Construction Report
Select Location
  
Updated: 8/4/15 4:34 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Drive Rd (-0.1 miles) to Maple Grove Rd (-0.9 miles) 161.7 to 157.7 Medium Right lane closed, one lane open 8/4/15 8:00 PM to 8/5/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Lake Drive Rd (-0.1 miles) to Maple Grove Rd (-0.9 miles) 161.7 to 157.7 Medium Left lane closed, one lane open 8/3/15 8:00 PM to 8/4/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 8/4/15 10:00 PM to 8/5/15 5:00 AM WisDOT Construction - Detour: USH 51 SB to STH 59 EB to IH 39/90 NB
Siggelkow Rd (+0.2 miles) to Lien Rd (+0.1 miles) 143.7 to 136.7 Major Right two lanes closed, up to one lanes open 8/3/15 9:00 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
WI-30 to WI-19 (-0.3 miles) 138.1 to 131.2 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 3:00 PM WisDOT Maintenance - Moving left lane closure for sweeping of inside barrier wall.; Moing Operation
Cascade Mountain Rd (+0.4 miles) to Grotzke Rd (+1.4 miles) 85.7 to 96.0 Medium Right lane closed, one lane open 8/4/15 7:00 AM to 4:00 PM daily until 8/6/15 WisDOT Maintenance - Constructing expansion joints in conc. pavement

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Grotzke Rd (-1.4 miles) to Cascade Mountain Rd (-0.4 miles) 96.0 to 85.7 Medium Right lane closed, one lane open 8/4/15 7:00 AM to 4:00 PM daily until 8/6/15 WisDOT Moving Operation; Maintenance - Constructing expansion joint in conc. pavement
US-151 (-0.4 miles) to Siggelkow Rd (-0.1 miles) 135.3 to 143.8 Major Right two lanes closed, up to one lanes open 8/3/15 9:00 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
Maple Grove Rd (+0.9 miles) to Lake Drive Rd (+0.1 miles) 157.7 to 161.7 Medium Right lane closed, one lane open 8/3/15 8:00 PM to 8/4/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Maple Grove Rd (+0.9 miles) to Lake Drive Rd (+0.1 miles) 157.7 to 161.7 Medium Left lane closed, one lane open 8/4/15 8:00 PM to 8/5/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-39 (-0.1 miles) to Hart Rd (+0.3 miles) Medium Right lane closed, one lane open 8/4/15 8:00 PM to 8/5/15 4:30 AM WisDOT Construction - Soil Borings for I-43 reconstruction
Lawson School Rd to Elm Ridge Rd 16.9 to 17.7 Medium Left lane closed, one lane open 6/24/15 10:00 AM to 8/13/15 12:00 AM WisDOT Construction - Rock Freeway | Nb Elm Ridge Rd Bridges B-64-122,Ih-43 | I 43 | WALWORTH
Exit ramp to SWB WI-67 24.9 Minor Right lane closed, one lane open 8/4/15 9:00 AM to 3:00 PM daily until 8/7/15 WisDOT Construction - I 43 | New Signal, I 43 & STH 67 | STH 67 | WALWORTH
Exit ramp to SB Racine Ave 53.1 Medium All lanes and shoulders closed 8/3/15 8:00 PM to 8/4/15 5:00 AM daily until 8/7/15 WisDOT Construction - Detour: Detour Route is posted - use CTH O - Moorland Rd exit.
Entrance ramp from NB Racine Ave 53.1 Medium All lanes and shoulders closed 8/3/15 8:00 PM to 8/4/15 5:00 AM daily until 8/7/15 WisDOT Construction - Detour: Detour Route is posted - use CTH O - Moorland Rd exit.
Ramp from NB I-43 to EB I894 4.6 to 4.8 Major All lanes and shoulders closed 8/4/15 11:00 PM to 8/5/15 4:30 AM WisDOT Construction - Detour: Detour will be in placing using Beloit Avenue to route traffic onto EB 894
at US-45 (+0.1 miles) 4.7 Major All lanes closed and both shoulders open 8/3/15 9:30 PM to 8/4/15 5:30 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
122nd St to Mohawk Rd (+1.8 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB WI-100 82.1 Major All lanes and shoulders closed 8/3/15 7:30 PM to 8/4/15 5:30 AM WisDOT Construction - Detour: Use Mooreland Road
Exit ramp to EB WI-100 81.8 Major All lanes and shoulders closed 8/3/15 7:30 PM to 8/4/15 5:30 AM WisDOT Construction - Detour: Use Mooreland Road
Mohawk Rd (-0.7 miles) to 122nd St (+0.5 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Bruce St to WI-38 311.4 to 313.1 Major Right two lanes closed, one lane open 8/3/15 11:00 PM to 8/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Ramp from National Ave to SB I-43 311.5 Major All lanes and shoulders closed 8/3/15 11:00 PM to 8/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (entrance ramp from Lapham Blvd)
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
US-45 (-0.1 miles) to WI-100 4.5 to 59.6 Medium Right lane closed, up to two lanes open 8/4/15 7:30 PM to 8/5/15 5:30 AM WisDOT Construction - ROCK FREEWAY | HALE INTERCHANGE B-40-300-305,322 | I 43 | MILWAUKEE
US-45 (-0.1 miles) to WI-100 4.5 to 59.6 Major Left two lanes closed, up to one lanes open 8/3/15 7:30 PM to 8/4/15 5:30 AM WisDOT Construction - ROCK FREEWAY | HALE INTERCHANGE B-40-300-305,322 | I 43 | MILWAUKEE
Exit ramp to NEB WI-67 25.7 Minor Right lane closed, one lane open 8/4/15 9:00 AM to 3:00 PM daily until 8/7/15 WisDOT Construction - I 43 | New Signal, I 43 & STH 67 | STH 67 | WALWORTH

