Construction Report
Select Location
  
Updated: 4/1/15 11:21 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
WI-100 (-0.2 miles) to I-894 303.5 to 304.3 Major All lanes and shoulders closed 4/1/15 10:00 PM to 4/2/15 5:00 AM WisDOT Construction - Detour: Take I-94 EB to HWY 100 to Greenfield to US 45 North to I-94 EB. OR Take I-94 EB to HWY 100 to Watertown Plank to US45 NB.
Canal St to National/WI-59 310.9 to 311.5 Minor Right shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
Ramp from SB I-43 to National Ave 311.3 Minor Left shoulder closed, all lanes open 3/24/15 9:00 AM to 5/15/15 11:59 PM WisDOT Long term closure until mid May 2015; *** Long Term Closure ***
National Ave/WI-59 to Greenfield Ave 311.5 to 312.0 Major Left two lanes and right shoulder closed, one lane open 4/1/15 9:30 PM to 4/2/15 5:30 AM WisDOT
Exit ramp to WB Becher St 312.2 Medium All lanes and shoulders closed 4/1/15 9:00 PM to 4/2/15 5:30 AM WisDOT
Entrance ramp from EB Becher St 312.2 Medium All lanes and shoulders closed 4/1/15 9:00 PM to 4/2/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from Lapham Blvd 312.2 Medium All lanes and shoulders closed 4/1/15 9:00 PM to 4/2/15 5:30 AM WisDOT Construction - Detour: Use alt route (Holt Ave entrance)
Entrance ramp from SEB WI-100 323.1 Major All lanes and shoulders closed 3/23/15 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take HWY 100 South to Greenfield to I-894/US45 North to 94 East. OR Take HWY 100 North to Watertown Plank to Glenview to I-94 East
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***
Entrance ramp from WB IL-132 8.3 Minor Right lane closed, one lane open 3/9/15 12:00 AM to 5/1/15 12:00 AM Illinois Tollway Rdwy Reconst. and Plaza Repairs; Right Side Ramp closed; ***Long Term Closure***
Entrance ramp from EB IL-132 8.1 Minor Partial closure 3/6/15 7:00 AM to 5/1/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Park Ave West to Kennedy Junction 23.1 to 43.5 Minor Both shoulders closed, all lanes open with partial ramp closures 4/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane and left shoulder closed, three or four lanes open 4/2/15 10:00 AM to 1:00 PM IDOT Moving Operation
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 4/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Ohio Feeder to Eisenhower Expy (I-290) 50.3 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open 4/2/15 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 10:00 AM to 1:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
26th St to 0.5 miles north of Chicago Skwy (I-90) 54.1 to 58.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 9:00 AM to 1:30 PM IDOT Moving Operation
Garfield Blvd (55th St) to 59th St 57.7 to 58.2 Minor Left lane and left shoulder closed, two lanes open 4/1/15 9:00 PM to 4/2/15 5:00 AM IDOT Vacate lane for Express traffic
63rd St to Wentworth Ave 58.7 to 58.9 Medium Left lane and left shoulder closed, one to three lanes open 3/31/15 12:00 AM to 8/31/15 11:59 PM IDOT Long Term Closure
at Wentworth Ave 58.9 Minor Right shoulder closed, all lanes open 3/20/15 12:00 AM to 6/1/15 11:59 PM IDOT ***Long Term Closure***
91st St to 95th St (US-12/20) 62.3 to 62.8 Major Right two lanes and right shoulder closed, three lanes open 4/1/15 11:00 PM to 4/2/15 6:00 AM IDOT
91st St to I-57 / Bishop Ford (I-94) 62.3 to 62.9 Minor All lanes shifted and both shoulders closed 9/9/14 12:00 AM to 7/7/15 11:59 PM IDOT Lanes narrowed and weaved to the left ***Long Term Closure***
Dan Ryan Expy (I-94) / I-57 to SB Stony Island Feeder Entrance 62.9 to 65.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 9:00 AM to 11:59 AM IDOT Moving Operation
SB Stony Island Feeder Entrance to I-80 65.6 to 74.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 8:30 AM to 12:30 PM IDOT Moving Operation
