NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
I-94 EB (Regional)
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| WI-19 to Lien Rd
|
130.7 to 136.8 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| Canal St to Lapham Blvd
|
|
Medium |
Right lane closed, two lanes open |
05/08/13 12:00 AM to 08/27/13 11:45 PM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| Exit to Lapham Blvd
|
311.7 |
Medium |
All lanes and shoulders closed |
06/18/13 12:00 AM to 07/08/13 11:45 PM |
WisDOT |
Construction - Detour: Use alt route (Becher exit) |
| Lapham Blvd to Howard Ave
|
312.2 to 314.9 |
Medium |
Various lanes closed |
02/14/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Single Lane Closure |
| Exit to Holt Ave
|
314.0 |
Medium |
All lanes and shoulders closed |
02/15/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Construction - Detour: Continue south on I-43 to Howard Ave exit. Exit to EB Howard Ave. East on Howard to Howell St, north on Howell St to Holt. |
| Entrance from National/6th St
|
|
Medium |
All lanes and shoulders closed |
05/06/13 12:00 AM to 08/27/13 11:45 PM |
WisDOT |
Construction - Detour: Use south 6th St to freeway entrance via 5th St |
| I-94 EB to I-43 SB/I-94 EB
|
316.3 |
Medium |
Right lane closed, one lane open |
05/05/13 12:00 AM to 08/27/13 11:45 PM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| College Ave to Rawson Ave
|
318.7 to 319.9 |
Medium |
Left lane closed, two lanes open |
06/19/13 09:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - N-S FREEWAY, RAWSON AVE INTERCHANGE | RAWSON AVE & RAMPS | I 94 | MILWAUKEE |
| Exit to Rawson AVE
|
319.3 |
Medium |
All lanes and shoulders closed |
06/15/13 12:00 AM to 10/31/13 11:45 PM |
WisDOT |
Construction - Detour: SB traffic routed to College or Drexel |
| Entrance from Rawson Ave
|
320.2 |
Medium |
All lanes and shoulders closed |
03/11/13 12:00 AM to 10/31/13 11:45 PM |
WisDOT |
Construction - Detour: Interchange detours will be using 27th St, Howell Ave, College Ave, and Drexel Ave |
| 7 Mile Rd to WI-20
|
324.9 to 333.3 |
Medium |
Various lanes closed |
06/20/13 09:00 AM to 02:30 PM daily until 06/21/13 |
WisDOT |
Moving Lane Closure; Maintenance - Pavement Repair |
| 1st St to 12th St
|
337.0 to 339.0 |
Medium |
Right lane closed, two lanes open |
06/17/13 12:00 AM to 06/20/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| 1st St to 12th St
|
337.0 to 339.0 |
Major |
Right two lanes closed, one lane open |
06/19/13 08:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| 12th St to WI-158
|
339.0 to 342.2 |
Medium |
Various lanes closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| WI-142 to CR-N
|
340.7 to 341.5 |
Medium |
Left lane closed, two lanes open |
03/24/13 08:00 AM to 09/30/13 11:59 PM |
WisDOT |
|
| WI-142 to CR-N
|
340.7 to 341.5 |
Major |
Left two lanes closed, one lane open |
03/24/13 08:00 AM to 09/30/13 11:59 PM |
WisDOT |
|
| WI-158 to Wilmot Rd
|
342.2 to 344.9 |
Major |
Left two lanes closed, one lane open |
03/23/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 50 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| Exit to EB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure** |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| Three Oaks Rd to I-94-Br
|
10.3 to 23.3 |
Medium |
Various lanes closed |
05/05/13 07:00 AM to 08/26/13 07:00 PM |
MDOT |
Bridge Repair; Single Lane Closure; Traffic Shift |
| 54th St (+0.2 miles) to 50th St (-0.4 miles)
|
51.0 to 52.3 |
Medium |
Various lanes closed |
06/19/13 08:00 AM to 05:00 PM |
MDOT |
Single lane closure |
I-94 WB (Regional)
| at 54th St (-0.3 miles)
|
51.0 |
Medium |
Various lanes closed |
06/19/13 08:00 AM to 05:00 PM |
MDOT |
Single lane closure |
| Entrance from M-63
|
26.9 |
Minor |
Ramp work, possible width reduction |