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-151 (-0.4 miles) to Siggelkow Rd (-0.1 miles) 135.3 to 143.8 Major Right two lanes closed, up to one lanes open 8/3/15 9:00 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
Maple Grove Rd (+0.9 miles) to Lake Drive Rd (+0.1 miles) 157.7 to 161.7 Medium Right lane closed, one lane open 8/3/15 8:00 PM to 8/4/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Maple Grove Rd (+0.9 miles) to Lake Drive Rd (+0.1 miles) 157.7 to 161.7 Medium Left lane closed, one lane open 8/4/15 8:00 PM to 8/5/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Drive Rd (-0.1 miles) to Maple Grove Rd (-0.9 miles) 161.7 to 157.7 Medium Right lane closed, one lane open 8/4/15 8:00 PM to 8/5/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Lake Drive Rd (-0.1 miles) to Maple Grove Rd (-0.9 miles) 161.7 to 157.7 Medium Left lane closed, one lane open 8/3/15 8:00 PM to 8/4/15 5:00 AM WisDOT Construction - Illinois State Line - Madison | USH 51/STH 73 Interchange | I 39 | DANE
Exit ramp to NB US-51 156.6 Major All lanes and shoulders closed 8/4/15 10:00 PM to 8/5/15 5:00 AM WisDOT Construction - Detour: USH 51 SB to STH 59 EB to IH 39/90 NB
Siggelkow Rd (+0.2 miles) to Lien Rd (+0.1 miles) 143.7 to 136.7 Major Right two lanes closed, up to one lanes open 8/3/15 9:00 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
WI-30 to WI-19 (-0.3 miles) 138.1 to 131.2 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 3:00 PM WisDOT Maintenance - Moving left lane closure for sweeping of inside barrier wall.; Moing Operation

