Construction Report
Select Location
  
Updated: 8/27/15 4:12 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Drive Rd (-0.1 miles) to Maple Grove Rd (-0.9 miles) 161.7 to 157.7 Medium Right lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Exit ramp to NB WI-73 160.2 Major All lanes and shoulders closed 8/27/15 10:00 PM to 8/28/15 5:00 AM WisDOT Construction - Detour: Take Exit 163 STH 59 WB to USH 51 NB
Maple Grove Rd (+0.1 miles) to Church Rd (+0.2 miles) 156.7 to 153.8 Medium Left lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | CTH A Bridge B-13-709 | I 39 | DANE

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-151 (-0.4 miles) to US-12 (+0.4 miles) 135.3 to 142.5 Major Right two lanes closed, up to one lanes open 8/27/15 9:00 PM to 8/28/15 6:00 AM WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
County Road B (+0.8 miles) to Maple Grove Rd (-0.1 miles) 153.7 to 156.8 Medium Left lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | CTH A Bridge B-13-709 | I 39 | DANE
Maple Grove Rd (+0.9 miles) to Lake Drive Rd (+0.1 miles) 157.7 to 161.7 Medium Left lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lawson School Rd to CR-X 16.9 to 17.4 Medium Left lane closed, one lane open 8/19/15 12:00 AM to 10/1/15 11:45 PM WisDOT Construction - Rock Freeway | Nb Elm Ridge Rd Bridges B-64-122,Ih-43 | I 43 | WALWORTH
CR-X to Elm Ridge Rd 17.4 to 17.7 Medium Right lane closed, one lane open 8/19/15 12:00 AM to 10/1/15 11:45 PM WisDOT Construction - Rock Freeway | Nb Elm Ridge Rd Bridges B-64-122,Ih-43 | I 43 | WALWORTH
Exit ramp to SWB WI-67 24.9 Minor Right lane closed, one lane open 8/28/15 9:00 AM to 3:00 PM WisDOT Construction - I 43 | New Signal, I 43 & STH 67 | STH 67 | WALWORTH
84th St (-0.1 miles) to WI-24 (+0.1 miles) 5.6 to 6.1 Medium Left lane closed, two lanes open 8/28/15 9:00 AM to 2:00 PM WisDOT Maintenance - Manhole Repair
Exit ramp to EB Howard Ave 315.2 Medium Left lane closed, two lanes open 8/25/15 12:00 AM to 10/15/15 11:45 PM WisDOT Construction - Detour: Left turn lane closed; left turn prohibited. Turn right and continue east to Howell Ave and find a suitable location to turn around. OR, do not use this exit, and instead follow posted detour to the Holt exit ramp, and follow detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St Medium All lanes and shoulders closed 8/27/15 9:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Follow posted detour to entrance ramp at 6th & Mineral Sts
Entrance ramp from WB Becher St Medium All lanes and shoulders closed 8/27/15 9:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route, but not entrance ramp from Lapham Blvd which will also be closed. Follow posted detour to entrance ramp at 6th & Mineral Sts
WI-32 to Pebble Beach Rd 93.3 to 110.4 Medium Right lane closed, one or two lanes open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Special Pavement Marking - 2015 | Locations On Stn Per Annual Plan | Var Hwy | SOUTHEAST REGION WIDE; Moving Operation

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Pebble Beach Rd to WI-32 (+0.2 miles) 110.6 to 100.4 Medium Right lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Special Pavement Marking - 2015 | Locations On Stn Per Annual Plan | Var Hwy | SOUTHEAST REGION WIDE; Moving Operation
Bruce St to Maple St 311.4 to 312.4 Medium Right lane closed, two lanes open 8/27/15 8:00 PM to 9:30 PM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
WI-38 (+0.1 miles) to Maple St 311.9 to 312.4 Major Right two lanes closed, one lane open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 8/27/15 8:15 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route (exit to National Ave before, or Holt Ave after)
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
Entrance ramp from NEB National Ave Medium All lanes and shoulders closed 8/27/15 8:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route, but not entrance ramp from Lapham Blvd which will also be closed. Use Becher St entrance ramp.
Exit ramp to NEB WI-67 25.7 Major All lanes closed and both shoulders open 8/28/15 9:00 AM to 3:00 PM WisDOT Construction - I 43 | New Signal, I 43 & STH 67 | STH 67 | WALWORTH

