I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/31/14 7:00 PM to 8/1/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
Cottage Grove Rd (-0.1 miles) to Milwaukee St (+0.1 miles) 139.5 to 138.3 Medium Right lane closed, two lanes open 7/31/14 8:00 PM to 8/1/14 5:30 AM WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Hoepker Rd 133.6 Medium Right lane closed, two lanes open 7/31/14 9:00 PM to 8/1/14 5:00 AM WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
WI-106 to Richardson Springs Rd 159.2 to 163.4 Medium Right lane closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - Detour: No posted detour

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Hodunk Rd (+0.8 miles) to Bowers Rd (+0.3 miles) 31.6 to 33.6 Major Left two lanes closed, up to one lanes open 7/15/14 5:00 AM to 8/31/14 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Miramar Rd to Stone School Rd 40.7 to 42.1 Medium Left lane closed, one lane open 7/9/14 5:00 AM to 8/15/14 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Stone School Rd to WI-83 42.3 to 43.8 Medium Left lane closed, one lane open 5/19/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Exit to EB Michigan St 311.1 Medium All lanes and shoulders closed 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
Exit to WB Michigan St 72.2 Medium All lanes and shoulders closed 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
Highland Rd to Falls Rd 87.0 to 91.1 Medium Right lane closed, one lane open 7/31/14 7:00 PM to 8/1/14 7:00 AM WisDOT Construction - N-S FREEWAY | 1500 FT S OF LEXINGTON BLVD - STH 32 | I 43 | OZAUKEE
Exit to EB Pioneer Rd 88.9 Medium All lanes and shoulders closed 7/31/14 7:00 PM to 8/1/14 7:00 AM WisDOT Construction - Detour: No Detour Required.
Entrance from WB Pioneer Rd 88.9 Minor Right lane closed, two lanes open 7/31/14 7:00 PM to 8/1/14 7:00 AM WisDOT Construction - Detour: No Detour Required.

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Dr (+0.1 miles) to County Road Ll 103.3 to 102.9 Medium Right lane closed, one lane open 7/7/14 12:00 AM to 8/8/14 11:45 PM WisDOT Construction - Detour: No posted detour
Exit to WB Becher St 312.2 Medium All lanes and shoulders closed 7/31/14 7:30 PM to 8/1/14 5:00 AM WisDOT Construction - Detour: Use alt route (Lapham exit or Holt exit)
Entrance from EB Becher St 312.2 Medium All lanes and shoulders closed 7/31/14 8:30 PM to 8/1/14 5:30 AM WisDOT Construction - Detour: Use alt route (Holt entrance ramp)
WI-83 to Stone School Rd 44.1 to 42.3 Medium Right lane closed, one lane open 5/19/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Entrance from SB WI-83 43.5 Major All lanes and shoulders closed 5/19/14 12:00 AM to 11/10/14 11:45 PM WisDOT Construction - Detour: STH 83 go west on CTH L. Continue on CTH L to STH 20. Go right/west on STH 20. To continue onto IH 43 SB go left/south onto the ramp.
Stone School Rd (-0.1 miles) to US-12 42.3 to 27.0 Medium Right lane closed, one or two lanes open 7/30/14 3:00 PM to 8/4/14 5:00 AM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Hoepker Rd 133.6 Medium Right lane closed, two lanes open 7/31/14 9:00 PM to 8/1/14 5:00 AM WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
WI-106 to Richardson Springs Rd 159.2 to 163.4 Medium Right lane closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - Detour: No posted detour

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/31/14 7:00 PM to 8/1/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
Cottage Grove Rd (-0.1 miles) to Milwaukee St (+0.1 miles) 139.5 to 138.3 Medium Right lane closed, two lanes open 7/31/14 8:00 PM to 8/1/14 5:30 AM WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Hoepker Rd 133.6 Medium Right lane closed, two lanes open 7/31/14 9:00 PM to 8/1/14 5:00 AM WisDOT Construction - MADISON - PORTAGE | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT Construction - Detour: Follow Signed Detour
Entrance from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Exit to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 7/28/14 12:00 AM to 8/5/14 5:30 AM WisDOT Construction - Detour: No signed detour
Entrance from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 7/28/14 12:00 AM to 8/5/14 5:30 AM WisDOT Construction - Detour: No signed detour
Exit to NWB US-41 307.6 Major All lanes and shoulders closed 7/27/14 9:00 PM to 8/5/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit to WB Becher St 312.2 Medium All lanes and shoulders closed 7/31/14 7:30 PM to 8/1/14 5:00 AM WisDOT Construction - Detour: Use alt route (Lapham exit or Holt exit)
Entrance from EB Becher St 312.2 Medium All lanes and shoulders closed 7/31/14 8:30 PM to 8/1/14 5:30 AM WisDOT Construction - Detour: Use alt route (Holt entrance ramp)
Exit to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Entrance from WB WI-20 333.7 Major All lanes and shoulders closed 5/15/14 12:00 AM to 8/6/14 11:45 PM WisDOT Construction - Detour: Use STH 20 - East Frontage Road - CTH K - I-94 WEST (NB)
7 Mile Rd (+1.0 miles) to 7 Mile Rd (+1.1 miles) 324.9 to 324.8 Medium Right lane closed, two lanes open 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement repair
Exit to EB Michigan St 311.1 Medium All lanes and shoulders closed 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
44th St (-0.2 miles) to 44th St 308.0 to 307.8 Medium Right lane closed, three lanes open 7/31/14 10:00 AM to 2:00 PM WisDOT Maintenance - Guard Rail repair
Exit to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit to SB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 8/14/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to Jackson ST 0.8 Medium All lanes and shoulders closed 1/4/14 12:00 AM to 11/30/14 11:45 PM WisDOT Construction - Detour: Jackson St. Entrance Ramp will reverse and become new Jackson/Van Buren exit ramp
Entrance from SB Broadway 1.1 Medium All lanes and shoulders closed 1/4/14 12:00 AM to 11/30/14 11:45 PM WisDOT Construction - Detour: Traffic Detours to new Milwaukee St. Reversed Ramp
Entrance from SWB Lincoln Memorial Dr 1.5 Medium All lanes and shoulders closed 11/4/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Michigan St. to Broadway to EB IH-794
Exit to NWB Carferry Dr 3.0 Medium All lanes and shoulders closed 7/7/14 12:00 AM to 9/5/14 11:45 PM WisDOT Construction - Detour: Detour Howard Ave. to 794 NB to Carferry NB exit ramp.

