Construction Report
Select Location
  
Updated: 9/1/14 11:00 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Various lanes closed 9/2/14 9:00 PM to 9/3/14 6:00 AM daily until 9/5/14 WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
at WI-100/108th St 303.7 Major All lanes and shoulders closed 12/9/13 12:00 AM to 11/24/14 11:45 PM WisDOT **Long Term Closure** Construction - Detour: Follow Signed Detour
Entrance ramp from WI-100 303.5 Medium All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Northbound HWY 100 continue north on HWY 100, right/east on Bluemound Rd, right/south on 76th St, left/east on Kearney St, continue to IH 94 EB on ramp; Southbound HWY 100 continue to Greenfield Ave, left/east at Greenfield Ave, co
Exit ramp to SB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/2/14 8:30 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 9/2/14 8:30 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
Exit ramp to NWB US-41 307.6 Major All lanes and shoulders closed 9/2/14 9:00 PM to 9/3/14 5:30 AM WisDOT Construction - Detour: Exit right/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NWB WI-100 322.4 Major All lanes and shoulders closed 3/4/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: IH 94 EB exit at Moorland Rd. If wanting to go SB on HWY 100 go right/south on Moorland Rd, left/east on Greenfield Ave, continue on Greenfield Ave to HWY 100. If wanting to go NB on HWY 100 go left/north on Moorland Rd, right/east on Bluemond Rd, continue on Bluemound to HWY 100.
50th Rd to 58th Rd 331.7 to 334.0 Medium Left lane closed, two lanes open 4/24/14 12:00 AM to 11/25/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
50th Rd to 58th Rd 331.9 to 334.9 Medium Left lane closed, two lanes open 5/21/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
12th St to WI-158 339.0 to 342.4 Medium Various lanes closed 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Exit ramp to WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: Off-Ramp from 94E to 71st St to 125th Ave to STH 50.
Exit ramp to WB IL-132 8.1 Major All lanes and shoulders closed 7/30/14 7:00 AM to 9/3/14 11:59 PM Illinois Tollway Exit Ramp Closed: *** Long Term Closure ***
Entrance ramp from EB IL-132 8.1 Minor Partial closure 7/30/14 8:00 AM to 9/1/14 11:59 PM Illinois Tollway *** Long Term Closure ***; Left Side of Ramp Closed
Clavey Rd to Tower Rd 25.3 to 31.7 Major Left and right lanes and both shoulders closed, up to one lanes open with partial ramp closures 9/2/14 10:00 AM to 2:00 PM IDOT Moving Operation
Clavey Rd to Tower Rd 25.3 to 31.7 Minor Both shoulders closed, all lanes open with partial ramp closures 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Winnetka Ave to Kennedy Junction 33.4 to 43.5 Major Left and right lanes and both shoulders closed, one lane open with partial ramp closures 9/2/14 10:00 AM to 2:00 PM IDOT Moving Operation
Winnetka Ave to Kennedy Junction 33.4 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Harlem Ave (IL-43) to Eisenhower Expy (I-290) 81.2 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
at Grand Ave 50.5 Minor Right shoulder closed, all lanes open 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 9/1/14 11:59 PM IDOT Bridge Reconstruction; 11' Width; *** Long Term Closure ***
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane closed, up to two lanes open 6/21/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***; 11' Width
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***; 11' Width
0.5 miles north of 95th St (US-12/20) to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor Right shoulder closed, all lanes open 8/20/14 12:00 AM to 11/25/14 11:59 PM IDOT ***Long Term Closure***
Exit ramp to 103rd St 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 9/15/14 11:59 PM IDOT *** Long Term Closure ***; All traffic will detour to I-94 SB & 111th street overpass.
Exit ramp to NB Stony Island Feeder 64.2 Medium All lanes and shoulders closed 4/5/14 8:00 AM to 9/15/14 11:59 PM IDOT All traffic for NB Stony Island will detour to I-94 & 111th street overpass. *** Long Term Closure ***
Entrance ramp from 103rd St (SB Stony Island Feeder) 65.6 Minor Partial closure 9/2/14 9:00 AM to 3:00 PM IDOT
115th St to I-80 66.6 to 74.4 Major Left two lanes and left shoulder closed, up to two lanes open 9/2/14 9:00 AM to 11:59 AM IDOT Moving Operation
at Clay St (+0.1 miles) 13.0 Medium Right lane closed, four lanes open 8/18/14 8:09 AM to 9/17/14 8:09 AM InDOT Construction work
Three Oaks Rd to I-196 10.3 to 34.1 Medium Various lanes closed 8/18/14 6:00 PM to 10/31/14 11:59 PM MDOT Nighttime lane closures for resurfacing; Watch for workers and equipment.