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-151 (-0.4 miles) to US-12 (+0.4 miles) 135.3 to 142.5 Major Right two lanes closed, up to one lanes open 8/27/15 9:00 PM to 8/28/15 6:00 AM WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
County Road B (+0.8 miles) to Maple Grove Rd (-0.1 miles) 153.7 to 156.8 Medium Left lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | CTH A Bridge B-13-709 | I 39 | DANE
Maple Grove Rd (+0.9 miles) to Lake Drive Rd (+0.1 miles) 157.7 to 161.7 Medium Left lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Drive Rd (-0.1 miles) to Maple Grove Rd (-0.9 miles) 161.7 to 157.7 Medium Right lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Exit ramp to NB WI-73 160.2 Major All lanes and shoulders closed 8/27/15 10:00 PM to 8/28/15 5:00 AM WisDOT Construction - Detour: Take Exit 163 STH 59 WB to USH 51 NB
Maple Grove Rd (+0.1 miles) to Church Rd (+0.2 miles) 156.7 to 153.8 Medium Left lane closed, one lane open 8/27/15 8:00 PM to 8/28/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | CTH A Bridge B-13-709 | I 39 | DANE

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-151 (-0.4 miles) to US-12 (+0.4 miles) 135.3 to 142.5 Major Right two lanes closed, up to one lanes open 8/27/15 9:00 PM to 8/28/15 6:00 AM WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
Springdale Rd (+0.1 miles) to Moorland Rd 296.4 to 300.6 Major Left two lanes closed, one or two lanes open 8/27/15 9:00 PM to 8/28/15 5:00 PM daily until 8/29/15 WisDOT Maintenance - Repair bridge approaches
WI-181 to 76th St 305.3 to 305.8 Major Right two lanes closed, one lane open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Bruce St to Maple St 311.4 to 312.4 Medium Right lane closed, two lanes open 8/27/15 8:00 PM to 9:30 PM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
WI-38 (+0.1 miles) to Maple St 311.9 to 312.4 Major Right two lanes closed, one lane open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 8/27/15 8:15 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route (exit to National Ave before, or Holt Ave after)
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 7/3/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium Left lane closed, two lanes open 8/25/15 12:00 AM to 10/15/15 11:45 PM WisDOT Construction - Detour: Left turn lane closed; left turn prohibited. Turn right and continue east to Howell Ave and find a suitable location to turn around. OR, do not use this exit, and instead follow posted detour to the Holt exit ramp, and follow detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St Medium All lanes and shoulders closed 8/27/15 9:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Follow posted detour to entrance ramp at 6th & Mineral Sts
Entrance ramp from WB Becher St Medium All lanes and shoulders closed 8/27/15 9:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route, but not entrance ramp from Lapham Blvd which will also be closed. Follow posted detour to entrance ramp at 6th & Mineral Sts
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to US-45 306.4 to 304.5 Medium Left lane closed, one or two lanes open 8/1/15 12:00 AM to 12/16/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St North to Bluemound, Bluemound West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland North to Bluemound, Bluemound East to HWY 100.
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: Take the 84th St exit North to Bluemound, Bluemound West to HWY 100. OR Take the US45 North Ramp North to the Watertown Plank Exit, Watertown Plank West to HWY 100. OR Take the Moorland exit to Bluemound or Greenfield, Bluemound or
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St South to Greenfield, Greenfield West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland South to Greenfield, Greenfield East to HWY 100.
Moorland Rd to Springdale Rd (-0.1 miles) 300.6 to 296.4 Medium Left two lanes closed, one lane open 8/28/15 1:00 AM to 5:00 AM WisDOT Maintenance - Repair bridge approaches
Cushing Park Rd to Waterville Rd 284.5 to 284.0 Minor Right lane closed, one lane open 8/27/15 9:00 PM to 11:30 PM WisDOT Maintenance - Repair bridge approaches

