Construction Report
Select Location
  
Updated: 3/31/15 11:59 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Black Rd (+0.4 miles) to CR-J (-0.2 miles) 113.9 to 115.5 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
Johnson Rd (+0.7 miles) to Spring Center Rd (+0.1 miles) 27.2 to 28.0 Medium Right lane closed, two lanes open 3/31/15 7:00 AM to 4:00 PM Illinois Tollway Rdwy Widening and Reconst
Tyrrell Rd (-0.6 miles) to Randall Rd (-0.7 miles) 50.1 to 51.5 Medium Right lane closed, two lanes open 3/31/15 7:00 AM to 4:00 PM Illinois Tollway Bridge Widening and Reconst
IL-31 (-0.1 miles) to Duncan Ave 54.5 to 55.8 Minor Right lane closed, two or three lanes open 3/31/15 9:00 PM to 4/1/15 4:00 AM Illinois Tollway Bridge Widening and Reconst
IL-25 (+0.4 miles) to Bartlett Rd (+0.4 miles) 56.5 to 60.8 Medium Right lane closed, two or three lanes open 3/31/15 9:00 AM to 3:00 PM Illinois Tollway Rdwy and Bridge Widening
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Barrington Rd (-0.2 miles) to Roselle Rd (+0.4 miles) 62.0 to 66.0 Medium Right lane closed, two or three lanes open 3/31/15 7:30 PM to 4/1/15 5:00 AM Illinois Tollway Rdwy Widening and Reconst
Roselle Rd (+0.4 miles) to Meacham Rd 66.0 to 67.4 Medium Right lane closed, three lanes open 3/31/15 7:30 PM to 4/1/15 5:00 AM Illinois Tollway Rdwy Widening and Reconst
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 11/25/14 7:00 AM to 4/30/15 11:59 PM IDOT ***Long Term Closure***
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 3/31/15 9:00 AM to 3:00 PM IDOT Moving Operation
Exit ramp to EB Ohio St 50.1 Minor Partial closure 3/31/15 9:00 AM to 3:00 PM IDOT
Ohio Feeder to Grand Ave 50.3 to 50.5 Minor Right shoulder closed, all lanes open 3/31/15 9:00 AM to 3:00 PM IDOT
Entrance ramp from WB Ohio St 50.1 Minor Partial closure 3/31/15 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Jackson Blvd to Eisenhower Expy (I-290) 51.5 to 51.6 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to Harrison St 51.6 to 51.7 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/31/15 10:00 AM to 1:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/22/14 12:00 AM to 5/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
26th St to 0.5 miles north of Chicago Skwy (I-90) 54.1 to 58.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/31/15 9:00 AM to 1:30 PM IDOT Moving Operation
at Knights Of Columbus Dr 6.5 Medium Left lane closed, one lane open 3/30/15 8:00 PM to 3/31/15 1:00 PM,
3/31/15 8:00 PM to 4/1/15 12:00 AM
Indiana Toll Road MOT Installation
15th Ave (-0.1 miles) to I-94 (-0.3 miles) 17.0 to 21.0 Major All lanes and shoulders closed 3/31/15 8:00 PM to 4/1/15 5:00 AM Indiana Toll Road Demo of BHX-A over I-90; 20 minute rolling closures - All EB lanes
Bittersweet Rd (+0.5 miles) to Ash Rd (-0.1 miles) 85.0 to 87.0 Medium Right lane closed, one lane open 3/31/15 7:00 AM to 3:00 PM Indiana Toll Road Pothole Patching
County Road 9 (-0.1 miles) to 250 (+0.4 miles) 92.0 to 123.6 Medium Left lane closed, one lane open 3/31/15 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Pothole Patching

I-90 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/31/15 9:00 AM to 1:30 PM IDOT Moving Operation

I-90 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/31/15 10:00 AM to 3:00 PM IDOT Moving Operation

I-90 Reversible EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 3/31/15 11:30 AM to 1:30 PM IDOT

I-90 Reversible WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Ogden Ave to Montrose Ave Major All lanes and shoulders closed 3/31/15 11:30 AM to 1:30 PM IDOT

