Construction Report
Select Location
  
Updated: 9/2/14 11:28 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-39 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Richardson Springs Rd to Goede Rd 163.4 to 162.4 Medium Right lane closed, one lane open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - Detour: No posted detour
Buckeye Rd (+0.3 miles) to Cottage Grove Rd (-0.1 miles) 139.8 to 139.5 Medium Right lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 5:30 AM daily until 9/5/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 (+0.1 miles) to CR-V (-0.2 miles) 132.2 to 126.9 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
US-51 (+0.1 miles) to CR-V (-0.2 miles) 132.2 to 126.9 Medium Right lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-39 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V (-0.2 miles) to US-51 (-0.3 miles) 126.4 to 132.1 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
CR-V (-0.2 miles) to US-51 (-0.3 miles) 126.4 to 132.1 Medium Right lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
US-51 (+0.6 miles) to Hoepker Rd (+0.2 miles) 133.0 to 133.8 Medium Right lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
WI-30 to Milwaukee St (+0.1 miles) 138.0 to 138.4 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 5:30 AM WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
WI-30 to Milwaukee St (+0.1 miles) 138.0 to 138.4 Medium Left lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 12:00 AM WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
WI-106 to Goede Rd 159.2 to 162.5 Medium Left lane closed, one lane open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No posted detour
Goede Rd to Newville Rd (+0.1 miles) 162.5 to 165.2 Medium Left lane closed, one lane open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - Detour: No posted detour
at Ellendale Rd 163.6 Medium Left lane closed, one lane open 9/3/14 8:00 PM to 9/4/14 6:00 AM WisDOT Construction - Detour: No posted detour
Kennedy Rd to WI-26 170.2 to 170.8 Medium Left lane closed, one lane open 9/3/14 8:00 PM to 9/4/14 5:00 AM WisDOT Construction - Detour: No posted detour

I-43 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road D (-0.5 miles) to Bowers Rd (+0.3 miles) 32.3 to 33.6 Medium Left lane closed, one or two lanes open 9/2/14 6:00 AM to 9/4/14 5:00 AM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Miramar Rd (-0.4 miles) to Stone School Rd (+0.2 miles) 40.3 to 42.3 Medium Left lane closed, one lane open 8/28/14 5:00 AM to 9/30/14 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Stone School Rd to WI-83 42.3 to 43.8 Medium Left lane closed, one lane open 5/19/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Moorland Rd to 124th St 56.2 to 58.4 Medium Right lane closed, one lane open 9/3/14 9:00 AM to 4:00 PM WisDOT Maintenance - crack seal
Exit ramp to WB WI-36 8.1 Major All lanes and shoulders closed 9/3/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use alternate route
Oklahoma Ave (+0.3 miles) to Lapham Blvd 313.9 to 312.2 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
Lexington Blvd to County Line Rd 77.5 to 83.0 Medium Right lane closed, one or two lanes open 9/3/14 9:00 PM to 9/4/14 5:00 AM daily until 9/5/14 WisDOT Construction - IH 43 CORRIDOR STUDY
County Road Ll to Lake Dr 102.8 to 103.3 Medium Right lane closed, one lane open 9/3/14 7:00 AM to 5:00 PM daily until 9/4/14 WisDOT Construction - Detour: No Posted detour

I-43 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Lake Dr (+0.1 miles) to County Road Ll 103.3 to 102.9 Medium Left lane closed, one lane open 9/3/14 7:00 AM to 5:00 PM WisDOT Construction - Detour: No posted detour
County Line Rd to Silver Spring Dr 83.0 to 77.8 Medium Right lane closed, one or two lanes open 9/3/14 9:00 PM to 9/4/14 5:00 AM daily until 9/5/14 WisDOT Construction - IH 43 CORRIDOR STUDY
Greenfield Ave to WI-38 311.9 to 313.1 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
WI-83 to Stone School Rd 44.1 to 42.3 Medium Right lane closed, one lane open 5/19/14 12:00 AM to 11/7/14 11:45 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Entrance ramp from SB WI-83 43.5 Major All lanes and shoulders closed 5/19/14 12:00 AM to 11/10/14 11:45 PM WisDOT Construction - Detour: STH 83 go west on CTH L. Continue on CTH L to STH 20. Go right/west on STH 20. To continue onto IH 43 SB go left/south onto the ramp.
Stone School Rd (-0.1 miles) to Miramar Rd (+0.5 miles) 42.3 to 40.3 Medium Left lane closed, one lane open 8/26/14 5:00 AM to 9/30/14 3:00 PM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Miramar Rd (+0.5 miles) to WI-120 (-0.1 miles) 40.3 to 36.2 Medium Left lane closed, one or two lanes open 9/2/14 6:00 AM to 9/4/14 5:00 AM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH
Townline Rd (+0.7 miles) to County Road D (+0.5 miles) 34.3 to 32.3 Medium Left lane closed, one lane open 9/2/14 6:00 AM to 9/4/14 5:00 AM WisDOT Construction - ROCK FREEWAY SB | USH 12 - STH 83 | I 43 | WALWORTH

