Construction Report
Select Location
  
Updated: 7/30/14 12:00 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
CR-V to Cuba Valley Rd 126.7 to 128.8 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 6:00 AM WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE
Portage Rd (+0.4 miles) to Lien Rd 134.8 to 136.8 Medium Left lane closed, two lanes open 6/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
Exit to SB US-151 135.3 Major All lanes and shoulders closed 4/1/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will exit at the USH 51 inerchange , proceed south on USH 51 to the STH 30 interchange, turn left onto STH 30, proceed east to IH 39 north, take IH39 north to the USH 151 exit and proceed north on USH 151.
at County Road T (-0.2 miles) 137.7 Medium Left lane closed, two lanes open 7/30/14 7:00 AM to 7/31/14 7:00 AM daily until 8/1/14 WisDOT Maintenance - Bridge Repair
WI-106 to Richardson Springs Rd 159.2 to 163.4 Medium Right lane closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - Detour: No posted detour
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
Getty Rd to Marengo-Hampshire Plaza 37.5 to 38.2 Medium Left lane and both shoulders closed, two or three lanes open 11/15/13 12:00 AM to 10/31/14 12:00 AM Illinois Tollway Pavement Widening; ***Long Term Closure***
at Marengo-Hampshire Plaza 37.8 Medium Various lanes closed 5/7/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Left ORT Lane Closed; ***Long Term Closure***
Getty Rd (+0.3 miles) to Getty Rd (+0.4 miles) 37.8 to 37.9 None All lanes and shoulders open 4/9/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Rdwy Widening and Reconst.
IL-31 to Duncan Ave 54.6 to 55.8 None All lanes shifted 7/15/14 12:00 AM to 9/21/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure ***
Entrance from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side Ramp Closed; *** Long Term Closure***
Barrington Rd (-0.4 miles) to Barrington Rd 61.8 to 62.2 Medium Left lane closed, two lanes open 7/30/14 9:00 AM to 3:00 PM Illinois Tollway
Ramp from EB I-90 to NB IL-53 68.2 Medium Various lanes closed 7/17/14 12:00 AM to 8/8/14 11:59 PM Illinois Tollway IPO Lanes Closed; *** Long Term Closure ***
I-290 (+0.3 miles) to IL-58 (-0.5 miles) 68.5 to 68.9 Medium Right lane closed, two or three lanes open 7/14/14 12:00 AM to 8/11/14 12:00 AM Illinois Tollway *** Long Term Closure ***
Entrance from SB Lee St Minor All lanes shifted 6/24/14 7:00 AM to 8/8/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure
Entrance from NB Lee St 76.4 Minor Various lanes closed 6/24/14 7:00 AM to 8/8/14 11:59 PM Illinois Tollway All Lanes Shifted Right on ramp from NB Lee St; Right Turn Lane closed on ramp from SB Lee St; *** Long Term Closure ***
at River Rd Plaza 78.5 to 78.6 Medium Various lanes closed 7/30/14 1:00 AM to 7/31/14 5:00 AM Illinois Tollway All ORT Lanes Closed
Exit to SB Cumberland Ave (IL-171) Minor Partial closure 4/3/14 7:00 AM to 8/29/14 11:59 PM IDOT Maximum Width 9' 6" *** Long Term Closure ***
Harlem Ave (IL-43) to Addison St 81.2 to 45.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Montrose Ave to Ohio Feeder 43.5 to 50.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 7/30/14 10:00 AM to 1:00 PM IDOT Moving Operation
North Ave (IL-64) to Eisenhower Expy (I-290) 48.9 to 51.6 Minor Right shoulder closed, all lanes open 7/30/14 9:00 AM to 3:00 PM IDOT
Exit to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** Left and Right Shoulders Closed
Ogden Ave to Grand Ave 50.1 to 50.5 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent shoulder closure for remainder of project between EB I-90 entrance to EB Ohio and WB Ohio entrance to EB I-90.
at Ohio Feeder 50.3 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to 26th St 51.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 9/1/14 11:59 PM IDOT *** Long Term Closure ***
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 7/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
US-12 to Meridian Rd (+0.1 miles) 0.0 to 30.0 Medium Various lanes closed 7/29/14 8:00 PM to 7/31/14 6:00 AM Indiana Toll Road Painting; Moving Operation
112th St to Hoffman St 1.5 to 5.7 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 8/30/14 11:59 PM Indiana Toll Road **Long Term Closure**; Bridge Reconstruction. Closed through 8/30/14.