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
4th St to Lincoln Memorial Dr 0.4 to 3.1 Medium Right lane closed, two lanes open 12/11/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to SB Jackson St 0.8 Medium All lanes and shoulders closed 12/5/14 12:00 AM to 9/12/15 11:45 PM WisDOT Construction - Detour: Traffic uses Plankinton or St. Paul James Lovell
Exit ramp to NEB Lincoln Memorial Dr 1.0 Medium All lanes and shoulders closed 5/5/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Detour EB Michigan St. to LMD

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lincoln Memorial Dr (-0.1 miles) to Polk St (-0.4 miles) 11.3 to 12.5 Medium Right lane closed, two lanes open 8/28/15 10:00 AM to 2:00 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Lincoln Memorial Dr (-0.1 miles) to Harbor Dr 11.3 to 13.2 Major All lanes and shoulders closed 8/27/15 10:00 PM to 8/28/15 5:00 AM WisDOT Construction - Detour: Detour Carferry to Becher St. to I-43 NB to 794.
Entrance ramp from NWB Carferry Dr 11.3 Medium All lanes and shoulders closed 8/27/15 10:00 PM to 8/28/15 5:00 AM WisDOT Construction - Detour: Detour Carferry to Becher St. to I-43 NB to 794.
Exit ramp to NB WI-32 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 9/4/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive
Entrance ramp from SB Jackson St 13.8 Medium All lanes and shoulders closed 8/27/15 10:00 PM to 8/28/15 5:00 AM WisDOT Construction - Detour: NOne

I-894 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
84th St (-0.1 miles) to WI-24 (+0.1 miles) 5.6 to 6.1 Medium Left lane closed, two lanes open 8/28/15 9:00 AM to 2:00 PM WisDOT Maintenance - Manhole Repair

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB Oklahoma Ave 2.8 Minor Various lanes closed 7/22/15 12:00 AM to 9/14/15 11:45 PM WisDOT Construction - Zoo IC, 2015 TMP Projects | Various Locations, Mke And Wauk Co | IH 94 Milwaukee And Waukesha Counties | MILWAUKEE
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road K to Greenway Blvd Medium Various lanes closed 8/27/15 7:00 PM to 8/28/15 5:00 AM WisDOT Maintenance - Bridge maintenance
Gammon Rd (+0.2 miles) to Todd Dr (-0.4 miles) Medium Various lanes closed 8/27/15 8:00 PM to 8/28/15 5:00 AM daily until 8/29/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Exit ramp to SB US-151 Major All lanes and shoulders closed 8/27/15 10:00 PM to 8/28/15 5:00 AM daily until 8/29/15 WisDOT Construction - Detour: Use EB US 12 to Todd Dr off ramp. Take Todd Dr to WB US 12 on ramp. Use WB US 12 to SB US 151 exit.
Entrance from NB US-151 Minor Various lanes closed 8/27/15 10:00 PM to 8/28/15 5:00 AM daily until 8/29/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Fish Hatchery Rd to Agriculture Dr (+0.3 miles) Medium Left lane closed, two lanes open 8/27/15 7:00 PM to 8/28/15 6:00 AM WisDOT Construction - Detour: none
Fish Hatchery Rd to Agriculture Dr (+0.3 miles) Medium Left two lanes closed, one lane open 8/27/15 9:00 PM to 8/28/15 5:00 AM WisDOT Construction - Detour: none

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-39 (+0.3 miles) to Fish Hatchery Rd Medium Left lane closed, two or three lanes open 8/27/15 7:00 PM to 8/28/15 6:00 AM WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Agriculture Dr to Monona Dr (+0.7 miles) Medium Left two lanes closed, one or two lanes open 8/27/15 9:00 PM to 8/28/15 5:00 AM WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Monona Dr (+0.7 miles) to Fish Hatchery Rd Medium Left two lanes closed, one lane open 8/27/15 9:00 PM to 8/28/15 5:00 AM WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Greenway Blvd (-0.2 miles) to County Road K Medium Various lanes closed 8/27/15 7:00 PM to 8/28/15 5:00 AM WisDOT Maintenance - Bridge maintenance