I-90 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V (-0.2 miles) to US-51 (-0.3 miles) 126.4 to 132.1 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
CR-V (-0.2 miles) to US-51 (-0.3 miles) 126.4 to 132.1 Medium Right lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
US-51 (+0.6 miles) to Hoepker Rd (+0.2 miles) 133.0 to 133.8 Medium Right lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
WI-30 to Milwaukee St (+0.1 miles) 138.0 to 138.4 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 5:30 AM WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
WI-30 to Milwaukee St (+0.1 miles) 138.0 to 138.4 Medium Left lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 12:00 AM WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
WI-106 to Goede Rd 159.2 to 162.5 Medium Left lane closed, one lane open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No posted detour
Goede Rd to Newville Rd (+0.1 miles) 162.5 to 165.2 Medium Left lane closed, one lane open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - Detour: No posted detour
at Ellendale Rd 163.6 Medium Left lane closed, one lane open 9/3/14 8:00 PM to 9/4/14 6:00 AM WisDOT Construction - Detour: No posted detour
Kennedy Rd to WI-26 170.2 to 170.8 Medium Left lane closed, one lane open 9/3/14 8:00 PM to 9/4/14 5:00 AM WisDOT Construction - Detour: No posted detour

I-90 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Richardson Springs Rd to Goede Rd 163.4 to 162.4 Medium Right lane closed, one lane open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - Detour: No posted detour
Buckeye Rd (+0.3 miles) to Cottage Grove Rd (-0.1 miles) 139.8 to 139.5 Medium Right lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 5:30 AM daily until 9/5/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 (+0.1 miles) to CR-V (-0.2 miles) 132.2 to 126.9 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
US-51 (+0.1 miles) to CR-V (-0.2 miles) 132.2 to 126.9 Medium Right lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V (-0.2 miles) to US-51 (-0.3 miles) 126.4 to 132.1 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
CR-V (-0.2 miles) to US-51 (-0.3 miles) 126.4 to 132.1 Medium Right lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
US-51 (+0.6 miles) to Hoepker Rd (+0.2 miles) 133.0 to 133.8 Medium Right lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Moorland Rd to WI-100 (+0.1 miles) 300.5 to 303.8 Major All lanes and shoulders closed 9/2/14 11:00 PM to 9/3/14 4:30 AM WisDOT Construction - Detour: I-94 EB to Moorland to Greenfield to I-894/US45 NB to I-94 EB
Entrance ramp from SB Moorland Rd 300.6 Medium All lanes and shoulders closed 9/2/14 11:00 PM to 9/3/14 4:30 AM WisDOT Construction - Detour: SB Moorland Traffic: Continue to Greenfield to I-894/US45 NB to I-94 EB; NB Moorland Traffic: Continue to Bluemound to 68th St to IH-94 EB;
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT **Long Term Closure** Construction - Detour: Follow Signed Detour
Entrance ramp from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Entrance ramp from WB I-894 304.6 Major All lanes closed 9/3/14 11:00 PM to 9/4/14 4:30 AM WisDOT Construction - Detour: Exit at Greenfield Avenue and head east to 70th street. Take 70th street north until you reach Kearney St. Take Kearney St east to merge onto I-94 EB. Alternately, exit Bluemound road and head east until you reach 70th street. Take
Entrance ramp from SB US-45 304.7 Major All lanes closed 9/3/14 11:00 PM to 9/4/14 4:30 AM WisDOT Construction - Detour: Exit at Greenfield Avenue and head east to 70th street. Take 70th street north until you reach Kearney St. Take Kearney St east to merge onto I-94 EB. Alternately, exit Bluemound road and head east until you reach 70th street. Take
Exit ramp to SB WI-181 305.1 Major Left lane closed, two lanes open 9/3/14 9:00 AM to 2:00 PM daily until 9/4/14 WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
WI-181 (-0.1 miles) to 76th St (+0.2 miles) 305.2 to 306.0 Medium Left lane closed, two lanes open 9/3/14 9:30 PM to 9/4/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
WI-181 (-0.1 miles) to 70th St (-0.2 miles) 305.2 to 306.1 Major All lanes closed 9/3/14 11:00 PM to 9/4/14 4:30 AM WisDOT Construction - Detour: Continue east on Kearney street until you merge back on to I-94 EB at 68th St.
Exit ramp to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/2/14 8:30 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/2/14 8:30 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Entrance ramp from General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/3/14 8:30 PM to 9/4/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NWB US-41 307.6 Major All lanes and shoulders closed 9/2/14 9:00 PM to 9/3/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NWB US-41 307.6 Major All lanes and shoulders closed 9/3/14 9:00 PM to 9/4/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Entrance ramp from SB US-41 308.0 Major All lanes and shoulders closed 9/3/14 9:00 PM to 9/4/14 5:30 AM WisDOT Construction - Detour: Continue straight to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward I-94 EB.
Greenfield Ave to WI-38 311.9 to 313.1 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit ramp to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Exit ramp to WB WI-50 343.6 Major All lanes closed and both shoulders open 9/3/14 8:00 AM to 2:00 PM WisDOT Maintenance - Beam guard repair

