NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
I-90 EB (Regional)
| mile marker 101.9 to WI-33
|
101.9 to 105.9 |
Medium |
Left lane closed, one lane open |
06/18/13 07:00 PM to 06/19/13 09:00 AM |
WisDOT |
Construction - TOMAH - PORTAGE | CAMP DOUGLAS - 24TH AVE | I 90/94 | JUNEAU |
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| WI-19 to Lien Rd
|
130.7 to 136.8 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| Exit to Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Exit to US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Entrance from US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.3 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.3 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| East River Rd to Montrose Ave
|
79.1 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 11:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Harlem Ave (IL-43) to Lawrence Ave
|
81.2 to 84.1 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| Montrose Ave to Ohio St
|
43.5 to 50.3 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to Ohio St
|
50.5 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Exit to Ohio St
|
50.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Ohio St to I-290
|
50.3 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:30 AM to 02:00 PM |
IDOT |
Moving Operation |
| Entrance from Ontario St
|
50.1 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Entrance from Ontario St
|
50.1 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to Adams St
|
51.2 |
Minor |
Ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| I-290 to 31st St
|
51.6 to 54.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| I-290 to 99th St
|
51.7 to 63.4 |
Medium |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| IN-51 to IN-51 (+0.3 miles)
|
20.4 to 20.7 |
Medium |
Various lanes closed |
06/18/13 09:00 AM to 10/15/13 09:00 PM |
Indiana Toll Road |
Bridge Work; 2 lanes open at all times |
| I-94 (-0.1 miles) to Mccool Rd (+0.4 miles)
|
21.2 to 26.2 |
Medium |
Right lane closed, one lane open |
06/18/13 08:00 PM to 06/19/13 01:00 PM daily until 06/19/13 |
Indiana Toll Road |
Mill and Fill |
| Ramp from EB I-80/90 (Indiana Toll Road) to Travel Plaza 1
|
21.5 |
Minor |
Ramp work, possible width reduction |
06/18/13 08:00 PM to 06/19/13 01:00 PM daily until 06/19/13 |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| Ramp from Travel Plaza 1 to EB I-80/90 (Indiana Toll Road)
|
21.8 |
Minor |
Ramp work, possible width reduction |
06/18/13 08:00 PM to 06/19/13 01:00 PM daily until 06/19/13 |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| at County Road 200 E
|
32.0 |
Medium |
Various lanes closed |
06/19/13 02:00 AM to 01:00 PM |
Indiana Toll Road |
1 Lane 1 shoulder; Bridge Painting |
| 700 (+0.3 miles) to 700 (+0.5 miles)
|
153.0 to 153.2 |
Medium |
Left lane closed, one lane open |
06/19/13 07:00 AM to 06/20/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
I-90 WB (Regional)
| County Road 600 (-0.2 miles) to 550 (-0.3 miles)
|
151.6 to 151.0 |
Medium |
Left lane closed, one lane open |
06/19/13 07:00 AM to 06/20/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| IN-9 (+0.7 miles) to County Road 9 (+0.1 miles)
|
120.0 to 92.0 |
Medium |
Right lane closed, one lane open |
06/19/13 07:00 AM to 05:00 PM |
Indiana Toll Road |
Moving Operation; Paint Striping |
| Primrose Rd to Sycamore Rd
|
70.3 to 68.0 |
Medium |
Right lane closed, one lane open |
06/17/13 12:00 AM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Hamilton Trl (-1.0 miles) to Timothy Rd (+0.1 miles)
|
64.7 to 62.7 |
Medium |
Right lane closed, one lane open |
06/18/13 06:00 PM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| at County Road 200 E
|
32.0 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 07:00 PM |
Indiana Toll Road |
1 Lane 1 shoulder; Bridge Painting |
| Exit to EB I-94
|
21.1 |
Medium |
All lanes and shoulders open |
01/03/11 07:00 AM to 01/06/14 11:59 PM |
Indiana Toll Road |
No lanes closed, Exit 21 WB 12 ft width restriction |
| IN-51 (-0.3 miles) to IN-51
|
20.7 to 20.4 |
Medium |
Various lanes closed |
06/18/13 09:00 AM to 10/15/13 09:00 PM |
Indiana Toll Road |
Bridge Work; 2 lanes open at all times |
| Entrance from EB I-80
|
20.4 |
Medium |
All lanes and shoulders open |
03/14/11 07:00 PM to 01/06/14 11:59 PM |
Indiana Toll Road |
Lake Station - EB Exit from 80/94 to ITR Bridge: No lanes closed, 14 ft width restriction |
| Ramp from NWB I-90 (Chicago Skwy) to Dan Ryan Express
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
Entrance to Dan Ryan Express Lanes from Chicago Skyway closed - all traffic diverted to Local Lanes. **Long Term Closure** |
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
| 99th St to I-290
|
63.4 to 51.7 |
Medium |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| 31st St to I-290
|
54.7 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| I-290 to Ohio St
|
51.6 to 50.4 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 09:30 AM to 01:00 PM |
IDOT |
Moving Operation |
| Jackson Blvd to Fullerton Ave
|
51.5 to 47.5 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Exit to Ohio St
|
50.7 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Exit to Ohio St
|
50.7 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Ohio St to Montrose Ave
|
50.3 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 11:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Entrance from Ontario St
|
50.1 |
Minor |
Right shoulder closed, all lanes open |
06/19/13 09:00 AM to 03:00 PM |
IDOT |
|
| Entrance from Ontario St
|
50.1 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Montrose Ave to East River Rd
|
43.5 to 79.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| US-20 Ramps to IL-23
|
41.5 to 36.0 |
Medium |
Right lane closed, one lane open |
06/19/13 05:00 AM to 11:00 AM |
Illinois Tollway |
Landscaping; Moving Operation |
| Exit to Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Irene Rd to Mill Rd
|
20.8 to 17.7 |
Medium |
Right lane closed, one lane open |
04/17/13 05:00 PM to 10/06/13 11:59 PM |
Illinois Tollway |
Pavement Widening; Trqffic Shift; ***Long Term Closure*** |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| Exit to NB US-51
|
160.4 |
Major |
All lanes and shoulders closed |
06/19/13 08:00 PM to 06/20/13 05:00 AM daily until 06/20/13 |
WisDOT |
Construction - Detour: N/A |
| Milwaukee St to US-51
|
138.5 to 132.2 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |