Construction Report
Select Location
  
Updated: 10/30/14 11:30 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-90 EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to WB US-12 Major All lanes and shoulders closed 10/30/14 9:00 PM to 10/31/14 5:00 AM WisDOT Construction - Detour: Continue north on IH-39, exit left to Hwy 30 west, exit left to Hwy 51 south, continue south to USH 12/18.
US-51 to Goede Rd 160.0 to 162.5 Medium Left lane closed, one lane open 10/30/14 8:00 PM to 10/31/14 6:00 AM WisDOT Construction - Detour: No posted detour
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
at Marengo-Hampshire Plaza 37.8 Medium Various lanes closed 5/7/14 7:00 AM to 12/5/14 11:59 PM Illinois Tollway 2 Right ORT Lanes Closed; ***Long Term Closure***
IL-31 to Duncan Ave 54.6 to 55.8 Minor All lanes shifted 9/28/14 8:00 AM to 11/21/14 11:59 PM Illinois Tollway All Lanes Shifted Left; **Long Term**
Beverly Rd to Canadian National RR 57.8 to 58.6 Minor All lanes shifted 4/24/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway ***Long Term***; All Lanes Shifted Left.
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
Ramp from EB I-90 to NB IL-53 68.2 Minor Various lanes closed 8/20/14 7:00 AM to 12/31/14 11:59 PM Illinois Tollway Toll Plaza Maintenance; Left IPO Lane Closed; ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/6/14 12:00 AM to 10/30/14 11:59 PM Illinois Tollway ***Long Term Closure*** Detour Posted
Ramp from SB Lee St to EB I-90 76.1 to 76.2 Minor All lanes shifted 9/11/14 12:00 AM to 11/24/14 11:59 PM Illinois Tollway All Lanes Shifted Left; ***Long Term***
Entrance ramp from NB Lee St 76.4 Minor Partial closure 4/26/14 12:00 AM to 11/24/14 12:00 AM Illinois Tollway Ramp Open - Right Turn Lane Closed; *** Long Term Closure ***
Entrance ramp from EB IL-72 76.4 Minor All lanes shifted 10/2/14 6:00 AM to 11/24/14 11:59 PM Illinois Tollway ***Long Term Closure***
Exit ramp to SB Cumberland 79.3 Medium Partial closure 10/30/14 9:00 AM to 3:00 PM IDOT
Cumberland Ave (IL-171) to Canfield Ave 79.6 to 80.3 Minor Right shoulder closed, all lanes open 8/18/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
0.5 miles east of East River Rd to Eisenhower Expy (I-290) 79.6 to 51.6 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Canfield Ave to Montrose Ave 80.3 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/30/14 11:00 AM to 2:00 PM IDOT Moving Operation
Montrose Ave to Ogden Ave 43.5 to 50.1 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/30/14 10:00 AM to 1:00 PM IDOT Moving Operation
Exit ramp to EB Ohio St 50.1 Minor Partial closure 10/15/13 12:00 AM to 10/31/14 11:59 PM IDOT Left and Right Shoulders Closed; ***Long Term Closure***
Ogden Ave to Grand Ave 50.1 to 50.5 Minor All lanes shifted and right shoulder closed 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT Lanes narrowed and weaved ; ***Long Term Closure***
Entrance ramp from WB Ohio St 50.1 Minor Partial closure 9/6/13 12:00 AM to 10/31/14 11:59 PM IDOT Narrow lanes; ***Long Term Closure***
Grand Ave to Van Buren St 50.5 to 51.6 Medium Right lane and right shoulder closed, two to four lanes open with partial ramp closures 10/30/14 10:30 AM to 2:00 PM IDOT Moving Operation
Grand Ave to Eisenhower Expy (I-290) 50.5 to 51.6 Medium Left lane and left shoulder closed, two to four lanes open with partial ramp closures 10/30/14 10:30 AM to 2:00 PM IDOT Moving Operation
Exit ramp to WB I-290 51.4 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; ***Long Term Closure***
Van Buren St to Eisenhower Expy (I-290) 51.6 to 51.6 Minor Left shoulder closed, all lanes open 10/13/14 12:00 AM to 1/5/15 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to I-57 / Bishop Ford (I-94) 51.7 to 62.9 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from EB Eisenhower / I-290 52.0 Minor Right lane and both shoulders closed, up to two lanes open 6/21/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; ***Long Term Closure***
Entrance ramp from WB I-290 52.0 Minor Both shoulders closed, all lanes open 6/1/14 12:00 AM to 12/1/14 11:59 PM IDOT 11' Width; ***Long Term Closure***
Entrance ramp from Cermak Rd 54.6 Minor Both shoulders closed, all lanes open 10/30/14 9:00 AM to 2:30 PM IDOT Moving Operation
108th St (+0.2 miles) to 112th St (+0.2 miles) 0.5 to 1.0 Medium Right lane closed, one to three lanes open 10/30/14 8:00 AM to 5:00 PM Indiana Toll Road RWIS Sensor Install
112th St to Hoffman St 1.5 to 5.7 Minor All lanes and shoulders open 6/30/14 7:00 AM to 11/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 11/15/14; ***Long Term Closure***
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 11/9/14 11:59 PM Indiana Toll Road Bridge Reconstruction; ***Long Term Closure***
Buchanan St (-0.1 miles) to Taylor Rd (-0.2 miles) 13.6 to 16.0 Medium Various lanes closed 10/29/14 8:00 PM to 10/30/14 2:00 PM daily until 10/31/14 Indiana Toll Road Hot Pour Modulars
Exit ramp to EB I-94 20.4 Major All lanes and shoulders closed 6/5/14 6:00 AM to 11/26/14 11:59 PM Indiana Toll Road Ramp to I-94 closed through 11/26/14; Ramp Demo/Rebuild; Detour in place; *** Long Term Closure ***
Entrance ramp from EB I-80 20.9 Minor All lanes and shoulders open 6/30/14 7:00 AM to 11/2/14 11:59 PM Indiana Toll Road 80/94 to ITR 14' Width restriction only; ***Long Term Closure***
at I-94 (-0.3 miles) 21.0 Medium Various lanes closed 10/27/14 11:00 PM to 11/9/14 5:00 AM Indiana Toll Road Set Structural Steel and Decking; 20 min. Traffic Holds
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 11/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 11/15/14; ***Long Term Closure***

I-90 Express EB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
26th St to 69th St 54.1 to 59.5 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Entrance ramp from Cermak Rd 54.5 Minor Both shoulders closed, all lanes open 10/30/14 9:00 AM to 2:30 PM IDOT Moving Operation

I-90 Express WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
69th St to 26th St 59.5 to 54.1 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Dan Ryan Expy (I-94) to Cermak Rd (22nd St) 54.6 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 10:00 AM to 3:00 PM IDOT Moving Operation

I-90 WB (Regional)
Location Mile Marker Severity Closure Details Time Periods Source Description
County Road 1050 (-0.3 miles) to County Road 1050 (+0.4 miles) 132.0 to 131.3 Medium Left lane closed, one lane open 10/24/14 7:00 AM to 11/3/14 4:00 PM Indiana Toll Road Bridge Deck Repair; *** Long Term Closure ***
County Road 9 (+0.1 miles) to County Road 850 E (+0.3 miles) 92.0 to 61.0 Major All lanes closed and both shoulders open 10/30/14 8:00 AM to 6:00 PM Indiana Toll Road RPM/Striping; Moving Operation; Will Switch Lanes
at Mccool Rd 26.0 Minor All lanes and shoulders open 6/30/14 7:00 AM to 11/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 11/15/14; ***Long Term Closure***
Exit ramp to I-94 21.0 Major All lanes and shoulders closed 6/30/14 7:00 AM to 3/31/15 11:59 PM Indiana Toll Road Lake Station exit ramp closed for Ramp Demo/Rebuild until Spring 2015.
at I-94 (+0.3 miles) 21.0 Medium Various lanes closed 10/27/14 11:00 PM to 11/9/14 5:00 AM Indiana Toll Road Set Structural Steel and Decking; 20 min. Traffic Holds
Hoffman St to 112th St 5.7 to 1.5 Minor All lanes and shoulders open 6/30/14 7:00 AM to 11/15/14 11:59 PM Indiana Toll Road 11' width & 130,000 lb weight restriction until 11/15/14; ***Long Term Closure***
at Columbia Ave 5.3 Medium Left lane closed, one lane open 10/30/14 10:00 AM to 2:00 PM Indiana Toll Road Joint Seal Install
at Columbia Ave 5.3 Medium Right lane closed, one lane open 10/30/14 2:00 PM to 8:00 PM Indiana Toll Road Joint Seal Intall
at 112th St 2.1 Medium Left lane closed, two lanes open 6/30/14 7:00 AM to 11/9/14 11:59 PM Indiana Toll Road Bridge Reconstruction; ***Long Term Closure***
I-57 / Bishop Ford (I-94) to Eisenhower Expy (I-290) 62.9 to 51.7 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Dan Ryan Expy (I-94) to Cermak Rd (22nd St) Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 10:00 AM to 3:00 PM IDOT Moving Operation
Harrison St to Eisenhower Expy (I-290) 51.7 to 51.7 Minor Right shoulder closed, all lanes open 10/13/14 12:00 AM to 1/5/15 11:59 PM IDOT ***Long Term Closure***
Eisenhower Expy (I-290) to Grand Ave 51.7 to 50.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/30/14 9:30 AM to 1:00 PM IDOT Moving Operation
Eisenhower Expy (I-290) to I-190 51.7 to 79.1 Minor Both shoulders closed, all lanes open with partial ramp closures 10/30/14 9:00 AM to 3:00 PM IDOT Moving Operation
Jackson Blvd to Ohio Feeder 51.5 to 50.4 Medium Left four lanes and left shoulder closed, up to one lanes open 10/30/14 1:00 AM to 5:00 AM IDOT Weave right to left at 2 am
Exit ramp to EB Ohio Feeder 50.5 Minor Partial closure 9/10/14 12:00 AM to 10/31/14 11:59 PM IDOT Approx. 300' of shoulder closed; ***Long Term Closure***
Grand Ave to Ogden Ave 50.5 to 50.1 Minor Right shoulder closed, all lanes open 6/24/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure*** ; Permanent right shoulder closure for remainder of project. Attenuator and barrier wall to be installed.
Entrance ramp from WB Ohio Feeder 50.3 Minor Partial closure 9/3/13 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Ogden Ave to Montrose Ave 50.1 to 43.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/30/14 11:00 AM to 2:00 PM IDOT Moving Operation
Edens Expy (I-94) to Canfield Ave 43.5 to 80.3 Medium Left lane or right lane and both shoulders closed with partial ramp closures 10/30/14 10:00 AM to 1:00 PM IDOT Moving Operation
Canfield Ave to Cumberland Ave (IL-171) 80.3 to 79.7 Minor Right shoulder closed, all lanes open 8/18/14 12:00 AM to 10/31/14 11:59 PM IDOT ***Long Term Closure***
Entrance ramp from NB Cumberland Ave 79.6 Minor Partial closure 10/30/14 9:00 AM to 3:00 PM IDOT
Cumberland Ave (IL-171) to I-190 79.7 to 79.1 Minor All lanes shifted and both shoulders closed 5/18/14 12:00 AM to 11/21/14 11:59 PM IDOT Lanes weaved to the right and reassigned. Lane 3 & Lane 4 exit only to WB I-190; ***Long Term Closure***
Ramp from WB I-90 (Jane Addams Memorial Tollway) to Des Plaines Oasis 76.1 Minor All lanes shifted 8/26/14 12:01 AM to 11/7/14 11:59 PM Illinois Tollway All Lanes Shifted Left; ***Long Term***
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 9/6/14 12:00 AM to 10/30/14 11:59 PM Illinois Tollway ***Long Term Closure*** Detour Posted.
Exit ramp to SB Elmhurst Rd 73.6 Minor Left lane closed, one lane open with partial ramp closures 10/30/14 9:00 AM to 3:30 PM Illinois Tollway Bridge Construction
at Arlington Heights Plaza 71.8 to 71.7 Medium Various lanes closed 9/30/14 12:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure*** Left IPO Lane Closed
Ramp from WB I-90 to Arlington Heights Rd 70.8 to 70.7 Medium Right lane closed, two lanes open 9/8/14 12:00 AM to 11/24/14 11:59 PM Illinois Tollway **Long Term Closure**
IL-58 (+0.6 miles) to I-290 (-0.3 miles) 68.9 to 68.5 Medium Right lane closed, two or three lanes open 10/30/14 6:00 AM to 4:00 PM Illinois Tollway Retaining Wall, Noise Wall and Draining Improvements; RIght Lane of CD Road to I-290/IL-53 closed
Entrance ramp from NB IL-53 Local 68.8 Minor Right shoulder closed, all lanes open 10/30/14 9:00 AM to 3:00 PM IDOT
Meacham Rd (-0.1 miles) to Meacham Rd (+0.2 miles) 67.5 to 67.2 Medium Left lane closed, three lanes open 10/30/14 9:00 AM to 3:00 PM Illinois Tollway Bride Reconstruction, Retaining Walls, Roadway Reconstruction
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Exit ramp to SB Barrington Rd 62.8 Medium Various lanes closed 8/4/14 12:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed.
Exit ramp to NB Barrington Rd 62.8 Medium Various lanes closed 8/4/14 12:00 AM to 10/31/14 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed.
Duncan Ave to IL-31 55.8 to 54.6 Minor All lanes shifted 9/23/14 7:00 AM to 11/21/14 11:59 PM Illinois Tollway All Lanes Shifted Right; ** Long Term **
Belvidere Plaza to Town Hall Rd (+0.3 miles) 23.3 to 21.5 Medium Right lane closed, one to four lanes open 10/30/14 6:00 AM to 3:00 PM Illinois Tollway Electrical Installation
Bypass US-20 to Kishwaukee River 19.8 to 18.4 Medium Left lane and both shoulders closed, one lane shifted 4/2/14 9:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; ***Long Term Closure***
US-20 Bypass (+0.3 miles) to US-20 Bypass (+1.6 miles) 19.5 to 18.2 Medium Right lane closed, one lane open 10/30/14 6:00 AM to 3:00 PM Illinois Tollway Electrical Installation
Kishwaukee River to Mill Rd 18.4 to 17.7 Medium Left lane and both shoulders closed, one lane open 4/1/14 7:00 AM to 10/31/14 11:59 PM Illinois Tollway Pavement Widening; *** Long Term Closure ***
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
Kennedy Rd to Ellendale Rd (-0.1 miles) 170.2 to 163.6 Medium Left lane closed, one lane open 10/30/14 8:00 PM to 10/31/14 6:00 AM WisDOT Construction - Detour: No posted detour
Exit ramp to WB US-12 142.0 Major All lanes and shoulders closed 10/30/14 9:00 PM to 10/31/14 5:00 AM WisDOT Construction - Detour: Continue north on IH-39, exit left to Hwy 30 west, exit left to Hwy 51 south, continue south to USH 12/18.

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Thu Oct 30 11:38:03 CDT 2014