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-151 (-0.4 miles) to Siggelkow Rd (-0.1 miles) 135.3 to 143.8 Major Right two lanes closed, up to one lanes open 8/3/15 9:00 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
CR-N (+0.2 miles) to WI-89 (+0.1 miles) 244.2 to 259.1 Medium Right lane closed, one lane open 8/4/15 8:00 PM to 8/5/15 6:00 AM WisDOT Moving Operation; Construction - SW Region Pvmt Marking, Eastern Cntys | STH Locations Per Annual Plan | Var Hwy | SOUTHWEST REGION WIDE
at County Road D (-0.5 miles) 270.0 Medium Right lane closed, one lane open 8/3/15 7:00 PM to 8/4/15 6:00 AM daily until 8/6/15 WisDOT Construction - I-94 at Johnson Creek. Work performed adjacent to right lane shoulder. EB right lane closure for geotechnical drilling/subsurface investigation.
Mohawk Rd (-0.7 miles) to 122nd St (+0.5 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Bruce St to WI-38 311.4 to 313.1 Major Right two lanes closed, one lane open 8/3/15 11:00 PM to 8/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Ramp from National Ave to SB I-43 311.5 Major All lanes and shoulders closed 8/3/15 11:00 PM to 8/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (entrance ramp from Lapham Blvd)
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
Ramsey Ave (+0.1 miles) to College Ave (-0.1 miles) 318.3 to 318.6 Minor Right lane closed, two lanes open 8/5/15 12:30 AM to 3:00 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 8/4/15 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use alternate route
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 7/3/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
122nd St to Mohawk Rd (+1.8 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Rawson Ave (-0.2 miles) to Rawson Ave (+0.3 miles) 319.9 to 319.4 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 2:00 PM WisDOT Maintenance - Inlet Repair
Rawson Ave (+0.4 miles) to College Ave (+0.1 miles) 319.2 to 318.6 Medium Left three lanes closed, one lane open 8/5/15 12:00 AM to 2:00 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
College Ave (-0.1 miles) to College Ave (+0.1 miles) 318.8 to 318.6 Medium Left three lanes closed, one lane open 8/4/15 9:30 PM to 8/5/15 1:30 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
College Ave (-0.1 miles) to Ramsey Ave (-0.1 miles) 318.8 to 318.3 Minor Right lane closed, two lanes open 8/5/15 12:30 AM to 3:00 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
25th St to 35th St 309.1 to 308.4 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Bridge Repair
Entrance ramp from SB 28th St 308.7 Medium All lanes and shoulders closed 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use Alt Route
Exit ramp to NB 34th St 308.5 Medium All lanes and shoulders closed 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use Alt Route
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to US-45 306.4 to 304.5 Medium Left lane closed, one or two lanes open 8/1/15 12:00 AM to 12/16/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St North to Bluemound, Bluemound West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland North to Bluemound, Bluemound East to HWY 100.
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: Take the 84th St exit North to Bluemound, Bluemound West to HWY 100. OR Take the US45 North Ramp North to the Watertown Plank Exit, Watertown Plank West to HWY 100. OR Take the Moorland exit to Bluemound or Greenfield, Bluemound or
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 8/1/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Take I-94 to the 84th St Exit, 84th St South to Greenfield, Greenfield West to HWY 100 OR Take I-94 to the Moorland Exit, Moorland South to Greenfield, Greenfield East to HWY 100.
Moreland Blvd to Eales Ave Major All lanes and shoulders closed 7/27/15 12:00 AM to 8/7/15 11:00 PM WisDOT Permit - Detour: S. on Whiterock to Main, West on Main to Barstow, N. on Barstow to St. Paul, NE on St. Paul to USH 18
at County Road D (+0.5 miles) 270.0 Medium Left lane closed, one lane open 8/3/15 7:00 PM to 8/4/15 6:00 AM daily until 8/6/15 WisDOT Construction - I-94 at Johnson Creek. Work performed adjacent to left lane shoulder and in median. WB left lane closure for geotechnical drilling/subsurface investigation.
at County Road D (+0.5 miles) 270.0 Medium Left lane closed, one lane open 8/4/15 12:00 PM to 3:00 PM WisDOT Maintenance - Bridge Maintenance
Rock Lake Rd to Rock Lake Rd 257.8 to 257.7 Medium Left lane closed, one lane open 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Bridge Maintenance
Siggelkow Rd (+0.2 miles) to Lien Rd (+0.1 miles) 143.7 to 136.7 Major Right two lanes closed, up to one lanes open 8/3/15 9:00 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - Janesville - Portage | USH 12/18 - STH 30 | I 39 | DANE
WI-30 to WI-19 (-0.3 miles) 138.1 to 131.2 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 3:00 PM WisDOT Maintenance - Moving left lane closure for sweeping of inside barrier wall.; Moing Operation

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ramp from 4th St to EB I-794 0.4 Major All lanes and shoulders closed 8/4/15 10:00 PM to 8/5/15 5:00 AM WisDOT Construction - Detour: Detour Clybourn to Water/1st. ST. to Becher St. to Carferry to 794.
4th St to Lincoln Memorial Dr 0.4 to 3.1 Medium Right lane closed, two lanes open 12/11/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to SB Jackson St 0.8 Medium All lanes and shoulders closed 12/5/14 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Traffic uses Plankinton or St. Paul James Lovell
Exit ramp to NEB Lincoln Memorial Dr 1.0 Medium All lanes and shoulders closed 5/5/15 12:00 AM to 11/30/15 11:45 PM WisDOT Construction - Detour: Detour EB Michigan St. to LMD
Entrance ramp from NB Jackson ST 1.1 Unknown All lanes and shoulders closed 8/3/15 10:00 PM to 8/4/15 5:00 AM WisDOT Construction - Detour: None

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Carferry Dr to Polk St (-0.3 miles) 11.1 to 12.7 Medium Right lane closed, two lanes open 8/4/15 10:00 AM to 2:00 PM daily until 8/7/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Carferry Dr to Polk St (-0.3 miles) 11.1 to 12.7 Medium Right lane closed, two lanes open 8/3/15 7:30 PM to 8/4/15 6:00 AM daily until 8/8/15 WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE
Exit ramp to NEB Lincoln Memorial Dr 13.1 Medium All lanes and shoulders closed 8/3/15 10:00 PM to 8/4/15 5:00 AM daily until 8/6/15 WisDOT Construction - Detour: None
Exit ramp to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-12 (-0.2 miles) to Seminole Hwy (-0.3 miles) Minor Various lanes closed 8/3/15 10:00 PM to 8/4/15 5:00 AM daily until 8/7/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
US-12 (+0.1 miles) to Seminole Hwy (+0.3 miles) Minor Various lanes closed 8/3/15 10:00 PM to 8/4/15 5:00 AM daily until 8/7/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
Fish Hatchery Rd to Agriculture Dr (+0.3 miles) Medium Left lane closed, two lanes open 8/3/15 7:00 PM to 8/4/15 6:00 AM daily until 8/15/15 WisDOT Construction - Detour: none
Fish Hatchery Rd to Agriculture Dr (+0.3 miles) Medium Left two lanes closed, one lane open 8/3/15 9:00 PM to 8/4/15 5:00 AM daily until 8/15/15 WisDOT Construction - Detour: none

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-39 (+0.3 miles) to Fish Hatchery Rd Medium Left lane closed, two or three lanes open 8/3/15 7:00 PM to 8/4/15 6:00 AM daily until 8/15/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Agriculture Dr to Monona Dr (+0.7 miles) Medium Left two lanes closed, one or two lanes open 8/3/15 9:00 PM to 8/4/15 5:00 AM daily until 8/15/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Monona Dr (+0.7 miles) to Fish Hatchery Rd Medium Left two lanes closed, one lane open 8/3/15 9:00 PM to 8/4/15 5:00 AM daily until 8/15/15 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
US-12 (+0.1 miles) to Seminole Hwy (+0.3 miles) Minor Various lanes closed 8/3/15 10:00 PM to 8/4/15 5:00 AM daily until 8/7/15 WisDOT Construction - MOUNT HOREB - MADISON | VERONA R - SEMINOLE HIGHWAY | USH 18 | DANE
at US-18 Minor Right lane closed, one lane open 8/4/15 12:00 AM to 5:00 AM WisDOT Maintenance - Bridge Maintenance

