Construction Report
Select Location
  
Updated: 4/1/15 4:04 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-11 (-0.2 miles) to WI-11 (+0.3 miles) 28.1 to 28.6 Medium Right lane closed, one lane open 3/30/15 6:00 AM to 4/10/15 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Stone School Rd to WI-83 (+0.5 miles) 42.1 to 43.6 Medium Left lane closed, one lane open 3/27/15 5:00 AM to 4/10/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave (+0.1 miles) to WI-38 312.9 to 311.8 Major Left two lanes closed, one or two lanes open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from Lapham Blvd Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (9th & Mineral entrance ramp)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (9th & Mineral entrance ramp)
Glendale Ave to Lexington Blvd (-0.3 miles) 76.5 to 77.2 Medium Right two lanes closed, one lane open 3/31/15 11:30 PM to 4/1/15 4:30 AM WisDOT Maintenance - Pavement Repair
Exit ramp to SB Port Washington Rd 76.8 Medium All lanes and shoulders closed 4/1/15 11:30 AM to 4:30 PM WisDOT Maintenance - Detour: Use Alt. Route

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
National Ave/WI-59 to Greenfield Ave 311.5 to 312.0 Major Left two lanes and right shoulder closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT
Maple St to WI-38 312.4 to 313.1 Major Right two lanes closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance ramp)
at Lincoln Ave 313.0 Major Right two lanes closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 PM WisDOT
Entrance ramp from Lapham Blvd 312.2 Minor Various lanes closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance ramp)
Entrance ramp from Lapham Blvd 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Edgewood Ave (+1.1 miles) to Stone School Rd 44.3 to 42.1 Medium Left lane closed, one lane open 3/27/15 5:00 AM to 4/10/15 5:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
WI-11 (-0.3 miles) to WI-11 (+0.2 miles) 28.7 to 28.2 Medium Left lane closed, one lane open 3/30/15 6:00 AM to 4/10/15 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
WI-100 (-0.2 miles) to I-894 303.5 to 304.3 Major All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Take I-94 EB to HWY 100 to Greenfield to US 45 North to I-94 EB. OR Take I-94 EB to HWY 100 to Watertown Plank to US45 NB.
Entrance ramp from SB 25th St 309.3 Medium All lanes and shoulders closed 3/31/15 11:00 PM to 4/1/15 5:00 AM WisDOT
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
National Ave/WI-59 to Greenfield Ave 311.5 to 312.0 Major Left two lanes and right shoulder closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT
Maple St to WI-38 312.4 to 313.1 Major Right two lanes closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance ramp)
at Lincoln Ave 313.0 Major Right two lanes closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 PM WisDOT
Entrance ramp from Lapham Blvd 312.2 Minor Various lanes closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance ramp)
Entrance ramp from Lapham Blvd 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave (+0.1 miles) to WI-38 312.9 to 311.8 Major Left two lanes closed, one or two lanes open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from Lapham Blvd Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (9th & Mineral entrance ramp)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (9th & Mineral entrance ramp)
Exit ramp to NB 34th St 308.5 Medium All lanes and shoulders closed 4/1/15 11:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Exit ramp to NB US-45 304.6 Major All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 4:30 AM WisDOT Construction - Detour: Take I-94 WB to the 68th Exit to 76th to Bluemound to Glenview to Watertown Plank to the US45 North Ramp.
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Entrance ramp from SB US-45 304.2 Major All lanes and shoulders closed 3/25/15 10:00 PM to 4/2/15 4:30 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
4th St to Lincoln Memorial Dr 0.4 to 3.1 Medium Right lane closed, two lanes open 12/11/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to SB Jackson St 0.8 Medium All lanes and shoulders closed 12/5/14 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Traffic uses Plankinton or St. Paul James Lovell

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Carferry Dr to Lincoln Memorial Dr 3.6 to 11.3 Major All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM WisDOT
south of Hoan Bridge arches to Lincoln Memorial Dr 11.1 to 11.3 Medium Right lane closed, two lanes open 3/31/15 7:30 PM to 4/1/15 6:00 AM,
4/1/15 10:00 AM to 2:00 PM
WisDOT
Carferry Dr to Harbor Dr 11.1 to 13.2 Major All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM daily until 4/4/15 WisDOT Construction - Detour: Detour Becher St. to I-43 NB
Entrance ramp from NWB Carferry Dr 11.3 Medium All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM daily until 4/4/15 WisDOT Construction - Detour: Detour Becher St. to I-43 NB
Polk St (-0.4 miles) to Polk St (-0.2 miles) 12.5 to 12.8 Medium Right lane closed, two lanes open 4/1/15 10:00 AM to 2:00 PM daily until 4/3/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Polk St (-0.4 miles) to Polk St (-0.2 miles) 12.5 to 12.8 Medium Right lane closed, two lanes open 3/31/15 7:30 PM to 4/1/15 6:00 AM daily until 4/4/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive

I-894 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Watertown Plank Rd (-0.4 miles) to Schlinger Ave (-0.1 miles) Major All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Take US45 SB to Watertown Plank to HWY 100 to Greenfield to I-894/US45 SB OR Take US45 SB to North to HWY 100 to Greenfield to I-894/US45 SB

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Howard Ave to Cleveland Ave 4.0 to 2.5 Medium Left two lanes closed, one lane open 3/31/15 11:00 PM to 4/1/15 5:00 AM WisDOT Maintenance - Pavement Repair
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Gammon Rd (+0.2 miles) to Todd Dr (-0.4 miles) Medium Various lanes closed 3/31/15 8:00 PM to 4/1/15 5:00 AM daily until 4/4/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Entrance ramp from SEB Schroeder Rd Minor Right lane closed, two lanes open 3/16/15 12:00 AM to 11/20/15 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Raymond Rd to Seminole Hwy (-0.3 miles) Medium Left lane closed, up to two lanes open 3/30/15 12:00 AM to 5/1/15 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Raymond Rd to Seminole Hwy (+0.3 miles) Medium Left lane closed, up to two lanes open 4/1/15 9:00 AM to 3:00 PM daily until 4/3/15 WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Raymond Rd to Seminole Hwy (+0.3 miles) Medium Left lane closed, up to two lanes open 4/1/15 9:00 AM to 3:00 PM daily until 4/3/15 WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Todd Dr (+0.2 miles) to Whitney Way (+0.1 miles) Medium Various lanes closed 3/31/15 8:00 PM to 4/1/15 5:00 AM daily until 4/4/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
at Seminole Hwy (+0.3 miles) Medium Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 5:00 AM daily until 4/2/15 WisDOT Maintenance - Bridge Repair

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave (+0.1 miles) to WI-38 312.9 to 311.8 Major Left two lanes closed, one or two lanes open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from Lapham Blvd Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (9th & Mineral entrance ramp)
Entrance ramp from WB Becher St 313.0 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (9th & Mineral entrance ramp)
Exit ramp to NB 34th St 308.5 Medium All lanes and shoulders closed 4/1/15 11:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Good Hope Rd (-0.1 miles) to Hampton Ave Medium Left lane closed, one or two lanes open 4/1/15 7:00 PM to 8:30 PM WisDOT Construction - Zoo Freeway | Burleigh St - Good Hope Rd | Ush 45 | MILWAUKEE
Good Hope Rd (-0.1 miles) to Hampton Ave Major Left two lanes closed, up to one lanes open 3/31/15 8:30 PM to 4/1/15 5:30 AM WisDOT Construction - Zoo Freeway | Burleigh St - Good Hope Rd | Ush 45 | MILWAUKEE
Entrance ramp from SB 25th St 309.3 Medium All lanes and shoulders closed 3/31/15 11:00 PM to 4/1/15 5:00 AM WisDOT
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
National Ave/WI-59 to Greenfield Ave 311.5 to 312.0 Major Left two lanes and right shoulder closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT
Maple St to WI-38 312.4 to 313.1 Major Right two lanes closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance ramp)
at Lincoln Ave 313.0 Major Right two lanes closed, one lane open 3/31/15 9:30 PM to 4/1/15 5:30 PM WisDOT
Entrance ramp from Lapham Blvd 312.2 Minor Various lanes closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance ramp)
Entrance ramp from Lapham Blvd 312.2 Medium All lanes and shoulders closed 3/31/15 9:00 PM to 4/1/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Howard Ave to Cleveland Ave 4.0 to 2.5 Medium Left two lanes closed, one lane open 3/31/15 11:00 PM to 4/1/15 5:00 AM WisDOT Maintenance - Pavement Repair
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Exit ramp to WB I-94 0.5 Major All lanes and shoulders closed 3/9/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: I-894/US 45 to Beloit Rd to HWY 100 to the I-94 West Ramp. And I-894/US 45 to Greenfield to HWY 100 to the I-94 West Ramp. And US 45 North to Watertown Plank to HWY 100 to the I-94 West Ramp.
Entrance ramp from WB I-94 Major All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 4:30 AM WisDOT Construction - Detour: Take I-94 WB to the 68th Exit to 76th to Bluemound to Glenview to Watertown Plank to the US45 North Ramp.
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Burleigh St (-0.2 miles) to Hampton Ave Medium Right lane closed, two lanes open 4/1/15 7:00 PM to 9:30 PM daily until 4/2/15 WisDOT Construction - Zoo Freeway | Burleigh St - Good Hope Rd | Ush 45 | MILWAUKEE
Burleigh St (-0.2 miles) to Hampton Ave Major Right two lanes closed, one lane open 4/1/15 9:30 PM to 4/2/15 5:30 AM WisDOT Construction - Zoo Freeway | Burleigh St - Good Hope Rd | Ush 45 | MILWAUKEE