06/20/13 08:00 AM to 05:00 PM |
MDOT |
Erosion, Drainage, Ditch Work |
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
| Exit to WB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** |
| at Waukegan Plaza
|
4.8 |
Medium |
Various lanes closed |
06/19/13 11:00 PM to 06/20/13 05:00 AM |
Illinois Tollway |
ORT Maintenance; All ORT Lanes Closed |
| WI-165 to WI-158
|
346.6 to 342.3 |
Medium |
Various lanes closed |
04/06/13 12:00 AM to 07/20/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 50 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| Entrance from WI-50
|
343.0 |
Medium |
All lanes and shoulders closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - Detour: Take STH 50 to 125th Street. Turn left on 125th Street. Continue to 77th Street. Turn left on 77th Street. Continue to WFR. Turn right on WFR. Continue to CTH C. Turn left on CTH C. Continue to CTH C SE ramp. |
| Exit to WI-158
|
343.0 |
Major |
All lanes and shoulders closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - Detour: Continue to 142 SE ramp. Take 142 SE ramp. Turn left onto STH 142. Continue to WFR. Take WFR to STH 158. Turn left onto STH 158. |
| WI-158 to 12th St
|
342.3 to 339.2 |
Medium |
Various lanes closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| CR-N to WI-142
|
341.5 to 340.7 |
Medium |
Left lane closed, two lanes open |
03/23/13 08:00 AM to 09/30/13 11:59 AM |
WisDOT |
|
| at WI-142
|
340.7 |
Medium |
Left lane closed, two lanes open |
03/22/13 09:30 PM to 10/31/13 11:00 PM |
WisDOT |
***Long Term Closure***; Two lanes will be open to traffic in this section through the year. |
| WI-142 to 1st St
|
340.4 to 336.9 |
Medium |
Right lane closed, two lanes open |
06/17/13 12:00 AM to 06/27/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| WI-142 to 1st St
|
340.4 to 336.9 |
Major |
Right two lanes closed, one lane open |
06/19/13 08:30 PM to 06/20/13 05:30 AM daily until 06/20/13 |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| Drexel Ave to Rawson Ave
|
320.6 to 319.4 |
Medium |
Left lane closed, two lanes open |
06/19/13 09:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - N-S FREEWAY, RAWSON AVE INTERCHANGE | RAWSON AVE & RAMPS | I 94 | MILWAUKEE |
| Entrance from CR-BB
|
319.0 |
Medium |
All lanes and shoulders closed |
03/11/13 12:00 AM to 10/31/13 11:45 PM |
WisDOT |
Construction - Detour: NB loop ramp is closed. Detour will be provided |
| Entrance from Rawson AVE
|
319.0 |
Medium |
All lanes and shoulders closed |
05/13/13 12:00 AM to 09/20/13 11:45 PM |
WisDOT |
Construction - Detour: Signed detour will be posted |
| Howard Ave to 6th St
|
315.0 to 311.7 |
Major |
Left two lanes closed, one or two lanes open |
06/19/13 09:00 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| Howard Ave to Canal St
|
315.0 to 310.9 |
Medium |
Various lanes closed |
02/12/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Single Lane Closure |
| Entrance from Holt Ave
|
313.0 |
Medium |
All lanes and shoulders closed |
02/12/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Construction - Detour: EB Holt to NB Chase to NB 1st St to WB Lincoln Ave to NB 4th St to B 43 via Becher St entrance ramp. |
| Exit to WB I-94
|
310.9 |
Major |
All lanes and shoulders closed |
06/19/13 09:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - Detour: From I-43 exit to Layton Ave. From Layton Ave. turn north on STH 100. From STH 100 turn east on W.National Ave. From W.National Ave. enter IH 894. |
| Exit to NB WI-100
|
303.8 |
Major |
All lanes and shoulders closed |
04/06/13 12:00 AM to 08/10/13 11:45 PM |
WisDOT |
Construction - Detour: Use 45 North to Bluemound Ave./ exit 39. Take a right onto WB Bluemound Ave. and continue to HWY 100/ Mayfair Road. |
| Milwaukee St to US-51
|
138.5 to 132.2 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |