Construction Report
Select Location
  
Updated: 6/27/16 6:06 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-81 (+0.2 miles) to Hart Rd (+0.1 miles) 184.8 to 183.6 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 6/29/16 WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
WI-81 (+0.5 miles) to Hart Rd (+0.1 miles) 184.6 to 183.6 Minor Right shoulder closed, all lanes open 6/26/16 12:00 AM to 7/2/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
at WI-11 177.6 Minor Left shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.6 Minor Right shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at County Road M (-0.2 miles) 166.8 Minor Right shoulder closed, all lanes open 6/27/16 8:00 AM to 5:00 PM daily until 7/1/16 WisDOT Construction - Soil borings for Design ID 1005-10-01 for I-39 Central Segment.
Ellendale Rd (-0.5 miles) to Goede Rd (+0.3 miles) 164.0 to 162.2 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
WI-106 (+0.5 miles) to Maple Grove Rd (-0.9 miles) 158.7 to 157.7 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: No posted detour
WI-106 (+0.5 miles) to Church Rd (+0.2 miles) 158.7 to 153.8 Medium Left lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 9:00 AM daily until 6/30/16 WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Maple Grove Rd to Church Rd 156.8 to 154.0 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: North on northbound IH39 to exit 147 (CTY N)
Entrance ramp from SB US-51 156.4 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: South on I39 southbound to exit 160 (STH73)
Drotning Rd (-0.3 miles) to County Road MN (-0.3 miles) 150.7 to 145.7 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Williams Dr Bridge B-13-0721 | I 39 | DANE
River Rd (+0.1 miles) to County Road O (-0.4 miles) 88.2 to 88.8 Medium Right lane closed, one lane open 6/27/16 5:00 AM to 6/29/16 2:00 PM WisDOT Maintenance - concrete repair

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road MN (+0.4 miles) to Drotning Rd (+0.3 miles) 145.3 to 150.3 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Williams Dr Bridge B-13-0721 | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Minor Right shoulder closed, all lanes open 6/1/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Medium Left lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 9:00 AM daily until 6/30/16 WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd to Maple Grove Rd 153.5 to 156.3 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Maple Grove Rd (+0.9 miles) to Goede Rd (-0.2 miles) 157.2 to 161.7 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: No posted detour
Goede Rd (-0.2 miles) to Ellendale Rd (+0.5 miles) 161.7 to 163.5 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
at County Road M (+0.2 miles) 166.3 Minor Right shoulder closed, all lanes open 6/27/16 8:00 AM to 5:00 PM daily until 7/1/16 WisDOT Construction - Soil borings for Design ID 1005-10-01 for I-39 Central Segment. Proposed bridge widening over WSOR.
Kennedy Rd (-0.3 miles) to Milwaukee St 169.4 to 172.8 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
at WI-11 177.1 Minor Left shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.1 Minor Right shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
L-T Town Line Rd (+0.5 miles) to CR-S (-0.2 miles) 181.1 to 182.1 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | SB Turtle Creek Bridge B-53-0042 | I 39 | ROCK
CR-S (+0.2 miles) to WI-81 (-0.5 miles) 182.5 to 184.1 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
Hart Rd (-0.1 miles) to WI-81 (-0.5 miles) 183.1 to 184.1 Minor Right shoulder closed, all lanes open 6/26/16 12:00 AM to 7/2/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK

I-41/US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at WI-20 333.1 Minor Right shoulder closed, all lanes open 6/6/16 7:00 AM to 7/1/16 5:00 PM WisDOT Construction - I94 EFR Turn Lane Improvements
Exit ramp to Wisconsin Ave 317.7 Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
US-45 to Beloit Rd (-0.1 miles) 4.4 to 3.7 Minor Left lane closed, one or two lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
Cleveland Ave (+0.1 miles) to WI-59 (+0.2 miles) 2.4 to 0.9 Medium Right lane closed, two lanes open 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from NEB National Ave 2.2 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: To go North: Take National Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/894/US 45 North Entrance Ramp; To go East: Take National Ave West to Hwy 100, Hwy 100 North to the I-94 East E
Entrance ramp from WB Lincoln Ave 1.8 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: To go North: Take Lincoln Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp; To go East: Take Lincoln Ave West to Hwy 100, Hwy 100 North to the I-94 East Entranc
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Entrance ramp from WB WI-59 0.8 Major All lanes and shoulders closed 4/16/16 12:00 AM to 7/29/16 11:45 PM WisDOT Construction - Detour: Ramps also closed) To go North: Take Greenfield Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp To go East: Take Greenfield Ave East to Hawley Rd, Hawley Rd No
WI-145 to WI-145 Medium Various lanes closed 3/14/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
County Line Rd (-0.1 miles) to WI-145 Medium Various lanes closed 8/17/15 7:00 AM to 11/30/16 11:59 PM WisDOT Bridge reconstruction and widening of ramps, Resurfacing; Replacement of signals at interchanges
County Line Rd to Western Ave (-0.3 miles) Minor Left shoulder closed, all lanes open 3/14/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
Freistadt Rd to US-45 (+0.1 miles) Major Right two lanes closed, up to one lanes open 6/27/16 8:30 PM to 6/28/16 6:00 AM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
Exit ramp to EB WI-167 Major All lanes closed 6/27/16 8:30 PM to 6/28/16 6:00 AM WisDOT Construction - Detour: Continue north to STH 145, return to USH 45 NB. TRUCKS: Continue north to STH 60.
Entrance ramp from WB WI-167 Unknown All lanes closed 6/27/16 8:30 PM to 6/28/16 6:00 AM WisDOT Construction - Detour: Use IH 41 SB to Lannon Rd and return north.

I-41/US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Western Ave (+0.2 miles) to County Line Rd Minor Left shoulder closed, all lanes open 3/14/16 12:00 AM to 7/15/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
WI-167 to Maple Rd Medium Left lane closed, two lanes open 6/27/16 9:30 AM to 6:00 PM daily until 6/30/16 WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
County Line Rd to WI-145 Medium Various lanes closed 3/14/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
Burleigh St to Meinecke Ave Major Left two lanes closed, one lane open 6/27/16 9:30 PM to 6/28/16 5:30 AM WisDOT Construction - Zoo IC, Center St Bridge | over USH 45 B-40-0880 | USH 45 | MILWAUKEE
Entrance ramp from EB Burleigh St Medium All lanes closed 6/27/16 9:30 PM to 6/28/16 5:30 AM WisDOT Construction - Detour: Continue east on Burleigh St to Mayfair Rd. Turn right onto Mayfair Rd and continue south the North Ave. Turn right onto North Ave and continue to USH 45.
Entrance ramp from EB Burleigh St Medium All lanes closed and both shoulders open 6/9/16 12:00 AM to 10/15/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Center St (-0.1 miles) to Meinecke Ave Minor Left shoulder closed, all lanes open 3/10/16 12:00 AM to 8/27/16 11:45 PM WisDOT Construction - Zoo IC, Center St Bridge | over USH 45 B-40-0880 | USH 45 | MILWAUKEE
Exit ramp to Wisconsin Ave Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Exit ramp to EB I-94 Minor Various lanes closed 7/20/15 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Entrance ramp from WB Wisconsin Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Entrance ramp from WB I-94 0.3 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Exit ramp to WB Lincoln Ave 1.8 Medium All lanes closed and both shoulders open 6/27/16 9:00 AM to 2:00 PM daily until 6/28/16 WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance from NB I-43 (Rock Fwy) 58.9 to 4.7 Minor Left lane closed, up to one lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
Entrance from NB I-43 4.7 to 5.0 Medium Various lanes closed 10/9/15 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Stillwater - Somerset | Cth E - 150th Ave, B-55-0226, C-55-0035 | Sth 64 | ST. CROIX
Exit ramp to WB WI-100 322.4 Major All lanes closed and both shoulders open 6/27/16 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement Repairs
at 38th St 341.5 Minor Right shoulder closed, all lanes open 6/17/16 12:00 AM to 10/8/16 11:45 PM WisDOT Construction - Detour: 38th Street To be Closed. Route to proceed along west frontage to Wis. 142 to CTH UE to CTH N

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB CR-NN 26.6 Medium All lanes and shoulders closed 2/6/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Offramp from EB US12 C-D to CTH NN will be closed for reconstruction. Detour: EB US12 traffic intending to exit at CTH NN will be directed to exit US12 at I43 SB ramp. Traffic will head SB on I43 until STH 67 interchange where traff
Exit ramp to CR-NN 26.6 Medium All lanes and shoulders closed 2/16/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Onramp from CTH NN to EB US12 C-D will be closed for reconstruction. Detour: Traffic intending to exit CTH NN onto US12 EB C-D will be directed west on NN until STH 67 intersection. Traffic will head south on 67 until 67/I43 interch
Entrance ramp from WB US-12 27.1 Medium All lanes and shoulders closed 2/6/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Onramp from County NN to USH 12 C-D will be closed for reconstruction. Detour: Traffic intending to enter 12 (NB & SB) from NN will be directed west on NN to STH 67 intersection. On 67 head south until I43 interchange. Traffic can h
Entrance ramp from WB US-12 27.1 Medium All lanes and shoulders closed 2/16/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Offramp from US12 WB C-D to County NN will be closed for reconstruction. Detour: Traffic heading WB on US12 intending to exit at CTH NN will be directed to exit US12 C-D at I43 SB. Traffic will head south on 43 until STH 67 intercha
116th St to US-45 (+0.1 miles) 58.9 to 4.7 Minor Left lane closed, up to one lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
US-45 (+0.1 miles) to 92nd St (-0.2 miles) 4.7 to 5.0 Medium Various lanes closed 10/9/15 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Stillwater - Somerset | Cth E - 150th Ave, B-55-0226, C-55-0035 | Sth 64 | ST. CROIX
Exit to WB I-94 310.9 to 306.7 Medium One lane closed, up to two lanes open 6/27/16 8:00 PM to 6/28/16 5:00 AM WisDOT Construction - Special Pavement Marking - 2016 | Roadways within SE Region | Var Hwy | SOUTHEAST REGION WIDE

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB I-41 9.5 Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Entrance ramp from WB US-12 27.0 Medium All lanes and shoulders closed 2/6/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Onramp from County NN to USH 12 C-D will be closed for reconstruction. Detour: Traffic intending to enter 12 (NB & SB) from NN will be directed west on NN to STH 67 intersection. On 67 head south until I43 interchange. Traffic can h
Entrance ramp from WB US-12 27.0 Medium All lanes and shoulders closed 2/16/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Offramp from US12 WB C-D to County NN will be closed for reconstruction. Detour: Traffic heading WB on US12 intending to exit at CTH NN will be directed to exit US12 C-D at I43 SB. Traffic will head south on 43 until STH 67 intercha
Exit ramp to EB CR-NN 26.9 Medium All lanes and shoulders closed 2/6/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Offramp from EB US12 C-D to CTH NN will be closed for reconstruction. Detour: EB US12 traffic intending to exit at CTH NN will be directed to exit US12 at I43 SB ramp. Traffic will head SB on I43 until STH 67 interchange where traff
Exit ramp to CR-NN 26.9 Medium All lanes and shoulders closed 2/16/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - Detour: Onramp from CTH NN to EB US12 C-D will be closed for reconstruction. Detour: Traffic intending to exit CTH NN onto US12 EB C-D will be directed west on NN until STH 67 intersection. Traffic will head south on 67 until 67/I43 interch
County Road O (+0.1 miles) to CR-X 18.5 to 17.4 Medium Right lane closed, one lane open 6/23/16 5:00 AM to 8/29/16 10:00 PM WisDOT Construction - Rock Freeway | sb Elm Ridge Bridge B-64-123 | I 43 | WALWORTH
at Elm Ridge Rd 17.8 Medium Various lanes closed 3/28/16 7:00 AM to 11/1/16 11:59 PM WisDOT The project will reconstruct the southbound bridge deck over Elm Ridge Road. From County X to Elm Ridge Road, the southbound travel lanes will be milled and overlaid and shoulders will be reconstructed. Safety improvements include new barrier wall, beam guard and crash cushions. Updates to the drainage system will also take place.