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Oklahoma Ave (+0.3 miles) to Lapham Blvd 313.9 to 312.2 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/2/14 9:00 PM to 9/3/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/3/14 9:00 PM to 9/4/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NB General Mitchell Blvd 307.5 Medium All lanes and shoulders closed 9/2/14 8:30 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to General Mitchell Blvd 307.5 Medium All lanes and shoulders closed 9/3/14 8:30 PM to 9/4/14 6:00 AM WisDOT Construction - Detour: No signed detour
70th St to WI-181 (-0.2 miles) 306.2 to 305.5 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
70th St to WI-181 (-0.2 miles) 306.2 to 305.5 Major Right two lanes closed, one lane open 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
Entrance ramp from SB US-45 304.2 Major All lanes and shoulders closed 9/2/14 11:00 PM to 9/3/14 4:30 AM WisDOT Construction - Detour: US45 SB to Wisconsin to Bluemound to Moorland to I-94 WB;
I-894 (+0.2 miles) to WI-100 (+0.1 miles) 304.1 to 303.6 Medium Right lane closed, one or two lanes open 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - ZOO IC, UPRR & STH 100 BRIDGES OVR I 94 | TERMINAL, CONST/BRIDGE REPLACEMENT | STH 100 | MILWAUKEE
I-894 (+0.2 miles) to WI-100 (+0.1 miles) 304.1 to 303.6 Major All lanes and shoulders closed 9/2/14 11:00 PM to 9/3/14 4:30 AM WisDOT Construction - Detour: I-94 WB to US45 NB to Bluemound to Moorland to I-94 WB;
I-894 (+0.2 miles) to WI-100 (+0.1 miles) 304.1 to 303.6 Medium Right lane closed, one or two lanes open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - ZOO IC, UPRR & STH 100 BRIDGES OVR I 94 | TERMINAL, CONST/BRIDGE REPLACEMENT | STH 100 | MILWAUKEE
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance ramp from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 (+0.1 miles) to CR-V (-0.2 miles) 132.2 to 126.9 Medium Left lane closed, two lanes open 9/2/14 8:00 PM to 9/3/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
US-51 (+0.1 miles) to CR-V (-0.2 miles) 132.2 to 126.9 Medium Right lane closed, two lanes open 9/3/14 8:00 PM to 9/4/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

I-794 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to Jackson ST 0.8 Medium All lanes and shoulders closed 1/4/14 12:00 AM to 11/30/14 11:45 PM WisDOT Construction - Detour: Jackson St. Entrance Ramp will reverse and become new Jackson/Van Buren exit ramp
Entrance ramp from SB Broadway 1.1 Medium All lanes and shoulders closed 1/4/14 12:00 AM to 11/30/14 11:45 PM WisDOT Construction - Detour: Traffic Detours to new Milwaukee St. Reversed Ramp
Entrance ramp from SWB Lincoln Memorial Dr 1.5 Medium All lanes and shoulders closed 11/4/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Michigan St. to Broadway to EB IH-794
Exit ramp to NWB Carferry Dr 3.0 Medium All lanes and shoulders closed 7/7/14 12:00 AM to 9/12/14 11:45 PM WisDOT Construction - Detour: Detour Howard Ave. to 794 NB to Carferry NB exit ramp.
Polk St (+0.4 miles) to Lincoln Memorial Dr (-0.1 miles) 2.0 to 3.1 Medium Right lane closed, two lanes open 9/2/14 7:00 PM to 9/3/14 6:00 AM WisDOT Construction - HOAN BRIDGE & LAKE FREEWAY | MILWAUKEE RIVER - CARFERRY DR | I 794 | MILWAUKEE