Bishop Ford Fwy (IL-394) to IN State Line Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 9:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to SB Sprinkle Rd 79.2 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Exit ramp to SB Sprinkle Rd 79.2 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from SB Sprinkle Rd 79.5 Medium All lanes and shoulders open 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from NB Sprinkle Rd 79.8 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from NB Sprinkle Rd 79.8 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Climax And Battle Creek Rd (-0.1 miles) to I-69 92.0 to 108.2 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT

I-94 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 9:00 AM to 1:30 PM IDOT Moving Operation
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Medium Left two lanes and left shoulder closed, one or two lanes open 4/1/15 11:00 PM to 4/2/15 1:00 AM IDOT
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Medium Left three lanes and left shoulder closed, up to one lanes open 4/2/15 1:00 AM to 5:00 AM IDOT Full Express Closure
Garfield Blvd (55th St) to Chicago Skwy (I-90) 57.7 to 59.1 Minor Left lane and left shoulder closed, two or three lanes open 4/1/15 9:00 PM to 4/2/15 5:00 AM IDOT

I-94 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 10:00 AM to 3:00 PM IDOT Moving Operation

I-94 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
I-69 to Climax And Battle Creek Rd (+0.1 miles) 108.2 to 92.0 Medium Various lanes closed 3/20/15 1:00 PM to 11/28/15 1:00 PM MDOT
Exit ramp to EB Cork St 80.0 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Exit ramp to Cork St 80.0 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
at Cork St 79.9 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from NB Sprinkle Rd 79.7 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from SB Sprinkle Rd 79.4 Medium Various lanes closed 3/16/15 7:00 AM to 11/15/15 7:00 PM MDOT Bridge Reconstruction
Entrance ramp from SB Sprinkle Rd 79.4 Medium All lanes and shoulders closed 3/16/15 6:00 AM to 11/30/15 5:00 PM MDOT Bridge Work; Sprinkle Road will have one lane open in each direction between Cork Street and MidLink Drive during construction, expect delays.
More information
Entrance ramp from WB I-80 15.3 Major All lanes and shoulders closed 3/18/15 7:00 AM to 4/5/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild ***Long Term***
at Colfax St (-0.1 miles) 6.0 None 4/1/15 11:18 PM to 4/2/15 1:18 AM InDOT Maintenance work
IN State Line to Bishop Ford Fwy (IL-394) Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 9:30 AM to 2:30 PM IDOT Moving Operation
I-80 to NB Stony Island Feeder Exit 74.5 to 65.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 10:00 AM to 2:00 PM IDOT Moving Operation
NB Stony Island Feeder Exit to Dan Ryan Expy (I-94) / I-57 65.7 to 62.9 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 10:30 AM to 1:00 PM IDOT Moving Operation
Dr Martin L King Jr Dr to Dan Ryan Expy (I-94) / I-57 63.7 to 62.9 Minor Right lane and right shoulder closed, one lane open 4/1/15 11:00 PM to 4/2/15 5:00 AM IDOT
Entrance ramp from Michigan Ave Medium All lanes and shoulders closed 4/1/15 11:00 PM to 4/2/15 5:00 AM IDOT
I-57 / Bishop Ford (I-94) to 91st St 62.9 to 62.3 Medium Right two lanes and right shoulder closed, three lanes open 4/1/15 11:00 PM to 4/2/15 5:00 AM IDOT
Entrance ramp from 95th St Medium All lanes and shoulders closed 4/1/15 9:00 PM to 4/2/15 5:00 AM IDOT
71st St to 69th St 59.8 to 59.6 Minor Right lane and right shoulder closed, one to four lanes open 4/1/15 10:00 PM to 4/2/15 5:00 AM IDOT
Marquette Rd (67th St) to 26th St 59.3 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 10:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from 69th St 59.3 Medium All lanes and shoulders closed 4/1/15 8:00 PM to 4/2/15 5:00 AM IDOT
Chicago Skwy (I-90) to 63rd St 59.1 to 58.7 Medium Right two lanes and right shoulder closed, up to one lanes open 4/1/15 10:00 PM to 4/2/15 5:00 AM IDOT Weave traffic from Local Lane 1 to Local Lane 3.