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive
Entrance from N Jackson St 13.8 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Detour on Clybourn St. to 2nd St. Ramp

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to WB Greenway Blvd Medium All lanes and shoulders closed 7/31/14 7:00 PM to 8/1/14 6:00 AM WisDOT Construction - Detour: No detour route will be posted
Whitney Way to Seminole Hwy Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
Todd Dr to I-39 Medium All lanes and shoulders open 7/1/14 7:00 AM to 11/15/14 11:59 PM Gateway Project website
Fish Hatchery Rd to Rimrock Rd Medium Left lane closed, two lanes open 7/31/14 7:00 PM to 8/1/14 6:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Fish Hatchery Rd to Rimrock Rd Major Left two lanes closed, one lane open 7/31/14 8:00 PM to 8/1/14 5:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Entrance from EB Park St Medium All lanes and shoulders closed 7/9/14 7:00 AM to 8/8/14 11:59 PM Gateway
Rimrock Rd to Agriculture Dr (+0.3 miles) Medium Left lane closed, two lanes open 7/31/14 7:00 PM to 8/1/14 6:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Rimrock Rd to Agriculture Dr (+0.3 miles) Major Left two lanes closed, one lane open 7/31/14 9:30 PM to 8/1/14 5:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-39 to Todd Dr Medium Various lanes closed 7/1/14 7:00 AM to 11/15/14 11:59 PM Gateway Project website
I-39 (+0.3 miles) to Monona Dr (+0.2 miles) Medium Left lane closed, two or three lanes open 7/31/14 7:00 PM to 8/1/14 6:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
I-39 (+0.3 miles) to Monona Dr (+0.2 miles) Major Left two lanes closed, one or two lanes open 7/31/14 9:30 PM to 8/1/14 5:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Monona Dr (+0.7 miles) to Fish Hatchery Rd Medium Left lane closed, two lanes open 7/31/14 7:00 PM to 8/1/14 6:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Monona Dr (+0.7 miles) to Fish Hatchery Rd Major Left two lanes closed, one lane open 7/31/14 9:30 PM to 8/1/14 5:00 AM daily until 8/2/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Seminole Hwy to Whitney Way Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
at Gammon Rd (-0.1 miles) Medium Right lane closed, one lane open 6/30/14 12:00 AM to 8/6/14 11:45 PM WisDOT Construction - S MADISON BELTLINE | RAYMOND ROAD TO SEMINOLE HIGHWAY PHASE 1 | USH 18 | DANE
Mineral Point Rd to Terrace Ave Medium Left lane closed, one lane open 7/23/14 7:00 PM to 11/14/14 11:59 PM WisDOT Construction - SAUK CITY - MADISON | OLD SAUK RD - MINERAL POINT RD | USH 12 | DANE
Exit to EB Greenway Blvd Medium All lanes and shoulders closed 7/31/14 7:00 PM to 8/1/14 6:00 AM WisDOT Construction - Detour: No detour route will be posted

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Entrance from WB WI-20 333.7 Major All lanes and shoulders closed 5/15/14 12:00 AM to 8/6/14 11:45 PM WisDOT Construction - Detour: Use STH 20 - East Frontage Road - CTH K - I-94 WEST (NB)
7 Mile Rd (+1.0 miles) to 7 Mile Rd (+1.1 miles) 324.9 to 324.8 Medium Right lane closed, two lanes open 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement repair
Exit to EB Michigan St 311.1 Medium All lanes and shoulders closed 7/31/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt. Route
44th St (-0.2 miles) to 44th St 308.0 to 307.8 Medium Right lane closed, three lanes open 7/31/14 10:00 AM to 2:00 PM WisDOT Maintenance - Guard Rail repair
US-18 (-0.1 miles) to State St (+0.1 miles) Major Left lane closed, two lanes open 7/26/14 12:00 AM to 10/20/14 11:45 PM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
Congress St to 91st St Major Left two lanes closed, one lane open 7/1/14 12:00 AM to 8/22/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
91st St to Mill Rd Major Left two lanes closed, one lane open 5/18/14 12:00 AM to 8/8/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
WI-145 to WI-145 Medium Right lane closed, two lanes open 8/1/14 12:00 AM to 6:00 AM WisDOT Construction - EPOXY PAVEMENT MARKING - 2014 | VARIES HIGHWAYS | SOUTHEAST REGION WIDE
Exit to NEB WI-144 Major All lanes and shoulders closed 7/21/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 North to WIS 60 West to WIS 144 N
Entrance from SWB WI-144 Major All lanes and shoulders closed 4/25/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 east to US 41

