Construction Report
Select Location
  
Updated: 12/19/14 7:30 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Ruger Ave (-0.1 miles) 174.3 Medium Right lane closed, one lane open 12/19/14 8:00 PM to 12/20/14 5:00 AM daily until 12/23/14 WisDOT Construction - Soil borings for I-39 South Segement design project ID 1003-10-01

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Hampton Ave (+0.1 miles) to Hampton Ave (+0.1 miles) 76.7 to 76.7 Medium Right lane closed, two lanes open 12/19/14 9:00 AM to 2:00 PM WisDOT Permit - IH-43 SOUTHBOUND OVER THE MILWAUKEE RIVER AT HAMPTON AVE

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Ruger Ave (-0.1 miles) 174.3 Medium Right lane closed, one lane open 12/19/14 8:00 PM to 12/20/14 5:00 AM daily until 12/23/14 WisDOT Construction - Soil borings for I-39 South Segement design project ID 1003-10-01

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from NB Miller Park Way 307.9 Major All lanes and shoulders closed 12/19/14 11:00 PM to 12/21/14 6:00 AM WisDOT Construction - Detour: Take the Wisconsin Exit Ramp to Bluemound, continue West to Glenview to Watertown Plank to the US45 South Ramp to IH94 West
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 12/23/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 12/23/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
WI-50 (+0.3 miles) to Wilmot Rd (+0.2 miles) 344.3 to 345.8 Major Right two lanes closed, one lane open 12/16/14 9:30 PM to 12/19/14 10:00 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-165 (+0.4 miles) to Wilmot Rd (+0.2 miles) 346.6 to 345.4 Major Right two lanes closed, one lane open 12/16/14 9:30 PM to 12/19/14 8:00 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 12/23/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
44th St to I-894 307.8 to 304.3 Major All lanes and shoulders closed 12/19/14 11:00 PM to 12/20/14 5:00 AM daily until 12/21/14 WisDOT Construction - Detour: Take Exit 308B, Miller Park Way/HWY 341 South to National Ave to Greenfield Ave to I-894/US45.
Entrance ramp from SB US-41 307.6 Major All lanes and shoulders closed 12/19/14 11:00 PM to 12/20/14 5:00 AM daily until 12/21/14 WisDOT Construction - Detour: Take National Ave to Greenfield Ave to I-894/US45.
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 12/6/14 12:00 AM to 12/16/15 11:45 PM WisDOT Construction - Detour: Take Bluemound to Hawley to the I-94 West Ramp
Entrance ramp from SB Hawley Rd 306.8 Medium All lanes and shoulders closed 12/19/14 10:00 PM to 12/20/14 5:30 AM daily until 12/21/14 WisDOT Construction - Detour: Take Hawley to Bluemound to Glenview to Watertown Plank to the US45 Southbound ramp to I-94 West.
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
4th St to Lincoln Memorial Dr 0.4 to 3.1 Medium Right lane closed, two lanes open 12/11/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to SB Jackson St 0.8 Medium All lanes and shoulders closed 12/5/14 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Traffic uses Plankinton or St. Paul James Lovell

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-59 1.3 Major All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-165 (+0.4 miles) to Wilmot Rd (+0.2 miles) 346.6 to 345.4 Major Right two lanes closed, one lane open 12/16/14 9:30 PM to 12/19/14 8:00 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 12/23/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB I-94 Major All lanes and shoulders closed 12/19/14 11:00 PM to 12/20/14 5:00 AM daily until 12/21/14 WisDOT Construction - Detour: Take National Ave to Greenfield Ave to I-894/US45.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 12/23/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 12/23/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
WI-50 (+0.3 miles) to Wilmot Rd (+0.2 miles) 344.3 to 345.8 Major Right two lanes closed, one lane open 12/16/14 9:30 PM to 12/19/14 10:00 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-59 1.3 Major All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
County Hwy Nn (+0.3 miles) to Paradise Dr Major Left lane closed, two lanes open 12/19/14 8:00 AM to 2:00 PM WisDOT Maintenance - Accident Repair

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to SB 94th St Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp

Miller Park Way NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB I-94 Major All lanes and shoulders closed 12/19/14 11:00 PM to 12/21/14 6:00 AM WisDOT Construction - Detour: Take the Wisconsin Exit Ramp to Bluemound, continue West to Glenview to Watertown Plank to the US45 South Ramp to IH94 West

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Fri Dec 19 07:34:45 CST 2014