Construction Report
Select Location
  
Updated: 9/1/14 8:30 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Reagan Memorial EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Eola Rd (+0.9 miles) to IL-59 (+0.1 miles) 122.3 to 123.4 Minor All lanes shifted 7/10/14 12:00 AM to 12/1/14 11:59 PM Illinois Tollway All lanes shifted right; ***Long Term Closure ***
IL-59 (+0.3 miles) to Winfield Rd (+0.1 miles) 123.6 to 125.3 Minor All lanes shifted 7/10/14 12:00 AM to 12/1/14 11:59 PM Illinois Tollway All Lanes Shifted Left; *** Long Term Closure ***
Mill St (+0.3 miles) to York Rd 126.0 to 139.0 Medium Various lanes closed 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings

Reagan Memorial WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
York Rd to IL-83 (+0.2 miles) 139.0 to 137.0 Minor Right lane closed, three to six lanes open 9/2/14 9:00 AM to 2:00 PM Illinois Tollway Signing Improvements
York Rd to Mill St (-0.3 miles) 139.0 to 126.0 Medium Various lanes closed 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
Exit ramp to SB IL-83 137.1 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
Exit ramp to NB Highland Ave 134.5 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
Exit ramp to NB I-355 133.5 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
Entrance ramp from SB Downers Dr 133.6 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
Exit ramp to SB I-355 133.3 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
at I-355 (+0.6 miles) 130.8 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation; Pavement Markings
Exit ramp to NB IL-53 130.3 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operation, Pavement Markings
Exit ramp to SB Naperville Rd 127.6 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operations; Pavement Markings
Entrance ramp from SB Naperville Rd 126.9 Minor Both shoulders closed, all lanes open 9/2/14 8:00 PM to 9/3/14 5:00 AM Illinois Tollway Moving Operations; Pavement Markings
Winfield Rd (-0.1 miles) to IL-59 (-0.3 miles) 125.3 to 123.6 Minor All lanes shifted 7/10/14 12:00 AM to 12/1/14 11:59 PM Illinois Tollway All Lanes Shifted Left; *** Long Term Closure ***
IL-59 (-0.1 miles) to Eola Rd (-0.9 miles) 123.4 to 122.3 Minor All lanes shifted 7/10/14 12:00 AM to 12/1/14 11:59 PM Illinois Tollway All lanes shifted right; ***Long Term Closure ***
Farnsworth Ave (-0.1 miles) to Church Rd (+0.3 miles) 119.4 to 118.6 Medium Right lane closed, two or three lanes open 9/2/14 8:00 PM to 10:00 PM Illinois Tollway Bridge Work

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Mon Sep 01 20:44:59 CDT 2014