I-794 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB Milwaukee ST 13.5 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/15 11:45 PM WisDOT Construction - Detour: Downtown Traffic to Exit at Lincoln Memorial Drive
Entrance ramp from N Jackson St 13.8 Medium All lanes and shoulders closed 12/21/13 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - Detour: Detour on Clybourn St. to 2nd St. Ramp

I-894 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB WI-36 8.1 Major All lanes and shoulders closed 9/3/14 9:00 AM to 2:00 PM WisDOT Maintenance - Detour: Use alternate route

I-894 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-59 (-0.1 miles) to Schlinger Ave 1.2 to 0.5 Medium Right lane closed, one or two lanes open 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE

US-12 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from EB Old Sauk Rd Medium All lanes and shoulders closed 8/20/14 12:00 AM to 9/10/14 11:45 PM WisDOT Construction - Detour: Old Sauk Road to SB Junction Road to EB Mineral Point Road
Whitney Way (-0.1 miles) to US-18 Major All lanes closed and both shoulders open 9/2/14 10:00 PM to 9/3/14 5:00 AM daily until 9/6/14 WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Whitney Way to Seminole Hwy Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
Whitney Way (+0.2 miles) to US-18 Medium Right lane closed, one lane open 9/3/14 8:00 PM to 10:00 PM daily until 9/5/14 WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Raymond Rd to Seminole Hwy (-0.3 miles) Medium Right lane closed, up to two lanes open 8/4/14 12:00 AM to 11/28/14 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Raymond Rd to Seminole Hwy (+0.3 miles) Medium Right lane closed, up to two lanes open 8/4/14 12:00 AM to 11/28/14 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Todd Dr to I-39 Medium All lanes and shoulders open 7/1/14 7:00 AM to 11/15/14 11:59 PM Gateway Project website
Rimrock Rd (+0.6 miles) to Agriculture Dr (+0.3 miles) Medium Right lane closed, two lanes open 9/2/14 7:00 PM to 9/3/14 6:00 AM daily until 9/6/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Rimrock Rd (+0.6 miles) to Agriculture Dr (+0.3 miles) Major Right two lanes closed, one lane open 9/2/14 8:00 PM to 9/3/14 5:00 AM daily until 9/6/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE

US-12 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-39 to Todd Dr Medium Various lanes closed 7/1/14 7:00 AM to 11/15/14 11:59 PM Gateway Project website
I-39 (+0.3 miles) to Monona Dr (+0.7 miles) Medium Right two lanes closed, one or two lanes open 9/2/14 9:30 PM to 9/3/14 5:00 AM daily until 10/4/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
I-39 (+0.3 miles) to Rimrock Rd Medium Right lane closed, two or three lanes open 9/2/14 7:00 PM to 9/3/14 6:00 AM daily until 10/4/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Monona Dr (+0.7 miles) to Rimrock Rd Major Right two lanes closed, one lane open 9/2/14 8:30 PM to 9/3/14 5:00 AM daily until 10/4/14 WisDOT Construction - CITY MADISON, S MADISON BELTLINE | TODD DR - I 39/90 | USH 12 | DANE
Entrance ramp from WB US-14 Major All lanes and shoulders closed 8/9/14 12:00 AM to 9/6/14 11:45 PM WisDOT Construction - Detour: Take the USH 12 eastbound ramp (beltline), exit at Rimrock Road and turn left, turn left over the bridge to get back onto westbound USH 12 (beltline).
Raymond Rd to Seminole Hwy (+0.3 miles) Medium Right lane closed, up to two lanes open 8/4/14 12:00 AM to 11/28/14 11:45 PM WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Seminole Hwy to Whitney Way Medium Various lanes closed 6/25/13 7:00 AM to 12/31/15 11:59 PM Gateway Multi-year reconstruction project to improve Verona Road (US 18/151). For more information visit: http://projects.511wi.gov/web/veronaroad-18-151#
Seminole Hwy (+0.3 miles) to Whitney Way Major Right two lanes closed, up to one lanes open 9/2/14 10:00 PM to 9/3/14 5:00 AM daily until 9/6/14 WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Seminole Hwy (+0.3 miles) to Whitney Way Medium Right lane closed, one or two lanes open 9/3/14 8:00 PM to 10:00 PM daily until 9/5/14 WisDOT Construction - MOUNT HOREB - MADISON | RAYMOND RD - MADISON BELTLINE | USH 18 | DANE
Exit ramp to Whitney Way Medium All lanes and shoulders closed 9/2/14 10:00 PM to 9/3/14 5:00 AM daily until 9/6/14 WisDOT Construction - Detour: Use WB US 12 to Gammon Rd exit. Take Gammon Rd to EB US 12 on ramp.
Entrance ramp from SB Whitney Way Medium All lanes and shoulders closed 9/2/14 10:00 PM to 9/3/14 5:00 AM daily until 9/6/14 WisDOT Construction - Detour: Take WB US 12 on ramp to Gammon Rd exit. Use Gammon Rd to EB US 12 on ramp.