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium Left lane closed, two lanes open 8/25/15 12:00 AM to 10/15/15 11:45 PM WisDOT Construction - Detour: Left turn lane closed; left turn prohibited. Turn right and continue east to Howell Ave and find a suitable location to turn around. OR, do not use this exit, and instead follow posted detour to the Holt exit ramp, and follow detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Lincoln Ave to Greenfield Ave 312.9 to 312.0 Major Right two lanes closed, one or two lanes open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Entrance ramp from WB Becher St Medium All lanes and shoulders closed 8/27/15 9:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Follow posted detour to entrance ramp at 6th & Mineral Sts
Entrance ramp from WB Becher St Medium All lanes and shoulders closed 8/27/15 9:00 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route, but not entrance ramp from Lapham Blvd which will also be closed. Follow posted detour to entrance ramp at 6th & Mineral Sts
Exit ramp to SB Pilgrim Rd Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Exit SB Main Street (STH 74). Continue on Main Street to Pilgrim Road. End Detour
Entrance ramp from SB Pilgrim Rd Medium All lanes and shoulders closed 5/12/15 12:00 AM to 9/3/15 11:45 PM WisDOT Construction - Detour: Continue straight onto Pilgrim Road going south. Turn Left onto Main Street (STH 74) going east. Turn Left onto US45/41 NB On Ramp. End Detour.
County Line Rd to WI-145 (-1.2 miles) Medium Various lanes closed 8/17/15 7:00 AM to 11/30/16 11:59 PM WisDOT Bridge reconstruction and widening of ramps, Resurfacing; Replacement of signals at interchanges
County Line Rd to US-41 (+0.2 miles) Medium Left lane closed, two lanes open 8/28/15 6:00 AM to 1:00 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at St Anthony Rd (-1.2 miles) Medium Right lane closed, one lane open 8/27/15 9:00 AM to 9:30 PM daily until 8/28/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
WI-145 to County Line Rd (-0.1 miles) Medium Right lane closed, one or two lanes open 8/27/15 9:30 AM to 7:30 PM daily until 8/28/15 WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
US-45 (-0.1 miles) to County Line Rd Medium Various lanes closed 8/17/15 7:00 AM to 11/30/16 11:59 PM WisDOT Bridge reconstruction and widening of ramps, Resurfacing; Replacement of signals at interchanges
Exit ramp to NB Stolper Dr Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Continue on 45SB to Main Street (STH 74) Exit Ramp. Take Main Street Exit, Turn Left onto Main Street. Continue on Main Street to Pilgrim Road. End Detour.
Entrance ramp from NB Pilgrim Rd Medium All lanes and shoulders closed 8/24/15 12:00 AM to 10/31/15 11:45 PM WisDOT Construction - Detour: Turn Right onto Main Street (STH 74) from Pilgrim Road going east. Turn Right onto US45/41 SB On Ramp. End Detour.
Bruce St to Maple St 311.4 to 312.4 Medium Right lane closed, two lanes open 8/27/15 8:00 PM to 9:30 PM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
WI-38 (+0.1 miles) to Maple St 311.9 to 312.4 Major Right two lanes closed, one lane open 8/27/15 9:30 PM to 8/28/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 8/27/15 8:15 PM to 8/28/15 5:30 AM WisDOT Construction - Detour: Use alt route (exit to National Ave before, or Holt Ave after)
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 7/3/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB Oklahoma Ave 2.8 Minor Various lanes closed 7/22/15 12:00 AM to 9/14/15 11:45 PM WisDOT Construction - Zoo IC, 2015 TMP Projects | Various Locations, Mke And Wauk Co | IH 94 Milwaukee And Waukesha Counties | MILWAUKEE
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Exit ramp to WB I-94 0.5 Major All lanes and shoulders closed 3/9/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: I-894/US 45 to Beloit Rd to HWY 100 to the I-94 West Ramp. And I-894/US 45 to Greenfield to HWY 100 to the I-94 West Ramp. And US 45 North to Watertown Plank to HWY 100 to the I-94 West Ramp.
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
Underwood Pky to Burleigh St Major Left two lanes closed, one lane open 8/28/15 2:00 AM to 5:30 AM WisDOT Construction - Zoo Ic, Ped Bridge Over Ush 45 | At Wauwatosa West Hs | Ush 45 Milwaukee County | MILWAUKEE
Exit ramp to EB Burleigh St Minor Right lane closed, two lanes open 8/27/15 12:00 AM to 9/25/15 11:45 PM WisDOT Permit - NB Ramp right turn lane closed
Exit ramp to SB Pilgrim Rd Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Exit SB Main Street (STH 74). Continue on Main Street to Pilgrim Road. End Detour
Entrance ramp from SB Pilgrim Rd Medium All lanes and shoulders closed 5/12/15 12:00 AM to 9/3/15 11:45 PM WisDOT Construction - Detour: Continue straight onto Pilgrim Road going south. Turn Left onto Main Street (STH 74) going east. Turn Left onto US45/41 NB On Ramp. End Detour.
County Line Rd to WI-145 (-1.2 miles) Medium Various lanes closed 8/17/15 7:00 AM to 11/30/16 11:59 PM WisDOT Bridge reconstruction and widening of ramps, Resurfacing; Replacement of signals at interchanges
County Line Rd to US-41 (+0.2 miles) Medium Left lane closed, two lanes open 8/28/15 6:00 AM to 1:00 PM WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-145 to County Line Rd (-0.1 miles) Medium Right lane closed, one or two lanes open 8/27/15 9:30 AM to 7:30 PM daily until 8/28/15 WisDOT Construction - Milwaukee - Fond du Lac | Wash Co Ln To Ush 41/45 Split Rdwy | USH 41 | WASHINGTON
US-45 (-0.1 miles) to County Line Rd Medium Various lanes closed 8/17/15 7:00 AM to 11/30/16 11:59 PM WisDOT Bridge reconstruction and widening of ramps, Resurfacing; Replacement of signals at interchanges
Exit ramp to NB Stolper Dr Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Continue on 45SB to Main Street (STH 74) Exit Ramp. Take Main Street Exit, Turn Left onto Main Street. Continue on Main Street to Pilgrim Road. End Detour.
Entrance ramp from NB Pilgrim Rd Medium All lanes and shoulders closed 8/24/15 12:00 AM to 10/31/15 11:45 PM WisDOT Construction - Detour: Turn Right onto Main Street (STH 74) from Pilgrim Road going east. Turn Right onto US45/41 SB On Ramp. End Detour.
Exit ramp to SB 94th St Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Entrance ramp from WB I-94 0.3 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp

WI-16 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Brown St (-0.5 miles) to Sawyer Rd (+0.2 miles) Medium Right lane closed, two lanes open 6/23/15 12:00 AM to 9/25/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
Exit ramp to SB Lakeland Dr Medium All lanes and shoulders closed 8/28/15 8:00 AM to 3:00 PM WisDOT Maintenance - Detour: Exit at STH 83, enter STH 16 WB and exit on CTH C
CR-JK (-0.1 miles) to CR-JK (+0.3 miles) Major Left lane closed, two lanes open 8/27/15 9:00 AM to 5:00 PM daily until 8/28/15 WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

WI-16 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-JK (-0.3 miles) to CR-JK (+0.3 miles) Major Left lane closed, two lanes open 8/28/15 6:00 AM to 2:00 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
Sawyer Rd (-0.2 miles) to Brown St (+0.5 miles) Medium Right lane closed, two lanes open 6/23/15 12:00 AM to 9/25/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
Exit ramp to NB Brown St Medium All lanes and shoulders closed 8/25/15 12:00 AM to 9/22/15 11:45 PM WisDOT Construction - Detour: Continue on westbound WIS 16, then exit onto northbound WIS 67/WIS 16. Proceed north to County Z. Go east on County Z to connect to County P.

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Thu Aug 27 2015 16:20:09 CDT