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-196 to Three Oaks Rd 34.1 to 10.3 Medium All lanes and shoulders open 8/18/14 6:00 PM to 10/31/14 11:59 PM MDOT Nighttime lane closures for resurfacing; Watch for workers and equipment.
Exit ramp to EB I-80 Minor All lanes and shoulders open 6/30/14 7:00 AM to 9/14/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' Width restriction only; **Long Term**
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015.
Entrance ramp from EB I-90 15.3 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp to I-94 closed through 11/26/14; Ramp Demo/Rebuild.; Detour in place.
I-80 to 115th St 74.5 to 66.6 Major Left two lanes and left shoulder closed, up to one lanes open 9/2/14 10:00 AM to 12:30 PM IDOT Moving Operation
Exit ramp to 103rd St 65.7 Minor Partial closure 9/2/14 9:00 AM to 3:00 PM IDOT
Bishop Ford Fwy (I-94) to 103rd St 65.7 Minor Right shoulder closed, all lanes open 9/2/14 9:00 AM to 3:00 PM IDOT
103rd St to SB Stony Island Feeder Entrance 65.0 to 64.4 Minor Right shoulder closed, all lanes open 9/2/14 9:00 AM to 3:00 PM IDOT
I-57 / Bishop Ford (I-94) to 0.5 miles north of 95th St (US-12/20) 62.9 to 62.3 Minor Right shoulder closed, all lanes open 8/20/14 12:00 AM to 11/25/14 11:59 PM IDOT ***Long Term Closure***
I-57 / Bishop Ford (I-94) to 69th St 62.9 to 59.6 Minor Both shoulders closed, all lanes open 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to Harlem Ave (IL-43) 51.7 to 81.2 Minor Both shoulders closed, all lanes open with partial ramp closures 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower/I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***; 11 ' Width
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
at Damen Ave 47.8 Minor Right shoulder closed, all lanes open 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Kennedy Junction to Winnetka Ave 43.5 to 33.5 Major Left and right lanes and both shoulders closed, one lane open with partial ramp closures 9/2/14 9:30 AM to 1:30 PM IDOT Moving Operation
Kennedy Junction to Winnetka Ave 43.5 to 33.5 Minor Both shoulders closed, all lanes open with partial ramp closures 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Tower Rd to Clavey Rd 31.8 to 25.3 Major Left and right lanes and both shoulders closed, up to two lanes open with partial ramp closures 9/2/14 9:30 AM to 1:30 PM IDOT Moving Operation
Tower Rd to Clavey Rd 31.8 to 25.3 Minor Both shoulders closed, all lanes open with partial ramp closures 9/2/14 9:00 AM to 3:00 PM IDOT Moving Operation
Stearns School Rd (+1.2 miles) to Wadsworth Rd (-0.6 miles) 6.4 to 5.7 Medium Right lane closed, three lanes open 9/2/14 9:00 AM to 2:00 PM Illinois Tollway Pavement Repair
Entrance ramp from WB WI-50 343.6 Major All lanes closed 7/18/14 12:00 AM to 10/15/14 11:45 PM WisDOT Construction - Detour: 118th Ave to 71st St to 94W On-Ramp.
60th St to 12th St 342.7 to 339.2 Major Left two lanes closed, one lane open 4/7/14 12:00 AM to 11/1/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA
Old Highway 11 (+0.7 miles) to 50th Rd (-0.2 miles) 334.2 to 332.1 Medium Right lane closed, two lanes open 5/29/14 12:00 AM to 11/26/14 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to NB 9th St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Use Becher St exit and follow 4th St detour signs.
Entrance ramp from EB Walker St 311.7 Medium All lanes and shoulders closed 9/2/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Follow posted detour to EB National Ave and SB 6th St. Use entrance ramp at 6th & Mineral St.
Exit ramp to NWB US-41 307.9 Major All lanes and shoulders closed 9/2/14 9:00 PM to 9/3/14 5:30 AM WisDOT Construction - Detour: Exit left/south to SB41, exit right/west toward Canal St, go right/east on Frederick Miller Way, go right/south toward NB41/I-94, continue on NB41
Exit ramp to NB General Mitchell Blvd 307.5 Medium All lanes and shoulders closed 9/2/14 8:30 PM to 9/3/14 6:00 AM WisDOT Construction - Detour: No signed detour
70th St to WI-181 (-0.2 miles) 306.2 to 305.5 Major Right two lanes closed, one lane open 9/2/14 9:30 PM to 9/3/14 5:30 AM WisDOT Construction - ZOO IC, S 76TH ST BRIDGE OVER I94 | KEARNEY ST - O'CONNOR ST | LOC ST | MILWAUKEE
Exit ramp to NB WI-100 303.8 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, continue to HWY 100; Westbound IH 94 take US 45 north system ramp, Exit at Bluemound Rd, right/west on Bluemound Rd, continue to HWY 100;
Exit ramp to SEB WI-100 303.7 Major All lanes and shoulders closed 12/6/13 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: Southbound US 45 exit at Wisconsin Ave, straight/south on 97th St, right/west on Bluemound Rd, left/south on HWY 100; Westbound IH 94 exit at 84th St, left/south on 84th St, right/west on Greenfield Ave, continue to HWY 100;
Entrance ramp from WI-100 303.4 Minor All lanes and shoulders closed 4/27/14 12:00 AM to 10/31/14 11:45 PM WisDOT Construction - Detour: STH 100 NB Traffic: Left/West on Bluemound Rd, Left/South on Moorland Rd, Right/West at IH-94 WB Entrance Ramp; STH 100 SB Traffic: Right/West on Greenfield Ave, Right/North on Moorland Rd, Left/West at IH-94 WB Entrance Ramp;

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Mon Sep 01 23:12:36 CDT 2014