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Good Hope Rd (-0.1 miles) to Hampton Ave Medium Left lane closed, one or two lanes open 4/1/15 7:00 PM to 8:30 PM WisDOT Construction - Zoo Freeway | Burleigh St - Good Hope Rd | Ush 45 | MILWAUKEE
Good Hope Rd (-0.1 miles) to Hampton Ave Major Left two lanes closed, up to one lanes open 3/31/15 8:30 PM to 4/1/15 5:30 AM WisDOT Construction - Zoo Freeway | Burleigh St - Good Hope Rd | Ush 45 | MILWAUKEE
Entrance ramp from EB North Ave Medium All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Take North Ave East to HWY 100 to Greenfield to I-894/US45 South.
Entrance ramp from EB North Ave Medium All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM WisDOT Construction - Detour: Take North Ave East to HWY 100 to Greenfield to I-894/US45 South.
Watertown Plank Rd (-0.4 miles) to I-94 Major All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM WisDOT Construction - Detour: Take US45 SB to Watertown Plank to HWY 100 to Greenfield to I-894/US45 SB OR Take US45 SB to North to HWY 100 to Greenfield to I-894/US45 SB
Watertown Plank Rd (-0.4 miles) to Schlinger Ave (-0.1 miles) Major All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Take US45 SB to Watertown Plank to HWY 100 to Greenfield to I-894/US45 SB OR Take US45 SB to North to HWY 100 to Greenfield to I-894/US45 SB
Entrance ramp from Watertown Plank Rd Medium All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Continue South on HWY 100 to Greenfield to I-894/US45 South.
Entrance ramp from Watertown Plank Rd Medium All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Continue West to HWY 100 to Greenfield to I-894/US45 South.
Entrance ramp from EB Watertown Plank Rd Medium All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM WisDOT Construction - Detour: Continue South on HWY 100 to Greenfield to I-894/US45 South.
Entrance ramp from EB Watertown Plank Rd Medium All lanes and shoulders closed 3/31/15 10:00 PM to 4/1/15 5:00 AM WisDOT Construction - Detour: Continue West to HWY 100 to Greenfield to I-894/US45 South.
Exit ramp to SB 94th St Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Exit ramp to WB I-94 0.1 Major All lanes and shoulders closed 3/25/15 10:00 PM to 4/2/15 4:30 AM WisDOT Construction - Detour: Take US45 South to Watertown Plank to HWY 100 to the I-94 West Ramp. OR US45 South to Greenfield to HWY 100 to the I94 West Ramp.
Entrance ramp from WB I-94 0.3 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp

WI-16 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Brown St (-0.5 miles) to Sawyer Rd Major Left lane closed, two lanes open 3/16/15 12:00 AM to 6/26/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

WI-16 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Sawyer Rd (-0.2 miles) to Brown St (+0.5 miles) Major Left lane closed, two lanes open 3/16/15 12:00 AM to 6/26/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Apr 01 2015 04:33:22 CDT