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
122nd St to Mohawk Rd (+1.8 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Rawson Ave (-0.2 miles) to Rawson Ave (+0.3 miles) 319.9 to 319.4 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 2:00 PM WisDOT Maintenance - Inlet Repair
Rawson Ave (+0.4 miles) to College Ave (+0.1 miles) 319.2 to 318.6 Medium Left three lanes closed, one lane open 8/5/15 12:00 AM to 2:00 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
College Ave (-0.1 miles) to College Ave (+0.1 miles) 318.8 to 318.6 Medium Left three lanes closed, one lane open 8/4/15 9:30 PM to 8/5/15 1:30 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
College Ave (-0.1 miles) to Ramsey Ave (-0.1 miles) 318.8 to 318.3 Minor Right lane closed, two lanes open 8/5/15 12:30 AM to 3:00 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
25th St to 35th St 309.1 to 308.4 Medium Right lane closed, two lanes open 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Bridge Repair
Entrance ramp from SB 28th St 308.7 Medium All lanes and shoulders closed 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use Alt Route
Exit ramp to NB 34th St 308.5 Medium All lanes and shoulders closed 8/4/15 9:00 AM to 12:00 PM WisDOT Maintenance - Detour: Use Alt Route
Exit ramp to SB Pilgrim Rd Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Exit SB Main Street (STH 74). Continue on Main Street to Pilgrim Road. End Detour
Entrance ramp from SB Pilgrim Rd Medium All lanes and shoulders closed 5/12/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - Detour: Continue straight onto Pilgrim Road going south. Turn Left onto Main Street (STH 74) going east. Turn Left onto US45/41 NB On Ramp. End Detour.

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mohawk Rd (-0.7 miles) to 122nd St (+0.5 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to NB Stolper Dr Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Continue on 45SB to Main Street (STH 74) Exit Ramp. Take Main Street Exit, Turn Left onto Main Street. Continue on Main Street to Pilgrim Road. End Detour.
Bruce St to WI-38 311.4 to 313.1 Major Right two lanes closed, one lane open 8/3/15 11:00 PM to 8/4/15 5:30 AM WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Ramp from National Ave to SB I-43 311.5 Major All lanes and shoulders closed 8/3/15 11:00 PM to 8/4/15 5:30 AM WisDOT Construction - Detour: Use alt route (entrance ramp from Lapham Blvd)
Exit ramp to Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St exit
Exit ramp to WB Lapham Blvd 311.9 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Becher St or National Ave exits
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave exit
Exit ramp to EB Howard Ave 315.0 Medium All lanes and shoulders closed 6/16/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route via Holt Ave or Layton Ave entrances
Ramsey Ave (+0.1 miles) to College Ave (-0.1 miles) 318.3 to 318.6 Minor Right lane closed, two lanes open 8/5/15 12:30 AM to 3:00 AM WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 8/4/15 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use alternate route
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major Left lane closed, two lanes open 7/3/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to EB WI-59 1.3 Medium All lanes and shoulders closed 10/15/14 12:00 AM to 11/30/17 11:45 PM WisDOT Construction - Detour: Take Greenfield Exit West to 108th st, 108th st North to Bluemound (West Bluemound Detour). Take Greenfield East to 84th st, 84th st North to Bluemound. (East Bluemound Detour)
Exit ramp to WB I-94 0.5 Major All lanes and shoulders closed 3/9/15 12:00 AM to 11/28/15 11:45 PM WisDOT Construction - Detour: I-894/US 45 to Beloit Rd to HWY 100 to the I-94 West Ramp. And I-894/US 45 to Greenfield to HWY 100 to the I-94 West Ramp. And US 45 North to Watertown Plank to HWY 100 to the I-94 West Ramp.
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 10/3/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: Wisconsin Ave to 97th St to Bluemound to HWY 100 to North Ave to USH 45 NB -- Wisconsin to 84th St to Watertown Plank Rd to USH 45 NB
122nd St to Mohawk Rd (+1.8 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to SB Pilgrim Rd Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Exit SB Main Street (STH 74). Continue on Main Street to Pilgrim Road. End Detour
Entrance ramp from SB Pilgrim Rd Medium All lanes and shoulders closed 5/12/15 12:00 AM to 8/28/15 11:45 PM WisDOT Construction - Detour: Continue straight onto Pilgrim Road going south. Turn Left onto Main Street (STH 74) going east. Turn Left onto US45/41 NB On Ramp. End Detour.

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Mohawk Rd (-0.7 miles) to 122nd St (+0.5 miles) Medium Various lanes closed 8/4/15 9:00 AM to 3:00 PM daily until 9/4/15 WisDOT Construction - I 41 Conversion, State Line - Green Bay | Russell Rd - SCL Dodge, Signing | USH 41 | SOUTHEAST REGION WIDE
Exit ramp to NB Stolper Dr Medium All lanes and shoulders closed 4/20/15 12:00 AM to 12/31/15 11:45 PM WisDOT Construction - Detour: Continue on 45SB to Main Street (STH 74) Exit Ramp. Take Main Street Exit, Turn Left onto Main Street. Continue on Main Street to Pilgrim Road. End Detour.
Exit ramp to WB Capitol Dr Medium All lanes and shoulders closed 7/20/15 12:00 AM to 8/6/15 11:45 PM WisDOT Construction - Detour: Follow Hampton to 124th or Burleigh to 124th to Captiol
Exit ramp to WB Burleigh St Minor Right lane closed, two lanes open 8/4/15 6:00 AM to 3:00 PM daily until 8/14/15 WisDOT Permit - SB Ramp right turn lane closed
Burleigh St (-0.2 miles) to Center St Major Left two lanes closed, one lane open 8/5/15 3:00 AM to 5:30 AM daily until 8/6/15 WisDOT Construction - Zoo Ic, Ped Bridge Over Ush 45 | At Wauwatosa West Hs | Ush 45 Milwaukee County | MILWAUKEE
Exit ramp to SB 94th St Medium All lanes and shoulders closed 10/15/14 12:00 AM to 12/31/16 11:45 PM WisDOT Construction - Detour: USH 45 to North Ave to HWY 100 to Wisconsin
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 11/19/14 12:00 AM to 11/1/16 11:45 PM WisDOT Construction - Detour: Take HWY 100 to Watertown Plank to the US45 SB Entrance Ramp. OR Take Glenview to Watertown Plank to the US45 SB Entrance Ramp
Entrance ramp from WB I-94 0.3 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
US-45 (-0.1 miles) to WI-100 4.5 to 59.6 Medium Right lane closed, up to two lanes open 8/4/15 7:30 PM to 8/5/15 5:30 AM WisDOT Construction - ROCK FREEWAY | HALE INTERCHANGE B-40-300-305,322 | I 43 | MILWAUKEE
US-45 (-0.1 miles) to WI-100 4.5 to 59.6 Major Left two lanes closed, up to one lanes open 8/3/15 7:30 PM to 8/4/15 5:30 AM WisDOT Construction - ROCK FREEWAY | HALE INTERCHANGE B-40-300-305,322 | I 43 | MILWAUKEE

WI-16 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Brown St (-0.5 miles) to Sawyer Rd (+0.2 miles) Medium Right lane closed, two lanes open 6/23/15 12:00 AM to 9/25/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
CR-JK (-0.1 miles) to CR-JK (+0.3 miles) Major Left lane closed, two lanes open 8/4/15 9:00 AM to 4:00 PM daily until 8/7/15 WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
Ryan St (-0.3 miles) to Ryan St (+0.2 miles) Major Left lane closed, two lanes open 8/4/15 9:00 AM to 4:00 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

WI-16 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ryan St (-0.3 miles) to Ryan St (+0.2 miles) Major Left lane closed, two lanes open 8/4/15 6:00 AM to 2:00 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
CR-JK (-0.3 miles) to CR-JK (+0.3 miles) Major Left lane closed, two lanes open 8/4/15 6:00 AM to 2:00 PM daily until 8/7/15 WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA
Sawyer Rd (-0.2 miles) to Brown St (+0.5 miles) Medium Right lane closed, two lanes open 6/23/15 12:00 AM to 9/25/15 11:45 PM WisDOT Construction - OCONOMOWOC - WAUKESHA | STH 67 - I 94 | STH 16 | WAUKESHA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue Aug 04 2015 04:39:23 CDT