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lakeshore Dr (-1.2 miles) to Lakeshore Dr (-0.7 miles) 0.0 to 0.5 Medium Right lane closed, one lane open 4/8/16 7:00 AM to 11/15/16 10:00 PM WisDOT Construction - I-90 Mississippi River Bridge Construction
Lakeshore Dr (-1.2 miles) to US-53 (-0.2 miles) 0.0 to 2.7 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Exit ramp to NB WI-35 2.9 Major All lanes and shoulders closed 4/4/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - Detour: EB 90 to Exit 4 USH 53/STH 157 to WB 90 to STH 35 NB @ Exit 3
US-53 to 12th Ave (+0.2 miles) 2.9 to 4.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
12th Ave (+0.2 miles) to US-53 (+0.2 miles) 4.2 to 4.6 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 (+0.2 miles) to WI-16 4.6 to 5.7 Medium Right lane closed, one or two lanes open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Commercial St (+0.6 miles) to WI-16 (+0.7 miles) 20.3 to 28.8 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
Hazel Ave (-0.3 miles) to US-12 34.9 to 43.2 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
County Road MN (+0.4 miles) to Drotning Rd (+0.3 miles) 145.3 to 150.3 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Williams Dr Bridge B-13-0721 | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Minor Right shoulder closed, all lanes open 6/1/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd (-0.3 miles) to WI-106 (-0.4 miles) 153.2 to 158.3 Medium Left lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 9:00 AM daily until 6/30/16 WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Church Rd to Maple Grove Rd 153.5 to 156.3 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Maple Grove Rd (+0.9 miles) to Goede Rd (-0.2 miles) 157.2 to 161.7 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: No posted detour
Goede Rd (-0.2 miles) to Ellendale Rd (+0.5 miles) 161.7 to 163.5 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
at County Road M (+0.2 miles) 166.3 Minor Right shoulder closed, all lanes open 6/27/16 8:00 AM to 5:00 PM daily until 7/1/16 WisDOT Construction - Soil borings for Design ID 1005-10-01 for I-39 Central Segment. Proposed bridge widening over WSOR.
Kennedy Rd (-0.3 miles) to Milwaukee St 169.4 to 172.8 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | CTH O - Kennedy Rd | I 39 | ROCK
at WI-11 177.1 Minor Left shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.1 Minor Right shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
L-T Town Line Rd (+0.5 miles) to CR-S (-0.2 miles) 181.1 to 182.1 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | SB Turtle Creek Bridge B-53-0042 | I 39 | ROCK
CR-S (+0.2 miles) to WI-81 (-0.5 miles) 182.5 to 184.1 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
Hart Rd (-0.1 miles) to WI-81 (-0.5 miles) 183.1 to 184.1 Minor Right shoulder closed, all lanes open 6/26/16 12:00 AM to 7/2/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-81 (+0.2 miles) to Hart Rd (+0.1 miles) 184.8 to 183.6 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 6/29/16 WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
WI-81 (+0.5 miles) to Hart Rd (+0.1 miles) 184.6 to 183.6 Minor Right shoulder closed, all lanes open 6/26/16 12:00 AM to 7/2/16 11:00 PM WisDOT Construction - Illinois State Line - Madison | Hart Road Bridge B-53-0312 | I 39 | ROCK
at WI-11 177.6 Minor Left shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at WI-11 177.6 Minor Right shoulder closed, all lanes open 6/27/16 6:00 AM to 6/28/16 6:00 AM daily until 11/18/16 WisDOT Construction - Illinois State Line - Madison | STH 11, Avalon Rd Interchange | I 39 | ROCK
at County Road M (-0.2 miles) 166.8 Minor Right shoulder closed, all lanes open 6/27/16 8:00 AM to 5:00 PM daily until 7/1/16 WisDOT Construction - Soil borings for Design ID 1005-10-01 for I-39 Central Segment.
Ellendale Rd (-0.5 miles) to Goede Rd (+0.3 miles) 164.0 to 162.2 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - IL State Line - Madison | Rock River Bridges B-53-0357/0358 | I 39 | ROCK
WI-106 (+0.5 miles) to Maple Grove Rd (-0.9 miles) 158.7 to 157.7 Medium Left lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: No posted detour
WI-106 (+0.5 miles) to Church Rd (+0.2 miles) 158.7 to 153.8 Medium Left lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 9:00 AM daily until 6/30/16 WisDOT Construction - Illinois State Line - Madison | Maple Grove Rd - E Church Rd | I 39 | DANE
Maple Grove Rd to Church Rd 156.8 to 154.0 Medium Various lanes closed 4/4/16 8:00 PM to 10/30/16 5:00 AM WisDOT Periodic Nighttime Single lane closures
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: North on northbound IH39 to exit 147 (CTY N)
Entrance ramp from SB US-51 156.4 Major All lanes and shoulders closed 4/18/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Detour: South on I39 southbound to exit 160 (STH73)
Drotning Rd (-0.3 miles) to County Road MN (-0.3 miles) 150.7 to 145.7 Medium Right lane closed, one lane open 6/27/16 8:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Illinois State Line - Madison | Williams Dr Bridge B-13-0721 | I 39 | DANE
US-12 to Hazel Ave (+0.4 miles) 43.2 to 34.8 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
WI-16 (-0.7 miles) to Commercial St (-0.6 miles) 28.8 to 20.3 Medium One lane closed, one lane open 6/27/16 4:00 AM to 7/1/16 12:00 PM WisDOT Construction - La Crosse - Tomah | W County Line - USH 12 | I 90 | MONROE
WI-16 (-1.0 miles) to WI-16 6.7 to 5.8 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
WI-16 to US-53 (-0.1 miles) 5.8 to 4.5 Medium Right lane closed, one or two lanes open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 (-0.1 miles) to 12th Ave (-0.2 miles) 4.5 to 4.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
12th Ave (-0.2 miles) to Oak Ave (+0.1 miles) 4.2 to 3.2 Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
US-53 to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 3/25/16 12:00 AM to 11/18/16 11:45 PM WisDOT Construction - USH 53/35 - Theater Rd | Black River Bridge - Theater Rd EB Rdwy | I 90 | LA CROSSE
Lakeshore Dr (+0.8 miles) to Lakeshore Dr (+1.2 miles) Medium Right lane closed, one lane open 6/27/16 7:00 PM to 10:00 PM daily until 11/15/16 WisDOT Construction - I-90 Mississippi River Bridge Crossing

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Left shoulder closed, all lanes open 6/27/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Minor Right shoulder closed, all lanes open 6/27/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.1 miles) 16.5 to 16.8 Medium Various lanes closed 6/27/16 6:00 PM to 6/28/16 7:00 AM daily until 7/1/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
WI-93 (+0.2 miles) to Hobbs Rd 69.0 to 71.5 Medium One lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 9:00 AM,
7/3/16 8:00 PM to 7/4/16 9:00 AM,
7/10/16 8:00 PM to 7/11/16 9:00 AM
WisDOT Construction - Detour: No posted detour. Follow Alternate 94.
WI-93 (+0.2 miles) to Hobbs Rd 69.0 to 71.5 Medium One lane closed, one lane open 6/27/16 6:00 PM to 6/29/16 11:00 AM,
7/4/16 6:00 PM to 7/6/16 11:00 AM,
7/11/16 6:00 PM to 7/13/16 11:00 AM
WisDOT Construction - Detour: No posted detour. Follow alternate 94.
County Road O (-0.2 miles) to County Road O (+4.1 miles) 127.8 to 132.0 Medium One lane closed, one lane open 6/26/16 7:00 PM to 6/27/16 11:00 AM,
7/3/16 7:00 PM to 7/4/16 11:00 AM,
7/10/16 7:00 PM to 7/11/16 11:00 AM,
7/17/16 7:00 PM to 7/18/16 11:00 AM,
... more, ending on 8/29/16
WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line EB | I 94 | JACKSON
County Road O (-0.2 miles) to County Road O (+4.1 miles) 127.8 to 132.0 Medium One lane closed, one lane open 6/27/16 5:00 PM to 6/30/16 12:00 PM,
7/4/16 5:00 PM to 7/7/16 12:00 PM,
7/11/16 5:00 PM to 7/14/16 12:00 PM,
7/18/16 5:00 PM to 7/21/16 12:00 PM,
... more, ending on 8/31/16
WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line EB | I 94 | JACKSON
County Road O (+4.1 miles) to Cortland Ave (+0.1 miles) 132.0 to 137.5 Medium One lane closed, one lane open 6/26/16 7:00 PM to 6/27/16 11:00 AM,
7/3/16 7:00 PM to 7/4/16 11:00 AM,
7/10/16 7:00 PM to 7/11/16 11:00 AM,
7/17/16 7:00 PM to 7/18/16 11:00 AM,
... more, ending on 8/29/16
WisDOT Construction - 1023-06-73 (NW Office)
County Road O (+4.1 miles) to Cortland Ave (+0.1 miles) 132.0 to 137.5 Medium One lane closed, one lane open 6/27/16 5:00 PM to 6/30/16 12:00 PM,
7/4/16 5:00 PM to 7/7/16 12:00 PM,
7/11/16 5:00 PM to 7/14/16 12:00 PM,
7/18/16 5:00 PM to 7/21/16 12:00 PM,
... more, ending on 8/31/16
WisDOT Construction - 1023-06-73 (NW Office)
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 278.7 to 279.3 Medium Various lanes closed 4/13/16 12:00 AM to 11/24/16 11:45 PM WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Dousman Rd (-0.3 miles) to Dousman Rd (+0.2 miles) 280.7 to 281.3 Medium Various lanes closed 6/27/16 12:00 AM to 11:45 PM daily until 11/25/16 WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Dousman Rd (+0.2 miles) to WI-67 (+0.2 miles) 281.3 to 281.7 Minor Left shoulder closed, all lanes open 5/28/15 12:00 AM to 8/31/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
Dousman Rd (+0.2 miles) to WI-67 (+0.2 miles) 281.3 to 281.7 Minor Right shoulder closed, all lanes open 5/28/15 12:00 AM to 8/31/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
Dousman Rd (+0.2 miles) to WI-67 (+0.2 miles) 281.3 to 281.7 Medium Right lane closed, one lane open 6/28/16 12:00 AM to 5:30 AM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
Dousman Rd (+0.2 miles) to WI-67 (+0.2 miles) 281.3 to 281.7 Medium Left lane closed, one lane open 6/27/16 7:00 PM to 6/28/16 12:00 AM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
Entrance ramp from SB WI-67 281.7 Major All lanes closed 6/27/16 7:00 PM to 6/28/16 5:30 AM WisDOT Construction - Detour: SB traffic on STH 67 will be directed to continue on STH 67 to CTH DR, then east on CTH DR to CTH P where traffic can get on EB 94
CR-P (-0.2 miles) to Cushing Park Rd (+0.2 miles) 282.9 to 284.8 Medium Left lane closed, one lane open 6/27/16 7:00 PM to 6/28/16 6:00 AM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
CR-P (+0.2 miles) to Cushing Park Rd (+0.2 miles) 283.3 to 284.8 Medium Various lanes closed 3/10/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-83 to Maple Ave 286.6 to 287.9 Medium Various lanes closed 3/30/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Moorland Rd (-0.3 miles) to I-41 (+0.1 miles) 300.3 to 304.5 Major All lanes closed 6/27/16 11:00 PM to 6/28/16 3:00 AM WisDOT Construction - Detour: To go East: Take I-94 East to the Moorland Rd Exit; take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hawley Rd, Hawley Rd North the I-94 East Entrance Ramp; To go South: Take I-94 East to the Moorland Rd Exit; take
Entrance ramp from NB Moorland Rd 301.1 Medium All lanes closed 6/27/16 11:00 PM to 6/28/16 3:00 AM WisDOT Construction - Detour: To go East: Take Moorland Rd South to Greenfield Ave, Greenfield Ave East to Hawley Rd, Hawley Rd North the I-94 East Entrance Ramp; To go South: Take Moorland Rd South to Greenfield Ave, Greenfield Ave East to the I-41/894/US 45 S
Sunny Slope Rd (-0.1 miles) to WI-100 (-0.2 miles) 301.6 to 303.5 Medium Right lane closed, two lanes open 3/12/16 12:00 AM to 9/5/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from SB WI-100 303.7 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 8/31/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Entrance ramp from SB I-41 304.7 Minor Various lanes closed 7/20/15 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St to 13th St 306.3 to 310.0 Medium One lane closed, two or three lanes open 6/27/16 8:00 PM to 6/28/16 5:00 AM WisDOT Construction - Special Pavement Marking - 2016 | Roadways within SE Region | Var Hwy | SOUTHEAST REGION WIDE
Exit ramp to WB WI-100 322.4 Major All lanes closed and both shoulders open 6/27/16 9:00 AM to 2:00 PM WisDOT Maintenance - Pavement Repairs
at 38th St 341.5 Minor Right shoulder closed, all lanes open 6/17/16 12:00 AM to 10/8/16 11:45 PM WisDOT Construction - Detour: 38th Street To be Closed. Route to proceed along west frontage to Wis. 142 to CTH UE to CTH N