US-41 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Entrance ramp from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Oklahoma Ave (+0.3 miles) to Lapham Blvd 313.9 to 312.2 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/2/14 9:00 PM to 9/3/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/3/14 9:00 PM to 9/4/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
US-18 (-0.1 miles) to Wells St (+0.1 miles) Major Left two lanes closed, one lane open 9/2/14 9:00 PM to 9/3/14 5:30 AM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
US-18 (-0.1 miles) to Wells St (+0.1 miles) Major Left two lanes closed, one lane open 9/3/14 9:00 PM to 9/4/14 5:30 AM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
US-18 (-0.1 miles) to State St (+0.1 miles) Major Left lane closed, two lanes open 7/26/14 12:00 AM to 10/20/14 11:45 PM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
Congress St to 91st St Major Right two lanes closed, one lane open 8/20/14 12:00 AM to 10/3/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
91st St to 107th St Major All lanes and shoulders closed 8/4/14 12:00 AM to 9/30/14 11:45 PM WisDOT Construction - Detour: Stage 3 - Traffic Pattern. NB traffic will use crossover, north of 91st, and utilize lane 1 of the SB side. NB traffic is then put back into the NB side north of 107th through another crossover.
Cedar Creek Rd to CR-K (-0.4 miles) Medium Right lane closed, one lane open 9/3/14 6:00 AM to 3:00 PM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
Exit ramp to NEB WI-144 Major All lanes and shoulders closed 7/21/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 North to WIS 60 West to WIS 144 N
Entrance ramp from SWB WI-144 Major All lanes and shoulders closed 4/25/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 east to US 41

US-41 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-K (+0.2 miles) to Cedar Creek Rd Medium Right lane closed, one lane open 9/3/14 9:00 AM to 6:00 PM WisDOT Construction - USH 41 FREEWAY MODERNIZATION | STH 144 INTERCHANGE | USH 41 | WASHINGTON
Exit ramp to SWB WI-144 Major All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: US 41 South to WIS 60 West to WIS 144 north
Entrance ramp from WI-144 Medium All lanes and shoulders closed 5/8/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: WIS 144 south to WIS 60 East to US 41 south
91st St to Congress St Major Right two lanes closed, one lane open 8/26/14 12:00 AM to 10/3/14 11:45 PM WisDOT Construction - APPLETON AVE - CITY MILWAUKEE | STH 181 - USH 45 | USH 41 | MILWAUKEE
Highland Blvd to US-18 Major Left two lanes closed, one lane open 9/3/14 8:00 PM to 9/4/14 6:00 AM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
Highland Blvd to Miller Park Way Major Left lane closed, two lanes open 7/25/14 12:00 AM to 10/20/14 11:45 PM WisDOT Construction - STADIUM FREEWAY | BREWER STADIUM - STATE ST | USH 41 | MILWAUKEE
Entrance ramp from WB Wisconsin Ave Medium All lanes and shoulders closed 2/24/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Advanced FMS signs stating to use alternate route to SB 41 at Hawley Rd, 35th St, and 46th ST.
Exit ramp to EB I-94 308.0 Major All lanes and shoulders closed 9/3/14 9:00 PM to 9/4/14 5:30 AM WisDOT Construction - Detour: Continue straight to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward I-94 EB.
Greenfield Ave to WI-38 311.9 to 313.1 Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM daily until 9/5/14 WisDOT Construction - I 43 NORTH SOUTH | HOWARD AVE - THE VALLEY BRIDGE | I 43/I 94 | MILWAUKEE
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit ramp to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Exit ramp to WB WI-50 343.6 Major All lanes closed and both shoulders open 9/3/14 8:00 AM to 2:00 PM WisDOT Maintenance - Beam guard repair

US-45 NB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
WI-59 (-0.1 miles) to Schlinger Ave 1.2 to 0.5 Medium Right lane closed, one or two lanes open 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
Entrance ramp from WB WI-59 0.8 Major All lanes and shoulders closed 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - Detour: Head east on Greenfield avenue until you reach 84th street. Take 84th street north until you reach O'Connor street. Enter I-94 WB from 84th street at O'Connor St. Stay in your lane until you merge onto I894/US45 NB.
Exit ramp to WB I-94 0.5 Major All lanes and shoulders closed 9/2/14 11:00 PM to 9/3/14 4:30 AM WisDOT Construction - Detour: I-894/US45 NB to Greenfield to Moorland to I-94 WB
Exit ramp to EB I-94 0.4 Major All lanes closed 9/3/14 11:00 PM to 9/4/14 4:30 AM WisDOT Construction - Detour: Exit at Greenfield Avenue and head east to 70th street. Take 70th street north until you reach Kearney St. Take Kearney St east to merge onto I-94 EB. Alternately, exit Bluemound road and head east until you reach 70th street. Take
Exit ramp to EB Watertown Plank Rd Medium All lanes and shoulders closed 1/5/14 12:00 AM to 10/1/14 11:45 PM WisDOT Construction - Detour: I-94 WB to 84th St to Watertown Plank Rd.
Watertown Plank Rd to Underwood Pky (-0.4 miles) Major Right two lanes closed, one lane open 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - ZOO IC, WATERTOWN PLANK INTERCHANGE | WISCONSIN AVE - UNDERWOOD PKWY | USH 45 | MILWAUKEE
Watertown Plank Rd to Underwood Pky (-0.4 miles) Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM WisDOT Construction - ZOO IC, WATERTOWN PLANK INTERCHANGE | WISCONSIN AVE - UNDERWOOD PKWY | USH 45 | MILWAUKEE
Entrance ramp from WB Watertown Plank Rd Medium All lanes and shoulders closed 1/5/14 12:00 AM to 9/26/14 11:45 PM WisDOT Construction - Detour: Watertown Plank to HWY 100 to North Ave to USH 45 NB
Exit ramp to EB Capitol Dr Medium Left lane closed, two lanes open 9/3/14 9:00 AM to 2:00 PM WisDOT Maintenance - Bridge repair
Entrance ramp from WB Capitol Dr Minor All lanes and shoulders open 9/3/14 9:00 AM to 2:00 PM WisDOT Maintenance - Bridge repair

US-45 SB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
Underwood Pky (+0.3 miles) to Watertown Plank Rd (-0.2 miles) Major Left two lanes closed, one lane open 9/3/14 9:30 PM to 9/4/14 5:30 AM WisDOT Construction - ZOO IC, WATERTOWN PLANK INTERCHANGE | WISCONSIN AVE - UNDERWOOD PKWY | USH 45 | MILWAUKEE
Entrance ramp from Watertown Plank Rd Medium All lanes and shoulders closed 1/5/14 12:00 AM to 11/15/14 11:45 PM WisDOT Construction - Detour: Watertown Plank to HWY 100 to Bluemound to 97th St to Wisconsin to USH 45 SB
Exit ramp to EB I-94 Major All lanes closed 9/3/14 11:00 PM to 9/4/14 4:30 AM WisDOT Construction - Detour: Exit at Greenfield Avenue and head east to 70th street. Take 70th street north until you reach Kearney St. Take Kearney St east to merge onto I-94 EB. Alternately, exit Bluemound road and head east until you reach 70th street. Take
Exit ramp to WB I-94 0.1 Major All lanes and shoulders closed 9/2/14 11:00 PM to 9/3/14 4:30 AM WisDOT Construction - Detour: US45 SB to Wisconsin to Bluemound to Moorland to I-94 WB;

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Tue Sep 02 23:33:08 CDT 2014