Ramp from NB Chicago Skyway to NB Dan Ryan Local (I-94) 58.8 Major All lanes and shoulders closed 4/1/15 8:00 PM to 4/2/15 5:00 AM IDOT
26th St to Stevenson Expy (I-55) 54.1 to 53.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 4/2/15 10:00 AM to 1:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to EB I-290 52.4 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 52.4 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 6/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section. ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from Taylor St 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Ohio Feeder 51.7 to 50.4 Medium Left lane and left shoulder closed, two to four lanes open 4/2/15 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 4/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower / I-290 51.4 Major All lanes and shoulders closed 4/2/15 1:00 AM to 5:00 AM IDOT Detour to 18th St.
Ohio Feeder to Edens Expy (I-94) 50.4 to 43.5 Medium Left lane and left shoulder closed, two to five lanes open 4/2/15 11:00 AM to 2:00 PM IDOT Moving Operation
Kennedy Junction to Park Ave West 43.5 to 23.1 Minor Both shoulders closed, all lanes open with partial ramp closures 4/2/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB IL-132 8.8 Minor Partial closure 3/20/15 7:00 AM to 5/1/15 11:59 PM Illinois Tollway Rdwy Reconst. and Plaza Repairs;Left Side of Ramp Closed; *** Long Term Closure ***
Entrance ramp from EB IL-132 8.6 Major All lanes and shoulders closed 2/27/15 7:00 AM to 5/19/15 11:59 PM Illinois Tollway Entrance Ramp Closed; *** Long Term Closure ***
Entrance ramp from WB IL-132 8.8 Minor Partial closure 3/11/15 6:00 AM to 4/17/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; *** Long Term Closure ***
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
Entrance ramp from Becher St 313.0 Medium All lanes and shoulders closed 4/1/15 9:00 PM to 4/2/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from Lapham Blvd Medium All lanes and shoulders closed 4/1/15 9:00 PM to 4/2/15 5:30 AM WisDOT Construction - Detour: Use alt route (National Ave entrance ramp)
Entrance ramp from NB General Mitchell Blvd 307.1 Medium All lanes and shoulders closed 4/2/15 10:30 PM to 4/3/15 5:30 AM WisDOT Construction - Detour: Take Bluemound to 70th to Greenfield to HWY 100 to the I-94 West Ramp
Entrance ramp from SB Hawley Rd 306.8 Medium All lanes and shoulders closed 4/2/15 10:30 PM to 4/3/15 5:30 AM WisDOT Construction - Detour: Take Hawley to Greenfield to HWY 100 to the I-94 West Ramp
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
68th St (-0.1 miles) to US-45 306.4 to 304.4 Major All lanes and shoulders closed 4/2/15 11:00 PM to 4/3/15 4:30 AM WisDOT Construction - Detour: I-94 WB to 70th to Greenfield to I-894/US 45 South or to HWY 100 to I-94 West. And I-94 WB to O'Connor to 76th to Bluemound to Glenview to Watertown Plank to US45 North.
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 5/22/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Exit ramp to NB US-45 304.6 Major All lanes and shoulders closed 4/1/15 11:00 PM to 4/2/15 4:30 AM WisDOT Construction - Detour: Take I-94 WB to the 68th Exit to 76th to Bluemound to Glenview to Watertown Plank to the US45 North Ramp.
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed Apr 01 2015 23:21:32 CDT