at 112th St (+1.3 miles) 2.1 Medium Right lane closed, two lanes open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Switch MOT to Stage 3
at Sheffield Ave 3.5 Medium Various lanes closed 7/30/14 8:00 PM to 7/31/14 2:00 PM Indiana Toll Road Joint Sealant Replacement Punching
at Sheffield Ave 3.5 Medium Left lane closed, one lane open 7/29/14 8:00 PM to 7/30/14 2:00 PM Indiana Toll Road Shotcrete and Punchlist
at Taylor Rd (Lake Station) 16.0 Medium Various lanes closed 7/28/14 11:00 PM to 8/1/14 5:00 AM Indiana Toll Road Rolling 20-minute rolling closures of Ramp B for pulling beams & concrete deck slabs
Exit to EB I-94 20.4 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road *** Long Term Closure ***; Ramp Closed through 11/26/14; Detour in place; Demo Rebuild
Entrance from EB I-80 20.9 Minor All lanes and shoulders open 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road **Long Term Closure**; 80/94 to ITR 14' Width restriction only.
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
Sycamore Rd (+0.9 miles) to US-31 (+0.2 miles) 69.0 to 72.3 Medium Right lane closed, one lane open 7/29/14 8:00 PM to 7/30/14 2:00 PM Indiana Toll Road Mill and Fill; Lane shift on exit ramp
575 (-0.1 miles) to 750 (+0.3 miles) 126.4 to 129.7 Medium Left lane closed, one lane open 7/30/14 6:00 AM to 7/31/14 3:00 PM Indiana Toll Road Deep Patching
450 West (+0.3 miles) to 300 (+0.1 miles) 139.8 to 141.1 Medium Left lane closed, one lane open 7/29/14 6:00 AM to 7/30/14 3:00 PM Indiana Toll Road Deep Patching

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
US-31 (-0.8 miles) to Olive Rd (+0.3 miles) 72.9 to 71.4 Medium Right lane closed, one lane open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Mill and Fill
County Road 100 W to Meridian Rd (-0.1 miles) 50.0 to 30.0 Medium Right lane closed, one lane open 7/30/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Boom Mowing
Meridian Rd (-0.1 miles) to US-12 (+0.1 miles) 30.0 to 0.0 Medium Various lanes closed 7/29/14 8:00 PM to 7/31/14 6:00 AM Indiana Toll Road Painting; Moving Operation
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
Mccool Rd (-0.2 miles) to Central Ave (+0.1 miles) 26.0 to 25.0 Medium Right lane closed, one lane open 7/30/14 7:00 AM to 3:00 PM Indiana Toll Road Guardrail Repair
Exit to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 8/8/14 11:59 PM Indiana Toll Road Lake Station exit ramp closed for reconstruction until Spring 2015.
Hoffman St to 112th St 5.7 to 1.5 Minor All lanes and shoulders open 6/30/14 7:00 AM to 10/15/14 11:59 PM Indiana Toll Road **Long Term Closure**; 11' width & 130,000 lb weight restriction until 10/15/14.
at Sheffield Ave 3.5 Medium Left lane closed, one lane open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Joint Sealant Replacement Punching
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 8/30/14 11:59 PM Indiana Toll Road **Long Term Closure**; Bridge Reconstruction. Closed through 8/30/14.
at 112th St (-1.3 miles) 2.1 Medium Right lane closed, two lanes open 7/30/14 6:00 PM to 7/31/14 6:00 AM Indiana Toll Road Switch MOT to Stage 3
69th St to 26th St 59.6 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 7/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
26th St to Eisenhower Expy (I-290) 54.1 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 7/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to North Ave (IL-64) 51.7 to 48.9 Minor Right shoulder closed, all lanes open 7/30/14 9:00 AM to 3:00 PM IDOT
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project starting 6/18/2014. Attenuator and barrier wall to be installed.
at Ohio Feeder 50.4 Minor Left shoulder closed, all lanes open 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ohio Feeder to Montrose Ave 50.4 to 43.5 Medium Left lane and left shoulder closed, three to five lanes open with partial ramp closures 7/30/14 11:00 AM to 2:00 PM IDOT Moving Operation
Entrance from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ogden Ave to Montrose Ave 50.1 to 43.5 Medium Right lane and right shoulder closed, three to five lanes open with partial ramp closures 7/30/14 11:00 AM to 2:00 PM IDOT Moving Operation
Addison St to Harlem Ave (IL-43) 45.1 to 81.2 Minor Both shoulders closed, all lanes open with partial ramp closures 7/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Harlem Ave (IL-43) to 0.5 miles west of Harlem Ave (IL-43) 81.2 to 80.7 Minor Right shoulder closed, all lanes open 7/30/14 9:00 AM to 3:00 PM IDOT
Canfield Ave to Cumberland Ave (IL-171) 80.3 to 79.7 Minor Right shoulder closed, all lanes open 7/11/14 12:00 AM to 8/29/14 11:59 PM IDOT ***Long Term Closure***
Canfield Ave to East River Rd 80.3 to 79.1 Minor Right shoulder closed, all lanes open 7/30/14 9:00 AM to 3:00 PM IDOT
Cumberland Ave (IL-171) to I-190 79.7 to 79.1 Minor Both shoulders closed, all lanes open 5/18/14 12:00 AM to 11/21/14 11:59 PM IDOT ***Long Term Closure*** Lanes weaved to the right and reassigned. LN3 & LN4 Exit Only to WB I-190.
Ramp from WB I-90 to Lee St 76.2 Minor All lanes shifted 4/26/14 12:00 AM to 8/8/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure ***
IL-72 (-0.1 miles) to IL-72 76.2 to 76.1 Medium Right lane closed, three or four lanes open 4/26/14 12:00 AM to 8/8/14 12:00 AM Illinois Tollway Bridge and Ramp Reconstruction
Exit to Roselle Rd 66.0 Minor Various lanes closed 6/17/14 5:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Duncan Ave to IL-31 55.8 to 54.6 None All lanes shifted 7/11/14 12:00 AM to 9/21/14 11:59 PM Illinois Tollway All Lanes Shifted Right; *** Long Term Closure ***
Bypass US-20 to Kishwaukee River 19.8 to 18.4 Medium Left lane and both shoulders closed, one lane shifted 4/2/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; ***Long Term Closure***
Kishwaukee River to Mill Rd 18.4 to 17.7 Medium Left lane and both shoulders closed, one lane open 4/1/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; *** Long Term Closure ***
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at 1 mile North of Rockton Rd 2.5 to 2.2 Medium Various lanes closed 4/9/14 7:00 PM to 9/30/14 11:59 PM IDOT Alternating driving and passing lane closure
County Road Ab (-0.3 miles) to US-12 (-0.6 miles) 144.7 to 142.7 Medium Right lane closed, one lane open 7/30/14 7:00 PM to 7/31/14 5:00 AM WisDOT Construction - ILLINOIS STATE LINE - MADISON | SIGGELKOW RD BRDGS B-13-138, 727 | I 39 | DANE Stage 2 NB Outside Widening
Cottage Grove Rd (-0.1 miles) to Milwaukee St (+0.1 miles) 139.5 to 138.3 Medium Right lane closed, two lanes open 7/30/14 8:00 PM to 7/31/14 5:30 AM daily until 8/1/14 WisDOT Construction - JANESVILLE - MADISON | BUCKEYE ROAD - LIEN RD | I 39 | DANE
Exit to SB US-151 136.4 Medium Various lanes closed 3/30/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - Detour: Vehicles will use the northbound USH 151 exit, proceed north to CTH C interchange, exit at the CTH C ramp, make a left-turn to go over the bridge and turn left at the southbound USH 151 on-ramp and proceed south on USH 151.
US-151 to Portage Rd (-0.3 miles) 135.6 to 134.7 Medium Left lane closed, two lanes open 6/9/14 12:00 AM to 8/29/14 11:45 PM WisDOT Construction - MADISON - PORTAGE | USH 151 OVERPASS STRUCTURES | I 39 | DANE
US-51 to WI-19 (+0.2 miles) 132.4 to 130.7 Major Right two lanes closed, one lane open 7/30/14 8:00 PM to 7/31/14 6:00 AM daily until 8/1/14 WisDOT Construction - MADISON - LAKE DELTON RD | I 39 | DANE

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Wed Jul 30 12:11:01 CDT 2014