Construction Report
Select Location
  
Updated: 12/18/14 9:21 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
Stone Quarry Rd (+1.2 miles) to Genoa Rd (+0.8 miles) 24.0 to 25.8 Major Right two lanes closed, up to one lanes open 12/18/14 9:00 AM to 1:00 PM Illinois Tollway New Interchange
Stone Quarry Rd (+1.2 miles) to Genoa Rd (+0.8 miles) 24.0 to 25.8 Medium Right lane closed, one or two lanes open 12/18/14 1:00 PM to 3:00 PM Illinois Tollway New Interchange
at Marengo-Hampshire Plaza 37.8 Medium Various lanes closed 5/7/14 7:00 AM to 12/18/14 11:59 PM Illinois Tollway 2 Right ORT Lanes Closed; ***Long Term Closure***
Beverly Rd to Canadian National RR 57.8 to 58.6 Minor All lanes shifted 4/24/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway ***Long Term***; All Lanes Shifted Left.
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
IL-59 (-0.2 miles) to IL-72 (-0.4 miles) 59.5 to 60.9 Medium Right lane closed, two lanes open 12/18/14 9:00 AM to 3:00 PM Illinois Tollway Bridge Reconstruction
Ramp from EB I-90 to NB IL-53 68.2 Minor Various lanes closed 8/20/14 7:00 AM to 12/31/14 11:59 PM Illinois Tollway Toll Plaza Maintenance; Left IPO Lane Closed; ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 10/30/14 7:00 AM to 12/30/14 11:59 PM Illinois Tollway *** Long Term Clsoure ***; Detour posted
Ramp from EB I-90 to Cumberland Ave / IL-171 79.3 Minor Partial closure 4/3/14 7:00 AM to 1/30/15 11:59 PM IDOT ***Long Term Closure***
EB Kennedy (I-90/94) to Orleans St 50.1 Medium Left lane or right lane and both shoulders closed 12/18/14 10:00 AM to 1:00 PM IDOT Moving Operation
Ohio Feeder to Grand Ave 50.3 to 50.5 Minor Right shoulder closed, all lanes open 12/18/14 9:00 AM to 3:00 PM IDOT
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor All lanes shifted and both shoulders closed 10/13/14 12:00 AM to 1/5/15 11:59 PM IDOT Traffic weaved ***Long Term Closure***
Eisenhower Expy (I-290) to I-57 / Bishop Ford (I-94) 51.7 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 12/18/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 12/24/14 11:59 PM IDOT 11' Width ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/15 11:59 PM IDOT 11' Width ***Long Term Closure***
112th St to Hoffman St 1.5 to 5.7 Minor All lanes and shoulders open 6/30/14 7:00 AM to 12/28/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction; ***Long Term***
at 112th St (+1.3 miles) 2.1 Medium Right lane closed, two lanes open 12/18/14 6:00 AM to 1:00 PM Indiana Toll Road Punch List
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 12/28/14 11:59 PM Indiana Toll Road Bridge Reconstruction; ***Long Term Closure***
Exit ramp to EB I-94 20.4 Major All lanes and shoulders closed 6/5/14 6:00 AM to 12/28/14 11:59 PM Indiana Toll Road Detour in place; *** Long Term Closure ***
Entrance ramp from EB I-80 20.9 Minor All lanes and shoulders open 6/30/14 7:00 AM to 12/28/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' width restriction; ***Long Term***
US-35 (-0.5 miles) to Range Rd (+0.4 miles) 47.0 to 51.5 Medium Right lane closed, one lane open 12/18/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Crack Sealing
at US-31 (-0.1 miles) 72.0 Minor Right shoulder closed, all lanes open 12/18/14 7:30 AM to 4:30 PM Indiana Toll Road Pier Patching
County Road 5 (+0.5 miles) to County Road 9 (-0.1 miles) 90.0 to 92.0 Medium Right lane closed, one lane open 12/18/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Crack Sealing
575 (+0.5 miles) to 700 (+0.2 miles) 127.0 to 128.0 Medium Right lane closed, one lane open 12/18/14 6:00 AM to 12:00 PM Indiana Toll Road SRPM Placement; Moving Operation
750 (+1.6 miles) to County Road 1050 (-0.3 miles) 131.0 to 131.4 Medium Right lane closed, one lane open 12/18/14 6:00 AM to 12:00 PM Indiana Toll Road SRPM Placement; Moving Operation
IN-827 (+0.1 miles) to IN-827 (+0.5 miles) 147.6 to 148.0 Medium Left lane closed, one lane open 12/18/14 6:00 AM to 12:00 PM Indiana Toll Road SRPM Placement; Moving Operation
IN-827 (+0.1 miles) to IN-827 (+0.5 miles) 147.6 to 148.0 Medium Right lane closed, one lane open 12/18/14 6:00 AM to 12:00 PM Indiana Toll Road SRPM Placement; Moving Operation
County Road 600 (+0.2 miles) to 700 (+0.2 miles) 151.6 to 152.9 Medium Right lane closed, one lane open 12/18/14 6:00 AM to 12:00 PM Indiana Toll Road SRPM Placement; Moving Operation

I-90 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 12/18/14 9:00 AM to 3:00 PM IDOT Moving Operation

I-90 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 12/18/14 9:00 AM to 3:00 PM IDOT Moving Operation

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
300 (-0.4 miles) to 1000 (+0.4 miles) 118.0 to 110.0 Medium Right lane closed, one lane open 12/18/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Crack Sealing
Meridian Rd (-0.1 miles) to Hamstrom Rd (+0.3 miles) 30.0 to 24.0 Medium Right lane closed, one lane open 12/18/14 7:00 AM to 3:00 PM Indiana Toll Road Moving Operation; Crack Sealing
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015; ***Long Term***
at Old Hobart Rd (-0.1 miles) 20.1 Medium Right lane closed, one lane open 12/18/14 10:00 AM to 6:00 PM Indiana Toll Road Patch Repair
Hoffman St to 112th St 5.7 to 1.5 Minor All lanes and shoulders open 6/30/14 7:00 AM to 12/28/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction; ***Long Term***
at Columbia Ave (-0.1 miles) 5.4 Medium Left lane closed, one lane open 12/18/14 10:00 AM to 6:00 PM Indiana Toll Road Punch List
at 112th St (-1.3 miles) 2.1 Medium Right lane closed, two lanes open 12/18/14 10:00 AM to 6:00 PM Indiana Toll Road Punch List
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 12/28/14 11:59 PM Indiana Toll Road Bridge Reconstruction; ***Long Term Closure***
I-57 / Bishop Ford (I-94) to Eisenhower Expy (I-290) 62.9 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 12/18/14 9:00 AM to 3:00 PM IDOT Moving Operation
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 1/5/15 11:59 PM IDOT ***Long Term Closure***
Orleans St to WB Kennedy (I-90/94) 50.3 Medium Left lane or right lane and both shoulders closed 12/18/14 11:00 AM to 2:00 PM IDOT Moving Operation
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 10/30/14 7:00 AM to 12/30/14 11:59 PM Illinois Tollway *** Long Term Closure ***; Detour posted
Exit ramp to NB Arlington Heights Rd 71.1 Minor Partial closure 8/8/14 12:00 AM to 12/22/14 11:59 PM Illinois Tollway Retaining Wall Construction
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 3/15/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
IL-47 to WB I-90 (Jane Addams Memorial Tollway) 46.2 Major All lanes and shoulders closed 12/18/14 11:00 PM to 12/19/14 5:00 AM Illinois Tollway Motorists can enter WB I-90 at the US-20 Interchange, about five miles west of IL-47.
Belvidere Plaza to US-20 Bypass (+1.4 miles) 23.3 to 18.4 Medium Right lane closed, one to four lanes open 12/18/14 6:00 AM to 3:30 PM Illinois Tollway Pavement Widening and Reconstruction
US-20 Bypass (+1.4 miles) to US-20 Bypass (+1.8 miles) 18.4 to 18.0 Medium Right lane closed, two lanes open 12/18/14 6:30 AM to 3:30 PM Illinois Tollway Bridge Replacement
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at Ruger Ave (-0.1 miles) 174.3 Medium Right lane closed, one lane open 12/18/14 8:00 PM to 12/19/14 5:00 AM daily until 12/23/14 WisDOT Construction - Soil borings for I-39 South Segement design project ID 1003-10-01

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Dec 18 09:21:27 CST 2014