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
IN-327 (-0.5 miles) to IN-327 (+0.2 miles) 135.0 to 134.3 Medium Right lane closed, one lane open 3/31/15 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
250 (-0.4 miles) to County Road 9 (+0.1 miles) 123.6 to 92.0 Medium Left lane closed, one lane open 3/31/15 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Pothole Patching
Hamstrom Rd (+0.3 miles) to I-94 (+0.3 miles) 24.0 to 21.0 Major All lanes and shoulders closed 3/31/15 8:00 PM to 4/1/15 5:00 AM Indiana Toll Road Demo of BHX-A over I-90; 20 minute rolling closures- All WB lanes
I-94 (-0.2 miles) to Lake St (-0.5 miles) 21.5 to 19.5 Medium Various lanes closed 3/31/15 7:00 PM to 4/1/15 6:00 AM,
4/1/15 7:00 PM to 4/2/15 6:00 AM,
4/2/15 7:00 PM to 4/3/15 6:00 AM,
4/3/15 7:00 PM to 4/4/15 6:00 AM,
... more, ending on 1/1/16
Indiana Toll Road Remove Guardrail and install Lagging under BHX-A; One lane will remain open at all times - Start with the driving lane and switch to the passing lane
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 3/18/15 7:00 AM to 4/5/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild ***Long Term***
Entrance ramp from I-80/I-94 20.4 Major All lanes and shoulders closed 3/18/15 8:00 AM to 6/29/15 11:59 PM Indiana Toll Road Lake Station entrance ramp closed for Bridge Demo/Rebuild for 13 weeks ***Long Term Closure***
at Knights Of Columbus Dr (+0.1 miles) 6.5 Medium Left lane closed, one lane open 3/31/15 8:00 PM to 4/1/15 12:00 AM Indiana Toll Road MOT Installation
112th St (+0.2 miles) to US-12 (+0.1 miles) 0.6 to 0.0 Medium Right lane closed, one lane open 3/31/15 9:00 AM to 3:00 PM Indiana Toll Road Handrail Repair
Marquette Rd (67th St) to 63rd St 59.3 to 58.7 Medium Right lane and right shoulder closed, one or two lanes open with partial ramp closures 3/31/15 10:00 AM to 3:00 PM IDOT Moving Operation
Marquette Rd (67th St) to 26th St 59.3 to 54.1 Medium Left lane and left shoulder closed, one to three lanes open with partial ramp closures 3/31/15 10:00 AM to 3:00 PM IDOT Moving Operation
0.5 miles north of 63rd St to 57th St 58.2 to 58.0 Medium Right lane and right shoulder closed, two lanes open 3/31/15 10:00 AM to 2:00 PM IDOT
Garfield Blvd (55th St) to 26th St 57.7 to 54.1 Medium Right lane and right shoulder closed, one to three lanes open with partial ramp closures 3/31/15 10:00 AM to 3:00 PM IDOT Moving Operation
26th St to Stevenson Expy (I-55) 54.1 to 53.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 3/31/15 10:00 AM to 1:00 PM IDOT Moving Operation
Stevenson Expy (I-55) to Eisenhower Expy (I-290) 53.7 to 51.7 Medium Right lane and right shoulder closed, two to four lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from SB Stevenson / I-55 53.0 Minor Right shoulder closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to EB I-290 52.4 Major All lanes and shoulders closed 3/13/15 12:00 AM to 12/31/16 11:59 PM IDOT ***Long Term Closure***
Exit ramp to WB I-290 52.4 Minor Both shoulders closed, all lanes open 3/12/15 12:00 AM to 6/1/16 11:59 PM IDOT Reduced width ***Long Term Closure***
Roosevelt Rd to Eisenhower Expy (I-290) 52.2 to 51.7 Minor Both shoulders closed, all lanes open 3/13/15 12:00 AM to 6/1/16 11:59 PM IDOT Lanes shifted. 4 lanes total through section. ***Long Term Closure***
Entrance ramp from Roosevelt Rd 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from Taylor St 51.8 Medium All lanes and shoulders closed 3/11/15 12:00 AM to 6/1/16 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Jackson Blvd 51.7 to 51.5 Minor Both shoulders closed, all lanes open 10/13/14 12:00 AM to 7/31/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 3/31/15 9:00 AM to 3:00 PM IDOT Moving Operation
Grand Ave to Ohio Feeder 50.5 to 50.4 Minor Right shoulder closed, all lanes open 3/31/15 9:00 AM to 3:00 PM IDOT
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/8/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway Bridge Construction; ***Long Term Closure***
Entrance ramp from SB Arlington Heights Rd 70.2 Minor Various lanes closed 3/23/15 7:00 AM to 11/20/15 11:59 PM Illinois Tollway Rdwy Widening and Reconst;Right IPO Lane Closed; Right Side of Ramp Closed; ***Long Term Closure***
IL-58 (+0.6 miles) to I-290 (-0.3 miles) 68.9 to 68.5 Medium Right lane closed, two or three lanes open 3/31/15 7:00 AM to 4:00 PM Illinois Tollway Retaining/Noise Wall and Draining Improv; (Right lane of CD road to I-290 / IL-53 closed)
I-290 (-0.3 miles) to Meacham Rd (-0.1 miles) 68.5 to 67.5 Medium Left lane closed, two or three lanes open 3/17/15 7:00 AM to 8/1/15 11:59 PM Illinois Tollway Rdwy Widening and Reconst; (Left lane of CD road to IL-290 / IL-53 closed); *** Long Term Closure ***
I-290 (-0.1 miles) to IL-53 68.3 to 68.2 Medium Left lane closed, two lanes open 3/31/15 12:00 AM to 4/14/15 12:00 AM Illinois Tollway Rdwy Widening and Reconst
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 6/6/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Bartlett Rd (+0.3 miles) to IL-25 (-0.7 miles) 60.1 to 56.8 Minor Right lane closed, two or three lanes open 3/31/15 10:00 PM to 4/1/15 5:00 AM Illinois Tollway Rdwy and Bridge Widening
IL-25 (-0.6 miles) to Duncan Ave 56.7 to 55.8 Medium Right lane closed, two lanes open 3/31/15 9:00 AM to 3:00 PM Illinois Tollway Bridge and Ramp Reconst
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/26/15 12:00 AM to 4/19/15 11:45 PM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA
CR-J (+0.1 miles) to Kent Rd 115.5 to 114.3 Major Right two lanes closed, one lane open 3/31/15 10:00 PM to 4/1/15 6:00 AM WisDOT Construction - Madison - Portage | Rowan Creek Bridges | I 39 | COLUMBIA

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Tue Mar 31 2015 11:59:55 CDT