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at WI-20 333.1 Minor Right shoulder closed, all lanes open 6/6/16 7:00 AM to 7/1/16 5:00 PM WisDOT Construction - I94 EFR Turn Lane Improvements
Exit ramp to Wisconsin Ave 317.7 Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Canal St to 68th St 310.9 to 306.7 Medium One lane closed, up to two lanes open 6/27/16 8:00 PM to 6/28/16 5:00 AM WisDOT Construction - Special Pavement Marking - 2016 | Roadways within SE Region | Var Hwy | SOUTHEAST REGION WIDE
Exit ramp to EB I-894 305.0 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Entrance ramp from SB WI-100 303.8 Minor Right lane closed, up to two lanes open 3/25/15 12:00 AM to 8/31/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Maple Ave to WI-83 (+0.3 miles) 288.3 to 286.8 None All lanes open with restriction 5/3/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
Genesee St (+0.1 miles) to CR-P (-0.2 miles) 285.4 to 283.7 None All lanes open with restriction 5/3/16 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - East West Freeway | CTH P - CTH F | I 94 | WAUKESHA
WI-67 (-0.2 miles) to WI-67 (+0.2 miles) 282.1 to 281.7 Minor Right shoulder closed, all lanes open 5/28/15 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
WI-67 (-0.2 miles) to WI-67 (+0.2 miles) 282.1 to 281.7 Minor Left shoulder closed, all lanes open 5/28/15 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - East-West Freeway | Sth 67 Nb & Sb Bridge | I 94 | WAUKESHA
WI-67 (+0.2 miles) to Dousman Rd (+0.3 miles) 281.7 to 281.1 Medium Various lanes closed 6/27/16 12:00 AM to 6/28/16 12:00 AM daily until 11/24/16 WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Golden Lake Rd (-0.3 miles) to Golden Lake Rd (+0.3 miles) 279.7 to 279.1 Medium Various lanes closed 6/27/16 12:00 AM to 6/28/16 12:00 AM daily until 11/24/16 WisDOT Construction - East West Freeway | Dousman Road Bridges B-67-79, 80 | I 94 | WAUKESHA
Cortland Ave (-0.1 miles) to Aspen Ave (+1.7 miles) 137.7 to 132.2 Medium One lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 1:00 PM,
7/3/16 8:00 PM to 7/4/16 1:00 PM,
7/10/16 8:00 PM to 7/11/16 1:00 PM,
7/17/16 8:00 PM to 7/18/16 1:00 PM,
... more, ending on 8/29/16
WisDOT Construction - 1023-06-75 (NW Project ID)
Cortland Ave (-0.1 miles) to Aspen Ave (+1.7 miles) 137.7 to 132.2 Medium One lane closed, one lane open 6/27/16 5:00 PM to 6/30/16 11:00 AM,
7/4/16 5:00 PM to 7/7/16 11:00 AM,
7/11/16 5:00 PM to 7/14/16 11:00 AM,
7/18/16 5:00 PM to 7/21/16 11:00 AM,
... more, ending on 8/31/16
WisDOT Construction - 1023-06-75 (NW Project ID)
Aspen Ave (+1.7 miles) to County Road O (+0.2 miles) 132.2 to 127.9 Medium One lane closed, one lane open 6/26/16 8:00 PM to 6/27/16 1:00 PM,
7/3/16 8:00 PM to 7/4/16 1:00 PM,
7/10/16 8:00 PM to 7/11/16 1:00 PM,
7/17/16 8:00 PM to 7/18/16 1:00 PM,
... more, ending on 8/29/16
WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line WB | I 94 | JACKSON
Aspen Ave (+1.7 miles) to County Road O (+0.2 miles) 132.2 to 127.9 Medium One lane closed, one lane open 6/27/16 5:00 PM to 6/30/16 11:00 AM,
7/4/16 5:00 PM to 7/7/16 11:00 AM,
7/11/16 5:00 PM to 7/14/16 11:00 AM,
7/18/16 5:00 PM to 7/21/16 11:00 AM,
... more, ending on 8/31/16
WisDOT Construction - Black River Falls - Tomah | CTH O - S County Line WB | I 94 | JACKSON
Hobbs Rd to US-53 (+0.7 miles) 71.6 to 69.9 Medium One lane closed, one lane open 6/26/16 10:00 PM to 6/27/16 11:00 AM WisDOT Construction - Detour: No posted detour. Permanent Alternate 94 routes are set up if needed.
Hobbs Rd to US-53 (+0.7 miles) 71.6 to 69.9 Medium One lane closed, one lane open 6/27/16 6:00 PM to 6/29/16 1:00 PM WisDOT Construction - Detour: No posted detour.
Entrance ramp from NB US-53 70.4 Major All lanes and shoulders closed 6/1/16 12:00 AM to 7/23/16 11:45 PM WisDOT Construction - Detour: Signed detour putting traffic on USH 53 NB to Golf Road to USH 53 SB to IH 94 WB.
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Left shoulder closed, all lanes open 6/27/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Minor Right shoulder closed, all lanes open 6/27/16 12:00 AM to 11:00 PM daily until 11/18/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
County Road T (-0.1 miles) to County Road T (+0.2 miles) 16.7 to 16.4 Medium Various lanes closed 6/27/16 6:00 PM to 6/28/16 7:00 AM daily until 7/1/16 WisDOT Construction - Hudson - Baldwin | CTH T Bridge B-55-0260 | I 94 | ST. CROIX
at Front St (+0.4 miles) 0.3 Medium Left lane closed, three lanes open 6/27/16 9:00 AM to 3:00 PM daily until 6/28/16 WisDOT Maintenance - Bridge Inspection Hudson Bridge

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB 2nd St 0.8 Minor Various lanes closed 6/8/16 7:00 AM to 6/28/16 7:00 PM WisDOT Construction - AT&T Relocation for City Milwaukee-Street Car Project I-794 off ramp @ N Plankinton Ave to W St Paul Ave
Exit ramp to SB Lincoln Memorial Dr 3.0 Medium All lanes and shoulders closed 1/22/16 12:00 AM to 10/1/16 11:45 PM WisDOT Construction - Detour: Use EB I-794 to Jackson / Van Buren Exit to Van Buren St. to Michigan St. to Lincoln Memorial Dr.

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NEB Lincoln Memorial Dr 13.1 Medium All lanes and shoulders closed 2/22/16 12:00 AM to 7/30/16 11:45 PM WisDOT Construction - Detour: Use I-794 WB to Milwaukee St. Exit to Michigan St. to Lincoln Memorial Drive
Entrance ramp from SWB Lincoln Memorial Dr 0.9 Unknown All lanes and shoulders closed 1/11/16 12:00 AM to 10/1/16 11:45 PM WisDOT Construction - Detour: Use N. Lincoln Mem Dr to E. Michigan St to N. Jackson St to E. Clybourn St to I-794 WB

I-894 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB Lincoln Ave 1.8 Medium All lanes closed and both shoulders open 6/27/16 9:00 AM to 2:00 PM daily until 6/28/16 WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance from NB I-43 (Rock Fwy) 58.9 to 4.7 Minor Left lane closed, up to one lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
Entrance from NB I-43 4.7 to 5.0 Medium Various lanes closed 10/9/15 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Stillwater - Somerset | Cth E - 150th Ave, B-55-0226, C-55-0035 | Sth 64 | ST. CROIX

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB I-41 9.5 Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
US-45 to Beloit Rd (-0.1 miles) 4.4 to 3.7 Minor Left lane closed, one or two lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
Cleveland Ave (+0.1 miles) to WI-59 (+0.2 miles) 2.4 to 0.9 Medium Right lane closed, two lanes open 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from NEB National Ave 2.2 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: To go North: Take National Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/894/US 45 North Entrance Ramp; To go East: Take National Ave West to Hwy 100, Hwy 100 North to the I-94 East E
Entrance ramp from WB Lincoln Ave 1.8 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: To go North: Take Lincoln Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp; To go East: Take Lincoln Ave West to Hwy 100, Hwy 100 North to the I-94 East Entranc
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Whitney Way (-0.1 miles) to US-151 None All lanes and shoulders open 12/3/14 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Entrance ramp from Whitney Way None All lanes and shoulders open 3/20/16 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Exit ramp to SB US-151 None All lanes and shoulders open 3/20/16 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
US-151 to Seminole Hwy (+0.2 miles) None All lanes and shoulders open 3/20/16 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
at Monona Dr (-0.7 miles) Medium 0 lanes closed, three lanes open 6/27/16 7:00 PM to 6/28/16 6:00 AM daily until 7/15/16 WisDOT Construction - Sauk City - Cambridge | Yahara River B-13-0315 & B-13-0316 | USH 12 | DANE
Exit ramp to NB Monona Dr Medium All lanes closed 6/27/16 7:00 PM to 6/28/16 6:00 AM daily until 7/15/16 WisDOT Construction - Detour: No Detour Provided

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Monona Dr (+0.2 miles) Medium One lane closed, two lanes open 6/27/16 7:00 PM to 6/28/16 6:00 AM daily until 6/30/16 WisDOT Construction - Sauk City - Cambridge | Yahara River B-13-0315 & B-13-0316 | USH 12 | DANE
Entrance ramp from SB Monona Dr Medium All lanes closed 6/27/16 7:00 PM to 6/28/16 6:00 AM daily until 6/30/16 WisDOT Construction - Detour: No detour posted. PCMS will direct traffic to use WB Broadway
Todd Dr (+0.2 miles) to US-151 None All lanes and shoulders open 3/20/16 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Exit ramp to Seminole Hwy None All lanes and shoulders open 3/20/16 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
at US-151 (-0.1 miles) None All lanes and shoulders open 7/2/15 12:00 AM to 11/18/16 11:45 PM WisDOT Lane Restrictions; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
at US-151 (-0.1 miles) Major All lanes closed 6/27/16 10:00 PM to 6/28/16 5:00 AM daily until 7/1/16 WisDOT Construction - Detour: Use EB US 12 on ramp to NB CTH D off ramp. Take NB CTH D to WB US 12 on ramp.
US-151 to Whitney Way (+0.1 miles) None All lanes and shoulders open 12/3/14 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Exit ramp to NB Whitney Way None All lanes and shoulders open 3/20/16 12:00 AM to 11/18/16 11:45 PM WisDOT Lane restriction; Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
116th St to US-45 (+0.1 miles) 58.9 to 4.7 Minor Left lane closed, up to one lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
US-45 to Beloit Rd (-0.1 miles) 4.4 to 3.7 Minor Left lane closed, one or two lanes open 6/27/16 11:00 PM to 6/28/16 4:30 AM WisDOT Construction - Project ID: 1100-34-00 I-894 Storm Sewer Measure Down work by Kapur & Associates
Cleveland Ave (+0.1 miles) to WI-59 (+0.2 miles) 2.4 to 0.9 Medium Right lane closed, two lanes open 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Entrance ramp from NEB National Ave 2.2 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: To go North: Take National Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/894/US 45 North Entrance Ramp; To go East: Take National Ave West to Hwy 100, Hwy 100 North to the I-94 East E
Entrance ramp from WB Lincoln Ave 1.8 Medium All lanes and shoulders closed 4/16/16 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: To go North: Take Lincoln Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp; To go East: Take Lincoln Ave West to Hwy 100, Hwy 100 North to the I-94 East Entranc
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Entrance ramp from WB WI-59 0.8 Major All lanes and shoulders closed 4/16/16 12:00 AM to 7/29/16 11:45 PM WisDOT Construction - Detour: Ramps also closed) To go North: Take Greenfield Ave West to Hwy 100, Hwy 100 North to Watertown Plank Rd, Watertown Plank Rd East to the I-41/US 45 North Entrance Ramp To go East: Take Greenfield Ave East to Hawley Rd, Hawley Rd No
WI-145 to WI-145 Medium Various lanes closed 3/14/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
County Line Rd (-0.1 miles) to WI-145 Medium Various lanes closed 8/17/15 7:00 AM to 11/30/16 11:59 PM WisDOT Bridge reconstruction and widening of ramps, Resurfacing; Replacement of signals at interchanges
County Line Rd to Western Ave (-0.3 miles) Minor Left shoulder closed, all lanes open 3/14/16 12:00 AM to 6/30/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
Freistadt Rd to US-45 (+0.1 miles) Major Right two lanes closed, up to one lanes open 6/27/16 8:30 PM to 6/28/16 6:00 AM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
Exit ramp to EB WI-167 Major All lanes closed 6/27/16 8:30 PM to 6/28/16 6:00 AM WisDOT Construction - Detour: Continue north to STH 145, return to USH 45 NB. TRUCKS: Continue north to STH 60.
Entrance ramp from WB WI-167 Unknown All lanes closed 6/27/16 8:30 PM to 6/28/16 6:00 AM WisDOT Construction - Detour: Use IH 41 SB to Lannon Rd and return north.

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Western Ave (+0.2 miles) to County Line Rd Minor Left shoulder closed, all lanes open 3/14/16 12:00 AM to 7/15/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
WI-167 to Maple Rd Medium Left lane closed, two lanes open 6/27/16 9:30 AM to 6:00 PM daily until 6/30/16 WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
County Line Rd to WI-145 Medium Various lanes closed 3/14/16 12:00 AM to 9/30/16 11:45 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
Burleigh St to Meinecke Ave Major Left two lanes closed, one lane open 6/27/16 9:30 PM to 6/28/16 5:30 AM WisDOT Construction - Zoo IC, Center St Bridge | over USH 45 B-40-0880 | USH 45 | MILWAUKEE
Entrance ramp from EB Burleigh St Medium All lanes closed 6/27/16 9:30 PM to 6/28/16 5:30 AM WisDOT Construction - Detour: Continue east on Burleigh St to Mayfair Rd. Turn right onto Mayfair Rd and continue south the North Ave. Turn right onto North Ave and continue to USH 45.
Entrance ramp from EB Burleigh St Medium All lanes closed and both shoulders open 6/9/16 12:00 AM to 10/15/16 11:45 PM WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE
Center St (-0.1 miles) to Meinecke Ave Minor Left shoulder closed, all lanes open 3/10/16 12:00 AM to 8/27/16 11:45 PM WisDOT Construction - Zoo IC, Center St Bridge | over USH 45 B-40-0880 | USH 45 | MILWAUKEE
Exit ramp to Wisconsin Ave Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Exit ramp to EB I-94 Minor Various lanes closed 7/20/15 12:00 AM to 7/31/16 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Entrance ramp from WB Wisconsin Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Entrance ramp from WB I-94 0.3 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Exit ramp to WB Lincoln Ave 1.8 Medium All lanes closed and both shoulders open 6/27/16 9:00 AM to 2:00 PM daily until 6/28/16 WisDOT Construction - Zoo IC, Zoo Interchange Phase 2 | Lincoln - Bluemound, 121st - 70th | I 94 | MILWAUKEE

WI-119 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Mon Jun 27 2016 06:10:09 CDT