles) 331.9 to 324.9 Medium Left lane closed, two lanes open 5/5/15 7:30 AM to 3:00 PM daily until 5/8/15 WisDOT Maintenance - pavement sweeping
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Exit ramp to SB Pilgrim Rd Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Exit SB Main Street (STH 74). Continue on Main Street to Pilgrim Road. End Detour

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB Stolper Dr Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Continue on 45SB to Main Street (STH 74) Exit Ramp. Take Main Street Exit, Turn Left onto Main Street. Continue on Main Street to Pilgrim Road. End Detour.
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/9/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
122nd St (+0.5 miles) to IL-21 349.0 to 7.6 Medium Various lanes closed 5/3/15 7:00 AM to 10/31/15 3:00 PM Lake County Resurfacing

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
116th St to US-45 (+0.1 miles) 58.9 to 4.7 Medium Left lane closed, up to one lanes open 5/5/15 9:30 PM to 5/6/15 5:30 AM WisDOT Construction - ROCK FREEWAY | HALE INTERCHANGE B-40-300-305,322 | I 43 | MILWAUKEE
Oklahoma Ave to National Ave 3.0 to 2.3 Medium Left lane closed, two lanes open 5/6/15 9:00 AM to 2:00 PM WisDOT Maintenance - Asphalt repair
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Exit ramp to WB I-94 0.5 Major All lanes and shoulders closed 3/9/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: I-894/US 45 to Beloit Rd to HWY 100 to the I-94 West Ramp. And I-894/US 45 to Greenfield to HWY 100 to the I-94 West Ramp. And US 45 North to Watertown Plank to HWY 100 to the I-94 West Ramp.
Entrance ramp from WB I-94 Major All lanes and shoulders closed 5/5/15 11:00 PM to 5/6/15 4:30 AM WisDOT Construction - Detour: Take 68th st to 76th st to Bluemound to Glenview to Watertown Plank Rd to the US45 North Ramp. OR Take the HWY 100 exit to HWY100 to North Ave to the US45 North ramp
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Exit ramp to SB Pilgrim Rd Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Exit SB Main Street (STH 74). Continue on Main Street to Pilgrim Road. End Detour

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB Stolper Dr Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Continue on 45SB to Main Street (STH 74) Exit Ramp. Take Main Street Exit, Turn Left onto Main Street. Continue on Main Street to Pilgrim Road. End Detour.
Exit ramp to SB 94th St Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Wisconsin Ave to US-18 Medium Left lane closed, two or three lanes open 5/5/15 9:30 PM to 5/6/15 5:30 AM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Entrance ramp from WB I-94 0.3 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Schlinger Ave (-0.1 miles) to WI-59 0.5 to 1.0 Medium Left lane closed, one or two lanes open 5/6/15 9:00 AM to 2:00 PM WisDOT Maintenance - Asphalt repair

WI-16 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Brown St (-0.5 miles) to Sawyer Rd Major Left lane closed, two lanes open 3/16/15 12:00 AM to 6/26/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

WI-16 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sawyer Rd (-0.2 miles) to Brown St (+0.5 miles) Major Left lane closed, two lanes open 3/16/15 12:00 AM to 6/26/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue May 05 2015 14:23:15 CDT