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-K (+0.2 miles) to Cedar Creek Rd Medium Right lane closed, one lane open 7/31/14 9:00 AM to 8:00 PM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
Exit to SWB WI-144 Major All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 South to WIS 60 West to WIS 144 north
Entrance from WI-144 Medium All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 East to US 41 south
WI-145 to WI-145 (+0.1 miles) Medium Right lane closed, one lane open 8/1/14 12:00 AM to 6:00 AM WisDOT Construction - EPOXY PAVEMENT MARKING - 2014 | VARIES HIGHWAYS | SOUTHEAST REGION WIDE
Good Hope Rd to Mill Rd Major Left two lanes closed, up to one lanes open 7/31/14 10:00 PM to 8/1/14 5:00 AM WisDOT Maintenance - Pavement Repair
US-45 to 91st St Major All lanes and shoulders closed 5/18/14 12:00 AM to 8/8/14 11:45 PM WisDOT Construction - Detour: Stage 2 - Traffic Pattern. SB USH 41 traffic will enter northern median crossover and be diverted into Lane 1 of the NB USH 41 side. SB traffic will then be diverted back on the SB side near 91st street.
91st St to Congress St Major Left two lanes closed, one lane open 7/1/14 12:00 AM to 8/22/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
Highland Blvd to Miller Park Way Major Left lane closed, two lanes open 7/25/14 12:00 AM to 10/20/14 11:45 PM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
Entrance from WB Wisconsin Ave Medium All lanes and shoulders closed 2/24/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Advanced FMS signs stating to use alternate route to SB 41 at Hawley Rd, 35th St, and 46th ST.
Exit to WB Becher St 312.2 Medium All lanes and shoulders closed 7/31/14 7:30 PM to 8/1/14 5:00 AM WisDOT Construction - Detour: Use alt route (Lapham exit or Holt exit)
Entrance from EB Becher St 312.2 Medium All lanes and shoulders closed 7/31/14 8:30 PM to 8/1/14 5:30 AM WisDOT Construction - Detour: Use alt route (Holt entrance ramp)
Exit to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit to EB Watertown Plank Rd Medium All lanes and shoulders closed 1/5/14 12:00 AM to 10/1/14 11:45 PM WisDOT Construction - Detour: Exit Wisconsin Ave. EAST WATERTOWN PLANK ROAD: East on Wisconsin Ave to Glenview Ave. North on Glenview Ave. to Watertown Plank Rd. West WATERTOWN PLANK ROAD: Exit Wisconsin Ave. West to HWY 100, North of HWY 100 to Watertown P
Hampton Ave (-0.2 miles) to Hampton Ave (+0.3 miles) Medium Right lane closed, two lanes open 8/1/14 9:00 AM to 2:00 PM WisDOT Maintenance - Bridge repair
Entrance from W Hampton Ave Major All lanes and shoulders closed 8/1/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use Alt Route
WI-145 to WI-145 Medium Right lane closed, two lanes open 8/1/14 12:00 AM to 6:00 AM WisDOT Construction - EPOXY PAVEMENT MARKING - 2014 | VARIES HIGHWAYS | SOUTHEAST REGION WIDE

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-145 to WI-145 (+0.1 miles) Medium Right lane closed, one lane open 8/1/14 12:00 AM to 6:00 AM WisDOT Construction - EPOXY PAVEMENT MARKING - 2014 | VARIES HIGHWAYS | SOUTHEAST REGION WIDE
Good Hope Rd to Mill Rd Major Left two lanes closed, up to one lanes open 7/31/14 10:00 PM to 8/1/14 5:00 AM WisDOT Maintenance - Pavement Repair
Exit to Watertown Plank Medium Left two lanes closed, one lane open 1/5/14 9:30 PM to 10/1/14 11:45 PM WisDOT Construction - Detour: West on Watertown Plank Road to Swan. North on Swan Blvd to Discovery. South on Discover Parkway to Watertown Plank Road.
Entrance from Watertown Plank Rd Medium All lanes and shoulders closed 1/5/14 12:00 AM to 11/14/14 11:45 PM WisDOT Construction - Detour: South on Hwy 100 to Bluemound Rd. East on Bluemound Rd to 97 th St. North on 97th St to USH 45. Or North on Hwy 100 to North Ave. West on North Ave to USH 45

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Jul 31 12:33:08 CDT 2014